Working Parameter Sample Clauses

Working Parameter a) The area required to be excavated shall be shown in the plan / drawing given by the Engineer-In-Charge. The Contractor should sign the plan with pre-level survey and same should be the base plan for working. b) The area thus set out shall be cleared from all obstruction such as rubbish of all kind, vegetation, ▇▇▇▇ etc. No additional payment shall be made to the Contractor for such works. c) After clearance of site, the central line of excavation will be given by the Engineer- In-Charge or his representative and it will be the responsibility of the Contractor to go ahead with further detailed layout, bench marks etc. The permanent bench marking by constructing pillars, centres shall be permanently laid by the Contractor at his own cost and shall remain at places till handing over the work/completion of the work. d) The proposed site including the size of the block may vary depending upon geo- mining conditions and subject to mine working condition. e) The site of dumping as shown in plan or as originally conceived may change depending on availability of space. f) The deployment of equipment is to be done by the Contractor, considering the working conditions, depth of the mine working, etc. in consultation with the EIC. g) Excavation shall include removal of coal/soil as deliberated at 1(i) & (ii), all kinds (wet or dry) exactly in accordance with all levels and contours shown on the plan or as directed by the Engineer-In-Charge. No extra payment will be allowed for removal of semi liquid mud/sludge during the entire excavation of soil / or rock including coal and the rate quoted for the respective items of work shall be deemed to have been covered by the same. It shall be taken to the exact level and gradient of the lowest floor and the sides shall be cut by maintaining the statutory benches as required for the purpose. h) Environment Protection Act, 1986 and rules and regulations made thereunder from time to time are to be strictly followed for blast hole drilling, blasting, excavation, loading, hauling and dumping of broken rocks / soil-earth by mechanical means. Air pollution control measures are to be adopted as per SPCB and CPCB norms. Sufficient Sprinklers are to be used to prevent air pollution. Dumping of OB shall be at specified location. Height of dump, slope of the dump is to be followed as per instruction of EIC. The Contractors shall follow the relevant provisions of clearance, as communicated by Ministry of Environment, Forest and Climate ...

Related to Working Parameter

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Service Specification The Parties have agreed upon the scope and specification of the Services provided under this Service Agreement in the Service Specification.

  • Project Plan Development of Project Plan Upon the Authorized User’s request, the Contractor must develop a Project Plan. This Project Plan may include Implementation personnel, installation timeframes, escalation procedures and an acceptance plan as appropriate for the Services requested. Specific requirements of the plan will be defined in the RFQ. In response to the RFQ, the Contractor must agree to furnish all labor and supervision necessary to successfully perform Services procured from this Lot. Project Plan Document The Contractor will provide to the Authorized User, a Project Plan that may contain the following items: • Name of the Project Manager, Contact Phone Numbers and E-Mail Address; • Names of the Project Team Members, Contact Phone Numbers and E-Mail Address; • A list of Implementation milestones based on the Authorized User’s desired installation date; • A list of responsibilities of the Authorized User during system Implementation; • A list of designated Contractor Authorized Personnel; • Escalation procedures including management personnel contact numbers; • Full and complete documentation of all Implementation work; • Samples of knowledge transfer documentation; and • When applicable, a list of all materials and supplies required to complete the Implementation described in the RFQ. Materials and Supplies Required to Complete Implementation In the event that there are items required to complete an Implementation, the Contractor may request the items be added to its Contract if the items meet the scope of the Contract. Negotiation of Final Project Plan If the Authorized User chooses to require a full Project Plan, the State further reserves the right for Authorized Users to negotiate the final Project Plan with the apparent RFQ awardee. Such negotiation must not substantively change the scope of the RFQ plan, but can alter timeframes or other incidental factors of the final Project Plan. The Authorized User will provide the Contractor a minimum of five (5) business days’ notice of the final negotiation date. The Authorized User reserves the right to move to the next responsible and responsive bidder if Contractor negotiations are unsuccessful.

  • Quality Management Grantee will: 1. comply with quality management requirements as directed by the System Agency. 2. develop and implement a Quality Management Plan (QMP) that conforms with 25 TAC § 448.504 and make the QMP available to System Agency upon request. The QMP must be developed no later than the end of the first quarter of the Contract term. 3. update and revise the QMP each biennium or sooner, if necessary. ▇▇▇▇▇▇▇’s governing body will review and approve the initial QMP, within the first quarter of the Contract term, and each updated and revised QMP thereafter. The QMP must describe ▇▇▇▇▇▇▇’s methods to measure, assess, and improve - i. Implementation of evidence-based practices, programs and research-based approaches to service delivery; ii. Client/participant satisfaction with the services provided by ▇▇▇▇▇▇▇; iii. Service capacity and access to services; iv. Client/participant continuum of care; and v. Accuracy of data reported to the state. 4. participate in continuous quality improvement (CQI) activities as defined and scheduled by the state including, but not limited to data verification, performing self-reviews; submitting self-review results and supporting documentation for the state’s desk reviews; and participating in the state’s onsite or desk reviews. 5. submit plan of improvement or corrective action plan and supporting documentation as requested by System Agency. 6. participate in and actively pursue CQI activities that support performance and outcomes improvement. 7. respond to consultation recommendations by System Agency, which may include, but are not limited to the following: i. Staff training; ii. Self-monitoring activities guided by System Agency, including use of quality management tools to self-identify compliance issues; and iii. Monitoring of performance reports in the System Agency electronic clinical management system.

  • Pre-Commencement Phase Services The services required to be provided by the Contractor for the Pre- Commencement Phase of the Project in accordance with the Contract Documents.