BOD Load means the number of kilograms of BOD in industrial wastewater, after multiplying the number of litres of industrial wastewater discharged by the number of kilograms per litre indicated by the BOD;

Examples of BOD Load in a sentence

  • The City Engineer will use the information supplied by the waste discharge permit user pursuant to the waste discharge permit provided the information is consistent with the City Engineer’s and Inspector’s readings, inspections and measurements and will, subject to Sentences (i) to (iv) above, utilize such information to measure or estimate the BOD Load, TSS Load and Flow discharged over each relevant measurement period.

  • In case of mixed crops, the area under component crops as reported by household is taken into account.Grossly polluting industriesAs defined by CPCB, MOEF&CC, industries discharging effluents into a water course and (a) Handling hazardous substances, or (b) Effluent having BOD Load of 100 Kg per day or more, or(c) A combination of (a) and (b).GroundwaterWater that collects in porous layers of underground formations known as aquifers.

  • Dewatered sewage sludge was obtained from Wupa Wastewater Treatment Plant (W.W.T.P.) in federal capital territory Abuja and transported down to Abubakar Tafawa Balewa University Bauchi (ATBU Bauchi) in plastic bags as in Fig 1 below, serves the city of Abuja, the Capital of the federal republic of Nigeria with an average design flow of 13120 m3/day), average B.O.D. Load 66,000 kg/day and effluent quality 15/20/10 BOD/TSS/N.

  • The F/M ratio is calculated as follows:- F/M = Organic LoadingVolume of Sludge = BOD Load (kg/d) Volume of Aeration Tank (m3) x MLSS (kg/m3) The CIWEM Handbook of UK Wastewater Practice entitled ‘Activated Sludge Treatment’ lists the following parameters for activated sludge plants:- Treatment ModeSludge Loadingkg BOD/kg MLSS.

  • They show that the optimal production quota for colluding firms is fully compressed (which they refer to as “rigid”) when either hazard rates are increasing or the maximum possible compensation from monopoly pricing is large enough.

  • BOD Load = 240 kg BOD/dMLSS = 3,500 mg/LDesign F/M Ratio = 0.1 kg BOD/kg MLSS Cycle Times:Fill = 4 hAerate = 2 hSettle = 1 h Decant = 1 h (including wasting) TOTAL = 8 h/CycleNo. of Cycles /Tank = 3 Cycles/Tank.dTotal No. Cycles = 3 Cycles/Tank.d x 3 no.

  • Table 4.3 Top 10 Districts in Terms of BOD Load Generation in the Ganga basin Sr. No. District State BOD Generation Sub-basin State-wise BOD generation in descending order is presented in Table 4.4. As expected, UP is the largest generator accounting for 38% of the total, followed by West Bengal at 30%.

  • A surface flow threshold value of 50percent was used to identify water quality samples that were collected during primarily surface runoff events.Allowable BOD Load (kg/day) Observed BOD Load (kg/day) Observed (Surface Flow > 50%)100001000BOD Load (kg/day)1001010% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%Observed Flow Exceedence at P06S12 Figure 3-1.

  • Table 4.4 State-wise Industrial BOD Load Distribution in Ganga Basin Sub-basin wise industrial BOD load generation is presented in Table 4.5. Sub-basins with significant load generation are Lower Ganga II, Upper Yamuna II, Chambal, Ramganga and Hindon.

  • This gives the following results: - Table 5.3 – Daily BOD Load (kg/d) Averaged Over a Week at Bellozanne STW The minimum load of 1,171 kg/d observed in 2010 occurs in August and is low as a result of 2 data points that are substantially lower than the other samples taken over the summer months.

Related to BOD Load

  • Front-end Load means the Sales load which may be included in the offering price of the Units; provided however that different levels of Front-end Load may be applied to different investors, as determined by the Management Company. However aggregate of Front-end Load and Back-end Load should not exceed 3% of Net Asset Value.

  • base load means the load level at which a gas turbine is normally operated.

  • Manual Load Dump Warning means a notification from PJM to warn Members of an increasingly critical condition of present operations that may require manually shedding load.

