Sherco Units 1 and 2 Study Sample Clauses

Sherco Units 1 and 2 Study. NSP intends to conduct mercury sampling on Sherco units 1 and 2 in 2001, to determine if increasing the SO2 removal rate has any impact on the removal of mercury across the wet scrubbers. This will not be done if one of the boilers chosen in item 6 is Sherco units 1 or 2 or if it is determined to be unlikely to provide additional reduction of mercury.
AutoNDA by SimpleDocs

Related to Sherco Units 1 and 2 Study

  • Target Population The Grantee shall ensure that diversion programs and services provided under this grant are designed to serve juvenile offenders who are at risk of commitment to Department.

  • Vendor Development Rights To the extent not inconsistent with Customer’s rights in the Work Product or as set forth herein, nothing in this Contract shall preclude Vendor from developing for itself, or for others, materials which are competitive with those produced as a result of the Services provided hereunder, provided that no Work Product is utilized, and no Intellectual Property Rights of Customer therein are infringed by such competitive materials. To the extent that Vendor wishes to use the Work Product, or acquire licensed rights in certain Intellectual Property Rights of Customer therein in order to offer competitive goods or services to third parties, Vendor and Customer agree to negotiate in good faith regarding an appropriate license and royalty agreement to allow for such.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Planning Periods Teachers in secondary schools shall receive not less than 225 minutes of unassigned planning time on a weekly basis and shall be scheduled for one unassigned planning period per day of not less than forty-five (45) consecutive minutes. Neither this provision, nor 8.8 below will apply during times when the normal school schedule must be adjusted during emergencies; or in cases when an individual teacher has requested in writing to teach more than the usual number of periods for teachers in that subject in that school, or in the case of a teacher who volunteers for other school activities during the scheduled unassigned planning period.

  • Bargaining Unit Roster Upon the signing of this Agreement and monthly thereafter, the Employer shall supply to the Union via a secured method an alphabetical list of all employees covered by this Agreement. The list shall include the name, address, employee identification number, date of hire, rehire date (if applicable), shift, FTE, job classification, department cost center number, unit, hourly rate of pay and monthly gross earnings. Each month, the Employer will provide a list of new hires and addresses, and a list of all employees who have terminated during the month via a secured method. The new hire and termination lists shall include the same data as the monthly employee roster except for monthly gross earnings. The termination list shall include the termination date. Within ninety (90) days of ratification, Swedish Medical Center and SEIU 1199NW will convene a work group including HRIS expert to explore a method for the Employer to provide a list of all employment changes for bargaining unit employees, via a secure site.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Multi-year Planning Targets Schedule A may reflect an allocation for the first Funding Year of this Agreement as well as planning targets for up to two additional years, consistent with the term of this Agreement. In such an event, the HSP acknowledges that if it is provided with planning targets, these targets:

  • Development Plans 4.3.1 For each Licensed Indication and corresponding Licensed Product in the Field, Licensee will prepare and deliver to Licensor a development plan and budget (each a “Development Plan”). The initial Development Plans for each Licensed Indication will be delivered within […***…] after the Grant Date for such Licensed Indication.

  • Unbundled Voice Loop – SL2 (UVL-SL2 Loops may be 2-wire or 4-wire circuits, shall have remote access test points, and will be designed with a DLR provided to NewPhone. SL2 circuits can be provisioned with loop start, ground start or reverse battery signaling. OC is provided as a standard feature on XX0 Xxxxx. The OC feature will allow NewPhone to coordinate the installation of the Loop with the disconnect of an existing customer’s service and/or number portability service. In these cases, BellSouth will perform the order conversion with standard order coordination at its discretion during normal work hours.

  • CLASS SIZE/STAFFING LEVELS The board will make every effort to limit FDK/Grade 1 split grades where feasible. APPENDIX A – RETIREMENT GRATUITIES

Time is Money Join Law Insider Premium to draft better contracts faster.