Aquatic Resource Alteration Permit definition

Aquatic Resource Alteration Permit means a permit pursuant to §69-3-108 of the Tennessee Water Quality Control Act of 1977, which authorizes the alteration of properties of waters of the State which result from activities other than discharges of wastewater through a pipe, ditch or other conveyance. Such a permit shall impose conditions, including standards and terms of periodic review, as are necessary to accomplish the purposes of the Act.
Aquatic Resource Alteration Permit or “ARAP” means a permit pursuant to T.C.A. § 69-3-108 of the Act, which authorizes the alteration of properties of waters of the State which result from activities other than discharges of wastewater through a pipe, ditch or other conveyance.

Examples of Aquatic Resource Alteration Permit in a sentence

  • Habitat alterations authorized by an Aquatic Resource Alteration Permit (ARAP) are de minimis if the Division finds that the impacts, individually and cumulatively, are offset by impact minimization and/or in-system mitigation, provided however, in Outstanding National Resource Waters (ONRWs) the mitigation must occur within the ONRW.

  • Habitat alterations authorized by an Aquatic Resource Alteration Permit (ARAP) are de minimis if the Division finds that the impacts, individually andcumulatively, are offset by impact minimization and/or in-system mitigation, provided however, in Outstanding National Resource Waters (ONRWs) the mitigation must occur within the ONRW.

  • Habitat alterations authorized by an Aquatic Resource Alteration Permit (ARAP) are de minimis if the Division finds that the impacts, individually and cumulatively are offset by impact minimization and/or in-system mitigation, provided however, in ONRWs the mitigation must occur within the ONRW.An “ ecoregion” is a relatively homogeneous area defined by similarity of climate, landform, soil, potential natural vegetation, hydrology, or other ecologically relevant variables.

  • Statements similar to (35) or (37) would be represented in the so-called “inferential perfect” in the closely related IA language Nepali ( cf.

  • No stabilization, erosion control or sediment treatment measures are to be installed in a stream without obtaining an Aquatic Resource Alteration Permit (ARAP).

  • No solid materials, including building materials, shall be placed in waters of the state, except as authorized by a section 404 permit and/or Aquatic Resource Alteration Permit.

  • Habitat alterations authorized by an Aquatic Resource Alteration Permit (ARAP) are de minimis if the Division finds that the impacts, individually and cumulatively are offset by impact minimization and/or in-system mitigation, provided however, in ONRWs the mitigation must occur within the ONRW.

  • An ARAP may be required If your work will disturb or cause alterations of a stream or wetland, you must obtain an appropriate Aquatic Resource Alteration Permit (ARAP).

  • Lab AssignmentsCore objectives: Communication Skills, Critical ThinkingPreviously, this course had an end of semester exit interview in which students answered 4 questions, each one representing a specific type of question.

  • The latter is sometimes referred to as an Aquatic Resource Alteration Permit (ARAP).

Related to Aquatic Resource Alteration Permit

  • Building Permit means a permit for the construction of one or more Units, issued by the City, or other public agency in the event the City no longer issues said permits for the construction of Units within CFD No. 11. For purposes of this definition, "Building Permits" shall not include permits for construction or installation of commercial/industrial structures, parking structures, retaining walls, and utility improvements not intended for human habitation.

  • Public works project means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.