Stormwater Quantity Controls. The intent of stormwater quantity control facilities is to slow down stormwater flow discharged to the environment from developed sites. Impervious surfaces, such as roads and roofs, quicken the rate of stormwater runoff into natural streams that can create flooding. Stormwater quantity control facilities mitigate the increased runoff by providing temporary storage and controlling the release rate from the site to prevent flooding and erosion. Detention and retention facilities may be designed as ponds or underground facilities. Detention facilities function by providing temporary storage of stormwater runoff to be released at a controlled rate. The intent of the detention facility is to match the pre-developed runoff rates for several specific storm events in the developed condition. Retention facilities are typically located in areas where water soaks easily into the ground. Retention facilities provided temporary storage while allowing the water to soak into the ground, mimicking natural conditions. There is typically no release of stormwater to other pipes offsite or water bodies.
AutoNDA by SimpleDocs

Related to Stormwater Quantity Controls

  • Water Quality 8.1. The Supply shall comply with the quality standards imposed by the Act and the Water Quality Regulations, PROVIDED ALWAYS that where a particular standard is the subject of a legal instrument accepted or issued by the Secretary of State or the Chief Inspector of Drinking Water under the provisions of the Act or the Water Quality Regulations, compliance with the terms of the relevant legal instrument shall be deemed to be compliance with the relevant quality standard imposed by the Act or the Water Quality Regulations (as the case may be), in which case the Water Company shall provide the New Appointee with a certified copy of any such authorised departure or undertaking. Each party undertakes to keep the other party fully informed of any discussions which take place at any time hereafter with the Secretary of State for the proposed issue of a legal instrument and of the outcome thereof.

  • Power Quality Neither the facilities of Developer nor the facilities of Connecting Transmission Owner shall cause excessive voltage flicker nor introduce excessive distortion to the sinusoidal voltage or current waves as defined by ANSI Standard C84.1-1989, in accordance with IEEE Standard 519, or any applicable superseding electric industry standard. In the event of a conflict between ANSI Standard C84.1-1989, or any applicable superseding electric industry standard, ANSI Standard C84.1-1989, or the applicable superseding electric industry standard, shall control.

  • Indoor Air Quality The Employer shall ensure a healthful air quality and attempt to ensure comfortable air temperature in buildings it owns and in space that it leases.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Air Quality To the extent applicable, Consultant must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the South Coast Air Quality Management District (SCAQMD) and/or California Air Resources Board (CARB). Although the SCAQMD and CARB limits and requirements are more broad, Consultant shall specifically be aware of their application to "portable equipment", which definition is considered by SCAQMD and CARB to include any item of equipment with a fuel-powered engine. Consultant shall indemnify City against any fines or penalties imposed by SCAQMD, CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Consultant, its subconsultants, or others for whom Consultant is responsible under its indemnity obligations provided for in this Agreement.

  • Use; Quality Control a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos.

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • DISPOSAL OF WASTE MATERIAL Purchaser may sidecast waste material on side slopes up to 45% if the waste material is compacted and free of organic debris. On side slopes greater than 45%, all waste material must be end hauled or pushed to the designated embankment sites and waste areas identified in Clause 0-00 XXXXX XXXX XXXXXXXX.

Time is Money Join Law Insider Premium to draft better contracts faster.