Trail Alignment Alternatives Technical Memorandum Sample Clauses

Trail Alignment Alternatives Technical Memorandum. Prepare a draft technical memorandum documenting the above and submit for review by the City. Receive comments from the City, prepare a final memorandum with comments incorporated, and submit to the City.
AutoNDA by SimpleDocs

Related to Trail Alignment Alternatives Technical Memorandum

  • Alternate Work Schedules Workweeks and work shifts of different numbers of hours may be established for overtime-eligible employees by the Employer in order to meet business and customer service needs, as long as the alternate work schedules meet federal and state law. When there is a holiday, employees may be required to switch from their alternate work schedules to regular work schedules.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Alternative Work Schedules Alternative work schedule means an approved schedule for an Employee that deviates from the work week described in Section 1, Section 2, or a schedule that deviates from a worksite’s normal schedule. Employees who work a “shift work schedule” as part of a rotating group of individuals who must continuously maintain a 24-hour operation or facility are not eligible for an alternative work schedule.

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Alternative Work Schedule An alternate forty (40) hour work schedule (other than five (5) uniform and consecutive eight (8) hour days in a seven (7) day period), or for hospital personnel an eighty (80) hour workweek in a fourteen (14) day period and other mutually agreed upon schedules that comply with applicable federal and state law. Employee work schedules normally include two (2) consecutive days off.

  • How Do I Get More Information? For more information, including the full Notice, Claim Forms and Settlement Agreement go to xxx.xxxxxxxxxxxxxxxxxxxx.xxx, contact the settlement administrator at 0-000-000-0000, or call Class Counsel at 1-866-354-3015. Exhibit E UNITED STATES DISTRICT COURT FOR THE SOUTHERN DISTRICT OF FLORIDA Xxxxx v. AvMed, Inc., Case No. 10-cv-24513 If You Paid for or Received Insurance from AvMed, Inc. at Any Time Through December of 2009, You May Be Part of a Class Action Settlement. IMPORTANT: PLEASE READ THIS NOTICE CAREFULLY. THIS NOTICE RELATES TO THE PENDENCY OF A CLASS ACTION LAWSUIT AND, IF YOU ARE A MEMBER OF THE SETTLEMENT CLASSES, CONTAINS IMPORTANT INFORMATION ABOUT YOUR RIGHTS TO MAKE A CLAIM UNDER THE SETTLEMENT OR TO OBJECT TO THE SETTLEMENT (A federal court authorized this notice. It is not a solicitation from a lawyer.) Your legal rights are affected whether or not you act. Please read this notice carefully. YOUR LEGAL RIGHTS AND OPTIONS IN THIS SETTLEMENT SUBMIT A CLAIM FORM This is the only way to receive a payment. EXCLUDE YOURSELF You will receive no benefits, but you will retain any rights you currently have to xxx the Defendant about the claims in this case. OBJECT Write to the Court explaining why you don’t like the Settlement. GO TO THE HEARING Ask to speak in Court about your opinion of the Settlement. DO NOTHING You won’t get a share of the Settlement benefits and will give up your rights to xxx the Defendant about the claims in this case. These rights and options – and the deadlines to exercise them – are explained in this Notice. QUESTIONS? CALL 0-000-000-0000 TOLL FREE, OR VISIT XXX.XXXXXXXXXXXXXXXXXXXX.XXX PARA UNA NOTIFICACIÓN EN ESPAÑOL, LLAMAR O VISITAR NUESTRO WEBSITE BASIC INFORMATION

  • ELECTRICITY INFORMATION EXCHANGE PROTOCOLS 31.1 Protocols for exchanging information: The Distributor and the Trader must, when exchanging information to which an EIEP listed in Schedule 3 relates, comply with that EIEP.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

Time is Money Join Law Insider Premium to draft better contracts faster.