Write a Site-Specific Measurement and Verification Plan Sample Clauses

Write a Site-Specific Measurement and Verification Plan. The goal of this subtask is to develop a detailed Measurement and Verification Plan for each site. The Recipient shall: • Develop a detailed Site-Specific Measurement and Verification (M&V) which will: ○ Describe of the monitoring equipment and instrumentation to be used at each site. ○ Describe key input parameters and output metrics to be measured. ○ Identify required data acquisition criteria, such as sampling frequency for various parameters. ○ Identify additional information necessary to complete the measurement and verification task. ○ Identify standard operating conditions used as a baseline for the M&V plan. Products: • Site-Specific Measurement and Verification Plan (draft and final)
AutoNDA by SimpleDocs
Write a Site-Specific Measurement and Verification Plan. The goal of this subtask is to develop a detailed Measurement and Verification Plan for each site. The Recipient shall: • Develop a detailed Site-Specific Measurement and Verification (M&V) Plan, to include: ○ A description of the monitoring equipment and instrumentation to be used at each site. ○ A description of the key input parameters and output metrics to be measured. ○ Identification of required data acquisition criteria, such as sampling frequency for various parameters to meet IPMVP and CEC requirements ○ Identification of additional information necessary to complete the measurement and verification task. ○ Identification of standard operating conditions used as a baseline for the M&V plan. Products: • Site-Specific Measurement and Verification Plan (draft and final)

Related to Write a Site-Specific Measurement and Verification Plan

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project demonstration site or use third party vendor for measurement and verification (M&V) of GHG and energy consumption reduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site(s) • Develop M&V protocol for pre-installation measurement (and calculations) following Section II.B.2 of the grant solicitation manual3: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are be upgraded and/or replaced and/or modified; and o If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used; o A description of the key input parameters and output metrics which will be measured; o A description of the M&V protocol and analysis methods to be employed; and o A description of the independent, third-party measurement and verification services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified.  Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. 3 GFO-18-903, Food Production Investment Program, California Energy Commission, November 2018. xxxxx://xxx.xxxxxx.xx.xxx/contracts/GFO-18-903/000_FPIP_Solicitation_Manual.docx • Prepare and provide a Post-installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Access to Network Interface Device (NID 2.4.3.1. Due to the wide variety of NIDs utilized by BellSouth (based on subscriber size and environmental considerations), Mpower may access the on-premises wiring by any of the following means: BellSouth shall allow Mpower to connect its loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premise. Mpower agrees to install compatible protectors and test jacks and to maintain the protection system and equipment and to indemnify BellSouth pursuant to Section 8 of the General Terms and Conditions of this Agreement.

  • Authorized User Overview and Mini-Bid Process Project Based IT Consulting Services Contracts enable Authorized Users to use a competitive Mini-bid Process to acquire Services on an as-needed basis, for qualified IT Projects. Project Based IT Consulting Services may include, but will not be limited to projects requiring: analysis, data classification, design, development, testing, quality assurance, security and associated training for Information Technology based applications. See section 1.3 Out of Scope Work for a listing of projects expressly excluded from the scope of this Contract. An Authorized User Agreement for Project Based IT Consulting Services will be governed first by the terms and conditions specified in the OGS Centralized Contract and second by terms and conditions added to the Authorized User Statement of Work. Additional terms and conditions shall not conflict with or modify the terms and conditions of the OGS Centralized Contract. NYS Executive Agencies must adhere to all internal processes and approvals including, as required, approval from NYS Office of Information Technology Services. Other Authorized Users must adhere to their own internal processes and approvals. In accordance with Appendix B, section 28, Modification of Contract Terms, an Authorized User may add additional required terms and conditions to this Mini-Bid and resultant Authorized User Agreement only if such terms and conditions (1) are more favorable to the Authorized User and (2) do not conflict with or supersede the OGS Centralized Contract terms and conditions. Examples of additional terms and conditions include: • Expedited delivery timeframe; • Additional incentives, such as discount for expedited payment/Procurement Card use; and • Any additional requirements imposed by the funding source or Federal law.

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Measurement and Billing The Parties shall measure Interconnection in accordance with this Section 4.6 and xxxx in accordance with Article XXVII and this Section 4.6.

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:

  • SERVICE MONITORING, ANALYSES AND ORACLE SOFTWARE 11.1 We continuously monitor the Services to facilitate Oracle’s operation of the Services; to help resolve Your service requests; to detect and address threats to the functionality, security, integrity, and availability of the Services as well as any content, data, or applications in the Services; and to detect and address illegal acts or violations of the Acceptable Use Policy. Oracle monitoring tools do not collect or store any of Your Content residing in the Services, except as needed for such purposes. Oracle does not monitor, and does not address issues with, non-Oracle software provided by You or any of Your Users that is stored in, or run on or through, the Services. Information collected by Oracle monitoring tools (excluding Your Content) may also be used to assist in managing Oracle’s product and service portfolio, to help Oracle address deficiencies in its product and service offerings, and for license management purposes.

Time is Money Join Law Insider Premium to draft better contracts faster.