Purpose of Excess Capacity Charge Sample Clauses

Purpose of Excess Capacity Charge. The Authority’s costs to construct the Authority’s Waterworks System and any other facilities for which Bonds have been issued shall be paid for with a combination of Fixed Costs charges determined in accordance with Section 6.3, and Excess Capacity Charges determined in accordance with this Section. The intent of Excess Capacity Charges is to recover the costs for excess capacity built into the Authority’s Waterworks Systems and any other facilities for which Bonds have been issued.
AutoNDA by SimpleDocs

Related to Purpose of Excess Capacity Charge

  • CAISO ACA Charge The CAISO ACA Charge is the product of the Unit’s Billable MWh for the Billing Month and the applicable annual charge for short-term sales under 18 CFR Section 382.201 of the FERC Regulations. Schedule C Variable Cost Payment for All Conditions Part 5 for Biomass Generation Units For each month and each Unit, the Variable Cost Payment for Billable MWH from the Unit pursuant to Nonmarket Transaction during that Month shall be the amount calculated in accordance with the following formula: Variable Cost Payment = A.

  • Global Access Transport Charges (U S. Bridged): Per-minute per-bridge port usage charges, based on availability of service, zone and origination access type. Bridging charges are additional and are priced at Customer's applicable Toll Meet Meet-Me Access rate per minute. Freephone (IFN) Transport Zone A – G. Discounts:

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Adjustment to Installed Capacity Estimate Permitted reduction

  • Minimum Charge The minimum charge against accumulated vacation leave shall be fifteen (15) minutes. Vacation leave shall be compensated at the employee’s base rate of pay, except as otherwise provided in this Agreement.

  • CAISO Monthly Billed Fuel Cost [for Geysers Main only] The CAISO Monthly Billed Fuel Cost is given by Equation C2-1. CAISO Monthly Billed Fuel Cost Equation C2-1 = Billable MWh ◆ Steam Price ($/MWh) Where: • Steam Price is $16.34/MWh. • For purposes of Equation C2-1, Billable MWh is all Billable MWh Delivered after cumulative Hourly Metered Total Net Generation during the Contract Year from all Units exceeds the Minimum Annual Generation given by Equation C2-2. Equation C2-2 Minimum Annual Generation = (Annual Average Field Capacity ◆ 8760 hours ◆ 0.4) - (A+B+C) Where: • Annual Average Field Capacity is the arithmetic average of the two Field Capacities in MW for each Contract Year, determined as described below. Field Capacity shall be determined for each six-month period from July 1 through December 31 of the preceding calendar year and January 1 through June 30 of the Contract Year. Field Capacity shall be the average of the five highest amounts of net generation (in MWh) simultaneously achieved by all Units during eight-hour periods within the six-month period. The capacity simultaneously achieved by all Units during each eight-hour period shall be the sum of Hourly Metered Total Net Generation for all Units during such eight-hour period, divided by eight hours. Such eight-hour periods shall not overlap or be counted more than once but may be consecutive. Within 30 days after the end of each six-month period, Owner shall provide CAISO and the Responsible Utility with its determination of Field Capacity, including all information necessary to validate that determination. • A is the amount of Energy that cannot be produced (as defined below) due to the curtailment of a Unit during a test of the Facility, a Unit or the steam field agreed to by CAISO and Owner. • B is the amount of Energy that cannot be produced (as defined below) due to the retirement of a Unit or due to a Unit’s Availability remaining at zero after a period of ten Months during which the Unit’s Availability has been zero. • C is the amount of Energy that cannot be produced (as defined below) because a Force Majeure Event reduces a Unit’s Availability to zero for at least thirty (30) days or because a Force Majeure Event reduces a Unit’s Availability for at least one hundred eighty (180) days to a level below the Unit Availability Limit immediately prior to the Force Majeure Event. • The amount of Energy that cannot be produced is the sum, for each Settlement Period during which the condition applicable to A, B or C above exists, of the difference between the Unit Availability Limit immediately prior to the condition and the Unit Availability Limit during the condition.

  • Adjustment for Volume Deficit If Sale Area Map indicates that there are incompletely Marked subdivisions and if Contracting Officer determines that a deficit in the estimated volume will cause the volume cut to be less than 90 percent of the total estimate shown in A2, Forest Service, upon request by Purchaser, shall des- ignate additional timber within Sale Area. Such additional timber shall be limited to that estimated to be necessary to reach approximately the estimated volumes by species listed in A2. Any such additional designation shall be con- sistent with land and resource management plans.

  • Actual Contract Duration Description / Performance Very poor (1) Poor (2) Fair (3) Good (4) Excellent (5) Quality of office administration Quality of site management Competence of xxxxxxx Co-operation during contract Quality of workmanship Quality of materials Project management Rectification of condemned work Tidiness of site Adequacy of equipment Adequacy of labour force Procurement of materials Labour relations Any other remarks considered necessary to assist in evaluation of the contractor? ………………………………………………………………………………………………………………………………………...

  • Paying Electricity Charges pay for electricity and other utilities consumed in or relating to the Said Flat And Appurtenances.

  • FREQUENCY AND CAPACITY LEVELS No restriction on frequency, capacity and aircraft type

Time is Money Join Law Insider Premium to draft better contracts faster.