Quality Control Tests Sample Clauses

Quality Control Tests. The results from the moisture, strength, and maximum dry density and optimum moisture content tests. All tests shall be clearly documented on hard copies and/or electronically and shall be identifiably related to the test results in the diary.
AutoNDA by SimpleDocs
Quality Control Tests. The Supplier shall perform all applicable Quality Control Tests on each Product prior to shipment to AMO or its Affiliates. Each Lot of Products delivered to AMO or its Affiliates shall be accompanied by a Certificate of Conformance, fully completed by the Supplier, certifying that the Products have passed all applicable Quality Control Tests and fully comply with all Product Specifications.
Quality Control Tests. Catalent shall ensure that the Parties adopt from time to time quality control tests and that representative samples of Bulk Drug Substance and Drug Product are taken, analyzed and retained in accordance with the Specifications, cGMPs, applicable Laws and Regulatory Acts and the Quality Agreement, using quality control methods provided by or agreed with Sarepta and validated by Catalent prior to the release of the Batches.
Quality Control Tests. Third Wave shall disclose to Endogen particulars of the results of Third Wave's quality control tests carried out on the Third Wave Deliverables and Cleavase Enzymes provided hereunder if these particulars are requested by Endogen and will at the request of Endogen permit a duly authorized representative of Endogen to visit and review the quality control and quality assurance procedures of Third Wave with respect to the Third Wave Deliverables and Cleavase Enzymes provided hereunder.
Quality Control Tests. As may be provided for in the Scope of Work, Catalent shall ensure that representative samples of Bulk Drug Substance and Drug Product are taken, analyzed and retained in accordance with the Specifications, cGMPs and the Quality Agreement, ​
Quality Control Tests. The contractor shall at his own cost set up Laboratory at site of work to carry out the testing of materials which are to be used for the work. This laboratory shall be approved by the Engineer-in- charge. The testing shall be done as per frequencies mentioned in the specification/additional specification of each item of Schedule 'B'. The 30% of the test included in Annexure 'A' (On Page No. 103) shall be carried out in Vigilance and Quality Control Laboratory at the cost of contractor and balance 70% in the site laboratory. The test which are not included in Annexure 'A' 50% test shall be carried out each in Vigilance and Quality Control laboratory and site laboratory. The frequency of testing of construction materials is mentioned in Annexure-B on Page No. 104 to 105.
Quality Control Tests. Until the parties execute the Quality Agreement, this Section 7.1 shall govern quality control; once the Quality Agreement is executed, it shall supplant this Section 7.1 in its entirety.
AutoNDA by SimpleDocs
Quality Control Tests 

Related to Quality Control Tests

  • Quality Control Program The Contractor shall describe the Quality Control Program in a written document which shall be reviewed by the Engineer prior to the start of any production, construction, or off-site fabrication. The written Quality Control Program shall be submitted to the Engineer for review at least ten (10) calendar days before the start of construction. The Quality Control Program shall be organized to address, as a minimum, the following items:

  • Quality Control A. Controlled Affiliate agrees to use the Licensed Marks and Name only in connection with the licensed services and further agrees to be bound by the conditions regarding quality control shown in attached Exhibit A as they may be amended by BCBSA from time-to-time.

  • Quality Control Plan Within forty five (45) days after the design development documents are approved, the Design-Builder shall develop a quality control plan for the Project (the “Quality Control Plan”). A draft of the Quality Control Plan shall be submitted to the Department and shall be subject to the Department’s review and approval. The Quality Control Plan shall be tailored to the specific products/type of construction activities contemplated by the GMP Basis Documents, and in general, shall include a table of contents, quality control team organization, duties/responsibilities of quality control personnel, submittal procedures, inspection procedures, deficiency correction procedures, documentation process, and a list of any other specific actions or procedures that will be required for key elements of the Work.

  • Alcohol Testing Alcohol testing will be conducted by using an evidential breath testing device (EBT) approved by the National Highway Traffic Safety Administration. Non-EBT devices may be used for initial screening tests. A screening test will be conducted first. If the result is an alcohol concentration level of less than 0.02, the test is considered a negative test. If the alcohol concentration level is 0.02 or more, a second confirmation test will be conducted. Levels of .04 or greater on the confirmation test will be considered positive.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Health plan specification The Employer will require health plans participating in the Group Insurance Program to develop and implement health promotion and health education programs for State employees and their dependents.

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.

Time is Money Join Law Insider Premium to draft better contracts faster.