UNMT Settings Sample Clauses

UNMT Settings. In the training process for UNMT, we used the transformer-based UNMT toolkit5 and the settings of Xxxxxx et al. (2018b). That is, we used four 3xxxxx://xxxxxx.xxx/facebookresearch/ fastText 4xxxxx://xxxxxx.xxx/artetxem/vecmap 5xxxxx://xxxxxx.xxx/facebookresearch/ UnsupervisedMT layers in both the encoder and the decoder. Three out of the four encoder and decoder layers were shared between the source and target languages. The dimension of the hidden layers was set to 512. Training used a batch-size of 32 and the Xxxx optimizer (Xxxxxx and Ba, 2015) with an initial learning rate of 0.0001, β1 = 0.5. The vocabulary size was set to 60k by concatenating the source and target corpora. We performed 140 epochs6 (approximately 500K iterations) to train every model. The case-sensitive BLEU score computed with the multi bleu.perl script from Moses7 was used as the evaluation metric. For model selection, we followed the strategy described by Xxxxxx et al. (2018a). That is, the BLEU score computed between the original source sentences − 6The definition of epoch in UNMT is different from that in NMT. We followed the settings in Xxxxxx et al. (2018b)’s toolkit, i.e., 3500 iterations as one epoch.‌ 7xxxxx://xxxxxx.xxx/moses-smt/ mosesdecoder and their reconstructions was used as the criterion. We selected the model that had the highest average BLEU score over the two translation directions. For the proposed methods, both UBWE agreement regularization and UBWE adversarial training were added as objective functions at the beginning of UNMT training. The detailed parameter settings are discussed in Section 6.
AutoNDA by SimpleDocs

Related to UNMT Settings

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Interconnection Product Options Interconnection Customer has selected the following (checked) type of Interconnection Service:

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5.1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Network Upgrades and Distribution Upgrades The Participating TO shall design, procure, construct, install, and own the Network Upgrades and Distribution Upgrades described in Appendix A. The Interconnection Customer shall be responsible for all costs related to Distribution Upgrades. Unless the Participating TO elects to fund the capital for the Distribution Upgrades and Network Upgrades, they shall be solely funded by the Interconnection Customer.

  • DELIVERY, STORAGE, AND HANDLING The Contractor shall be responsible to inspect all components on delivery to ensure that no damage occurred during shipping or handling for furnish and installation projects. For equipment only purchases, the ordering entity shall be responsible to inspect all components on delivery. Materials must be stored in original undamaged packaging in such a manner to ensure proper ventilation and drainage, and to protect against damage, weather, vandalism, and theft until ready for installation.

Time is Money Join Law Insider Premium to draft better contracts faster.