SUB - SUBSTATIONS Sample Clauses

The 'SUB - SUBSTATIONS' clause defines the requirements and standards for the construction, installation, and operation of electrical substations within a project. It typically outlines specifications for equipment, safety protocols, site preparation, and testing procedures that must be followed by contractors or suppliers. By establishing clear guidelines for substation works, this clause ensures the reliability, safety, and compliance of the electrical infrastructure, thereby minimizing risks and potential operational issues.
SUB - SUBSTATIONS. Based on the number of high voltage substations weighted for Voltage (Voltage < 500kv = 1; Voltage >= 500kv = 2). Used primarily for the allocation of related engineering and technical support for transmission and distribution substation operations and maintenance as well as for engineering and project management associated with substation construction. Based on the number of telephones within each Legal Entity at period end. Used for the allocation of costs associated with maintenance and support of telephones.

Related to SUB - SUBSTATIONS

  • Electrical connections In accordance with paragraph 5.11. However, if a rear position lamp is reciprocally incorporated with a direction- indicator, the electrical connection of the rear position lamp on the relevant side of the vehicle or the reciprocally incorporated part of it may be such that it is switched OFF during the entire period (both ON and OFF cycle) of activation of the direction-indicator lamp.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call ▇-▇▇▇-▇▇▇-▇▇▇▇). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and