Examples of AREVA in a sentence
It comprises 20 BNIs, including two for the indus- trial operator AREVA (ATPu and LPC), while two others, operated by CEA, are used for IRSN research programmes (CABRI and PHEBUS).
Revision 0, “Small-Break LOCA and NON-LOCA Sensitivity Studies and Methodology,” AREVA NP Inc., October 2007.
We also attended two nuclear- specific meetings organised by Cogent, which included representatives from EDF ENERGY, AREVA, Westinghouse Electric UK Holding Ltd, Doosan Babcock and the Department of Energy and Climate Change (DECC).
Excess Inventory Shipments to, and NU Product and/or LEU Product Shipments from, France (AREVA NC) Figure 2-6.
Three of these sites are commercial nuclear fuel fabrication facilities (FFFs) operated by AREVA NC in Richland, Washington; by Westinghouse Electric Corporation (WEC) at its Columbia Fuel Fabrication Facility (CFFF) near Columbia, South Carolina; and by Global Nuclear Fuel– Americas (GNF-A) near Wilmington, North Carolina.
The CRUD typically consists of Chrome (30%), Nickel (25%), Iron (18%), Cobalt (0.24%) and Oxygen (27%).The above mentioned study [23] concludes as follows:Based on the fact that the Koeberg SG crud is similar to the crud as found in the studied SGs (which includes AREVA units) and the fact that the Koeberg SG construction materials are standard steel and alloy, no toxic elements are present in amounts which will be in conflict with the Vaalputs WAC [19].
Its applicability to the nuclear context is demonstrated by AREVA.
Interoperability test as per IEC 61850 (interoperability with ABB, AREVA, SIEMENS,ERL, GE and SEL) 8.24.0 PRE-COMMISSIONING TESTS8.24.1 The contractor shall have to perform following minimum Pre-commissioning tests for commissioning of the C&R panels.
Realizing the potential of OPC-UA in sensors, AREVA started integrating these into monitoring instruments (SIPLUG®) for mountings and their associated electric drives.
Revision 0, “Codes and Methods Applicability Report for U.S. EPR,” AREVA NP Inc., August 2007.