Common use of Ship Loading Time Test Clause in Contracts

Ship Loading Time Test. The Ship Loading Time Test shall be conducted to determine whether the Project has achieved the ship loading time performance specified in the FEED Document no. 25611-200-3BD-M04-00002 rev E, “Basis of Design (BOD) Summary,” Table 1, item 3.25. The Ship Loading Time Test shall be conducted in accordance with the Ship Loading Time Conditions (specified below), the Project Commissioning Plan and the testing procedures specified below in this Attachment S.

Appears in 4 contracts

Samples: Escrow Agreement (Sabine Pass Liquefaction, LLC), Escrow Agreement (Cheniere Energy Partners LP Holdings, LLC), Escrow Agreement (Cheniere Energy Partners LP Holdings, LLC)

AutoNDA by SimpleDocs

Ship Loading Time Test. The Ship Loading Time Test shall be conducted to determine whether the Project has achieved the ship loading time performance specified in the FEED Document no. 2561125744-200-3BD-M04-00002 rev E004, “Basis of Design (BOD) Summary,” Table 1, item 3.25. A minimum test period of 2 hours shall be required to verify 12,000 m3/hr. rate. The Ship Loading Time Test shall be conducted in accordance with the Ship Loading Time Conditions (specified below), the Project Commissioning Plan and the testing procedures specified below in this Attachment S.

Appears in 2 contracts

Samples: Engineering, Procurement and Construction Agreement (Cheniere Energy Inc), Escrow Agreement (Cheniere Energy Inc)

AutoNDA by SimpleDocs

Ship Loading Time Test. The Ship Loading Time Test shall be conducted to determine whether the Project has achieved the ship loading time performance specified in the FEED Document no. 2561126089-200-3BD-M04-00002 rev E, 00B “Basis of Design (BOD) Summary,” Table 1, item 3.254.2. A minimum test period of 2 hours shall be required to verify 12,000 m3/hr rate. The Ship Loading Time Test shall be conducted in accordance with the Ship Loading Time Conditions (specified below), the Project Commissioning Plan and the testing procedures specified below in this Attachment S.19. The conditions upon which the Ship Loading Time Test are based (“Ship Loading Time Conditions”) are as follows:

Appears in 1 contract

Samples: Procurement and Construction Agreement (Tellurian Inc. /De/)