  • Back-end Load means the charge deducted from the Net Asset Value in determining the Redemption Price; provided however that different levels of Back-end Load may be applied to different classes of Units, as specified in this document.

  • Unfit-for-use tank system means a tank system that has been determined through an integrity assessment or other inspection to be no longer capable of storing or treating hazardous waste without posing a threat of release of hazardous waste to the environment.

  • Modular building manufacturer means a person or corporation who owns or operates a

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Available Flowgate Capability or “AFC” shall mean the rating of the applicable Flowgate less the projected loading across the applicable Flowgate less TRM and CBM. The firm AFC is calculated with only the appropriate Firm Transmission Service reservations (or interchange schedules) in the model, including recognition of all roll-over Transmission Service rights. Non- firm AFC is determined with appropriate firm and non-firm reservations (or interchange schedules) modeled.

  • Capacity Export Transmission Customer means a customer taking point to point transmission service under Tariff, Part II to export capacity from a generation resource located in the PJM Region that has qualified for an exception to the RPM must-offer requirement as described in Tariff, Attachment DD, section 6.6(g).

  • Available RP Capacity Amount means (i) the amount of Restricted Payments that may be made at the time of determination pursuant to Sections 7.06(d), (g), (h) and (l) minus (ii) the sum of the amount of the Available RP Capacity Amount utilized by the Borrower or any Restricted Subsidiary to (A) make Restricted Payments in reliance on Sections 7.06 (g), (h) or (l), (B) incur Liens pursuant to Section 7.01(bb), (C) make Investments pursuant to Section 7.02(n), (D) incur Indebtedness pursuant to Section 7.03(y) and (E) make prepayments, redemptions, purchases, defeasances and other payments in respect of Junior Financings prior to their scheduled maturity utilizing the Available RP Capacity Amount pursuant to Section 7.13 plus (iii) the aggregate principal amount of Indebtedness prepaid prior to or substantially concurrently at such time, solely to the extent such Indebtedness (A) was secured by Liens pursuant to Section 7.01(bb) or (B) was incurred pursuant to Section 7.03(y) and not secured pursuant to Section 7.01(bb) (it being understood that the amount under this clause (iii) shall only be available for use under Sections 7.01(bb) and/or 7.03(y), as applicable).

  • Slug loading means any pollutant, including oxygen demanding pollutants, released in a discharge at a flow rate and/or pollutant concentration as to cause interference in the POTW.

  • Unmetered Load means electricity consumed on the Network that is not directly recorded using Metering Equipment, but is calculated or estimated in accordance with the Code;

  • Load means energy consumed by Customers together with allocated losses and unaccounted for energy;

  • Manual Load Dump Action means an Operating Instruction, as defined by NERC, from PJM to shed firm load when the PJM Region cannot provide adequate capacity to meet the PJM Region’s load and tie schedules, or to alleviate critically overloaded transmission lines or other equipment. Manual Load Dump Warning:

  • Central Contractor Registration (CCR) database means the primary Government repository for Contractor information required for the conduct of business with the Government.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • PJM Region Peak Load Forecast means the peak load forecast used by the Office of the Interconnection in determining the PJM Region Reliability Requirement, and shall be determined on both a preliminary and final basis as set forth in Tariff, Attachment DD, section 5.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Individual subcontracting plan means a subcontracting plan that covers the entire contract period (including option periods), applies to a specific contract, and has goals that are based on the offeror’s planned subcontracting in support of the specific contract, except that indirect costs incurred for common or joint purposes may be allocated on a prorated basis to the contract.

  • Regulated impervious surface means any of the following, alone or in combination:

  • Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.

  • Cost of idle facilities or idle capacity means costs such as maintenance, repair, housing, rent, and other related costs, e.g., insurance, interest, property taxes and depreciation or use allowances.

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • Interconnection Customer means a Generation Interconnection Customer and/or a Transmission Interconnection Customer.

  • Regulated Rate Tariff means a regulated rate tariff for the provision of Electricity Services to eligible customers prepared by EDTI, or a person with whom EDTI makes arrangements to do so, pursuant to section 102 of the Act;

  • Generation Interconnection Customer means an entity that submits an Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission System in the PJM Region. Generation Interconnection Request: