Approved Asset Improvement Cost definition

Approved Asset Improvement Cost means the amount of the Borrower’s (or applicable Borrower Subsidiary’s) cost for an Approved Asset Improvement, following (as applicable) the Freighter Conversion Effective Date or Other Improvement Effective Date in respect of such Approved Asset Improvement, and the Borrower’s procurement and delivery to the Administrative Agent of an Improvement Base Value Appraisal and Improvement Current Market Value Appraisal of the related Aircraft.

Related to Approved Asset Improvement Cost

  • Improvement Costs means any additional expenditure on a fixed asset that materially increases the capacity of the asset or materially improves its functioning or represents more than 10% of the initial depreciation base of the asset;

  • Development Cost means the total of all costs incurred in the completion of a Development excluding Developer Fee, operating deficit reserves, and total land cost as typically shown in the Development Cost line item on the development cost pro forma.

  • Public improvement costs means the costs of:

  • Needs Improvement the Educator’s performance on a standard or overall is below the requirements of a standard or overall, but is not considered to be unsatisfactory at this time. Improvement is necessary and expected.  Unsatisfactory: the Educator’s performance on a standard or overall has not significantly improved following a rating of needs improvement, or the Educator’s performance is consistently below the requirements of a standard or overall and is considered inadequate, or both.

  • Project Cost means the costs incurred in connection with the

  • Original Project Cost means the capital expenditure incurred by the Generating Company or the Transmission Licensee, as the case may be, within the original scope of the project up to the cut-off date as admitted by the Commission;

  • Equipment Cost means, for each Unit, the purchase price therefor -------------- paid by the Owner Trustee to the Lessee pursuant to Section 2 of the Participation Agreement and as set forth in Schedule 1 to the Participation Agreement with respect to such Unit. Notwithstanding anything to the contrary contained in the Operative Agreements, the Equipment Cost for any Replacement Unit shall be deemed to be the Equipment Cost or deemed Equipment Cost of the Unit replaced by such Replacement Unit.

  • Minimum Improvements means the acquisition of land and construction of a 152-unit market rate residential apartment building, construction of a stormwater pond and related improvements. The Minimum Improvements are more fully depicted in Exhibit B, which is attached hereto and incorporated herein.

  • Estimated Project Cost means Benchmark cost of MNRE which is Rs 8.00 Crore/MWp as per MNRE letter no. 03/20/2014-15/GCRT/11.12.14 at the time of Bid Due date.

  • Home improvement means the remodeling, altering,

  • Total Development Cost means the total of all costs incurred in the completion of a Development, all of which shall be subject to the review and approval by the Credit Underwriter and the Corporation pursuant to this rule chapter, and as further described in Rule 67-48.0075, F.A.C.

  • Substitute Improvements means the substitute or additional improvements of the Issuer described in Article V hereof.

  • Home improvement contract means an oral or written

  • Site Improvements means any construction work on, or improvement to, streets, roads, parking facilities, sidewalks, drainage structures and utilities.

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • Capital Improvement Project means the acquisition, construction, reconstruction, improvement, planning and equipping of roads and bridges, appurtenances to roads and bridges to enhance the safety of animal-drawn vehicles, pedestrians, and bicycles, wastewater treatment facilities, water supply systems, solid waste disposal facilities, and storm water and sanitary collection, storage and treatment facilities including real property, interests in real property, facilities, and equipment related or incidental to those facilities.

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.

  • Project Improvements means site improvements and facilities that are:

  • Home improvement contractor or "contractor" means a person who sells goods and services, or agrees to furnish or render services, to a retail buyer pursuant to a home improvement installment contract, or sells goods and services to a retail buyer pursuant to a home improvement charge agreement, but not in connection with construction of new homes.

  • Replacement Cost means the cost to repair or rebuild the improvements owned by Lessor at the time of the occurrence to their condition existing immediately prior thereto, including demolition, debris removal and upgrading required by the operation of applicable building codes, ordinances or laws, and without deduction for depreciation.

  • Leasehold Improvements means all buildings, structures, improvements and fixtures located on any Leased Real Property which are owned by Company or any Company Subsidiary, regardless of whether title to such buildings, structures, improvements or fixtures are subject to reversion to the landlord or other third party upon the expiration or termination of the lease for such Leased Real Property.

  • Full Replacement Cost as used herein shall mean the actual replacement cost of the Leased Property requiring replacement from time to time including an increased cost of construction endorsement, if available, and the cost of debris removal. In the event either party believes that full replacement cost (the then-replacement cost less such exclusions) has increased or decreased at any time during the Lease Term, it shall have the right to have such full replacement cost re-determined.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Tenant Improvements Defined in Exhibit B, if any.

  • Construction in Progress means, as of any date, the book value (determined in accordance with GAAP) of any Projects then under development; provided that a Project shall no longer be included in Construction in Progress and shall be deemed to be a stabilized project upon the earlier of (a) the expiration of the second full fiscal quarter after substantial completion (the earlier of receipt of a temporary certificate of occupancy or a final certificate of occupancy) of such Project and (b) the last day of the fiscal quarter in which the annualized Consolidated Net Operating Income attributable to such Project divided by the Capitalization Rate exceeds the book value of such Project.