SITE SUMMARY Sample Clauses

SITE SUMMARY. Former Key Energy Service Station No. 408 000 X. Xxxxxxxxxxxx Xxxxxx Xxxxx, Xxxxxxx Former Keystop/Kangaroo Service Station No. 423 0000 00xx Xxxxxx Xxxx Xxxxxxxxx, Xxxxxxx Former Service Xxxxxxx Xx. 000 0000 Xxxxxxxx Xxxxx Xxxxx, Xxxxxxx Former Key Energy Service Station No. 427 000 Xxxxxx Xxxxxx (xx Xxxxxxx Xxxxxx) Xxxxx, Xxxxxxx Former Service Xxxxxxx Xx. 000 0000 X.X. Xxxxxxx 000 Xxxxx 0xx Xxxxxx Xxxxxxxxxxx, Xxxxxxx Former Keystop/Kangaroo Service Station No. 430 0000 X.X. Xxxx Xxxxxx Xxxxx, Xxxxxxx Former Service Station No. 439 458 Venice By-Pass Venice, Florida Former Keystop/Kangaroo Service Station No. 440 00000 00xx Xxxxxx Xxxxx Xxxxxxxx, Xxxxxxx Former Service Xxxxxxx Xx. 000 X.X. Xxxxxxx 00 at State Road 35A Dade City, Florida Former Keystop Service Station No. 444 0000 Xxxx Xxxxxxxxxxxx Xxxxxx Xxxxx, Xxxxxxx Former Keystop/Kangaroo Service Station No. 445 00000 X.X. Xxxxxxx 00 Xxxx Xxxxxx, Florida
AutoNDA by SimpleDocs

Related to SITE SUMMARY

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate Gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

  • JOB SUMMARY In accordance with the Vision, Purpose, and Values, and strategic direction of the Vancouver Island Health Authority, patient safety is a priority and a responsibility shared by everyone at VIHA; as such, the requirement to continuously improve quality and safety is inherent in all aspects of this position. Within a multi-site operation, the Admitting & Health Records Clerk performs admitting, switchboard, transcription, records processing, cashier and reception duties as well as a variety of clerical duties.

  • Site Description 2.5.1 If reasonably requested by the A/E as necessary for the Project, the Owner shall furnish a legal description and a certified land survey of the Site, giving, as applicable, grades and lines of streets, alleys, pavements and adjoining property; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the Site; locations, dimensions, and complete data pertaining to existing buildings, other improvements, and trees; and full information concerning available service and utility lines, both public and private, above and below grade, including inverts and depths.

  • Expense Summary The information set forth in the Prospectus in the Fee Table has been prepared in accordance with the requirements of Form N-2 and to the extent estimated or projected, such estimates or projections are reasonably believed to be attainable and reasonably based.

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • Project Name Register ASIC

  • Project Overview Project Title [Drafting note: ARENA to complete. Insert full long name in accordance with ARENA’s naming convention] i.e. [GMS Number] [Powerworks, voltage control on the Pacific Islands Study] [GMS Number] [study/ project/ fellowship/ scholarship/ R&D Project] Contract Number [Drafting note: ARENA to complete – to be obtained from ARENA’s GMS] Recipient [Drafting note: Recipient to insert full legal name and ABN] Guidelines and policies Advancing Renewables Program – Program Guidelines, 2020 (xxxxx://xxxxx.xxx.xx/xxxxxx/0000/00/XXXXX_XXX_Xxxxxxxxxx_XX_Xxxxxx_Xxxxx_XXXXX.xxx) ARENA Variation Policy (xxxxx://xxxxx.xxx.xx/xxxxxx/0000/00/xxxxx-xxxxxxx-xxxxxxxxx-xxxxxxxxx-xxxxxx.xxx) ARENA Report Writing Guidelines (xxxxx://xxxxx.xxx.xx/xxxxxx/0000/00/xxxxx-xxxxxx-xxxxxxx-xxxxxxxxxx.xxx)

  • Service Description The Parties will provide Common Channel Signaling (CCS) to one another via Signaling System 7 (SS7) network Interconnection, in accordance with prevailing industry standards. Use of a third party provider of SS7 trunks is permitted.

  • Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Entrance treatment for 150' cross-rip; debris block (slash, earth, berm, rocks, etc.) + seed + water bar T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout NFSR Road No. Lane Width & Maintenance Level Mile Marker Begin End 9312 Single Lane / Level 1 NFSR 300 0.00 END 0.40

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.

Time is Money Join Law Insider Premium to draft better contracts faster.