Temporary Reassignment Due to Equipment or Facilities Failures Sample Clauses

Temporary Reassignment Due to Equipment or Facilities Failures. 151. If service is down on any rail line or trolley coach route due to equipment or facilities failure, SFMTA may, in its sole discretion, reassign Operators to the extra board at their home division or platform for the length of the outage.
AutoNDA by SimpleDocs

Related to Temporary Reassignment Due to Equipment or Facilities Failures

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.

  • Recovery of Schedule Delays During Last Sixty Days of Contract Time At any time during the last sixty days of the Contract Time that the Design Professional finds that the Contractor is behind schedule per the Contract Time, as amended, the Design Professional shall notify the Contractor in writing. Within seven days of the date of the Design Professional's notice, the Contractor shall prepare and deliver to the Design Professional and Owner a written plan explaining how the Contractor intends to bring the Project back on schedule. The Contractor's plan must provide sufficient detail to allow the Design Professional and Owner to determine the proposal's feasibility.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • REPAIRED OR REPLACED PARTS / COMPONENTS Where the Contractor is required to repair, replace or substitute Product or parts or components of the Product under the Contract, the repaired, replaced or substituted Products shall be subject to all terms and conditions for new parts and components set forth in the Contract including Warranties, as set forth in the Additional Warranties Clause herein. Replaced or repaired Product or parts and components of such Product shall be new and shall, if available, be replaced by the original manufacturer’s component or part. Remanufactured parts or components meeting new Product standards may be permitted by the Commissioner or Authorized User. Before installation, all proposed substitutes for the original manufacturer’s installed parts or components must be approved by the Authorized User. The part or component shall be equal to or of better quality than the original part or component being replaced.

  • REPORT OF CONTRACT USAGE All fields of information shall be accurate and complete. The report is to be submitted electronically via electronic mail utilizing the template provided in Microsoft Excel 2003, or newer (or as otherwise directed by OGS), to the attention of the individual shown on the front page of the Contract Award Notification and shall reference the Group Number, Award Number, Contract Number, Sales Period, and Contractor's (or other authorized agent) Name, and all other fields required. OGS reserves the right to amend the report template without acquiring the approval of the Office of the State Comptroller or the Attorney General.

  • Equipment Usage The equipment must remain in use for the specific project for which it was obtained in accordance with 2 CFR § 200.313(c)(1), unless the provision in 2 CFR § 200.313(c)(4) applies.

  • Cost of Repairs 54.1 Loss or damage to the Works or Materials to be incorporated in the Works between the Start Date and the end of the Defects Correction periods shall be remedied by the Contractor at the Contractor's cost if the loss or damage arises from the Contractor's acts or omissions.

  • Customer-Provided Equipment Comcast shall have no obligation to install, operate, or maintain Customer-Provided Equipment. Customer alone shall be responsible for providing maintenance, repair, operation and replacement of all inside telephone wiring and equipment and facilities on the Customer’s side of the cable modem, route and/or coaxial input connection. All Customer-Provided Equipment and wiring that Customer uses in connection with the Services must be fully compatible with the Services. Customer shall be responsible for the payment of all charges for troubleshooting, maintenance or repairs attempted or performed by Comcast’s employees or authorized contractors when the difficulty or trouble report results from Customer-Provided Equipment.

  • CONSTRUCTION OF THE BUS TERMINAL 12.1 Obligations prior to commencement of construction Prior to commencement of Construction Works, the Concessionaire shall:

Time is Money Join Law Insider Premium to draft better contracts faster.