Common use of Project Reports Clause in Contracts

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraph. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.

Appears in 4 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

AutoNDA by SimpleDocs

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphacceptable to the Association. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such report.

Appears in 4 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphacceptable to the Association. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 4 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators acceptable to the Association and set forth below in sub-paragraph (2) of this paragraphthe Project Operation Manual. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 4 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. (a) The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2b) of this paragraph. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 4 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semestersix months, and shall be furnished to the Association not later than 45 days one month after the end of the period covered by such report.

Appears in 4 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. (a) The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphacceptable to the Association. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty five days after the end of the period covered by such report.

Appears in 4 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such report.

Appears in 3 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semestera Fiscal Year trimester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 3 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphacceptable to the Association. Each Project Report shall cover the period of one calendar semestersix months, and shall be furnished to the Association not later than 45 days one month after the end of the period covered by such report.

Appears in 3 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one six (6) calendar semestermonths, and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such report.

Appears in 3 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semestera Fiscal Year trimester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 3 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 3 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.

Appears in 3 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraph. Each Project Report shall cover the period of one calendar semestersix months, and shall be furnished to the Association not later than 45 days one month after the end of the period covered by such report.

Appears in 3 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphacceptable to the Association. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 3 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 2.06 of the General Standard Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of Annex to this paragraphSchedule. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Association Bank not later than 45 days two (2) months after the end of the period covered by such report.

Appears in 3 contracts

Samples: Gef Trust Fund Grant Agreement, Gef Trust Fund Grant Agreement, Fund Grant Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators the indicator set forth below in sub-paragraph (2) of this paragraph2 below. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.

Appears in 3 contracts

Samples: Financing Agreement, Ng Financing Agreement, Ng Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 3 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 3 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semestersix (6) months, and shall be furnished to the Association not later than 45 sixty (60) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphacceptable to the Association. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semestersix (6) months, and shall be furnished to the Association not later than 45 days one (1) month after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Grant Number

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions Conditions, and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphthe Operational Manual for the Project, acceptable to the Association. Each Project Report report shall cover the period of one calendar semesterthree (3) months, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall and cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (Annex A to this Schedule 2) of this paragraph. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association and set forth below in sub-paragraph (2) of this paragraphthe Project Implementation Manual. Each Project Report shall cover the period of one calendar semester, ninety (90) days and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare shall prepare, and cause UETCL to prepare, Project Reports for the Project, all in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphthe Project Implementation Manuals. Each Project Report shall cover the period of one calendar semestersix months, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such reportperiod.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below out in sub-paragraph (2) of Attachment 1 to this paragraphSchedule. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare cause Project Reports to be prepared in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphSchedule 3 to the Project Agreement. Each Project Report shall cover the period of one calendar semestera Fiscal Year trimester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association and set forth below in sub-paragraph (Paragraph 2) of this paragraph. Each Project Report shall cover the period of one calendar semesterFiscal Year, and shall be furnished to the Association not later than 45 days three months after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semester(1) quarter, and shall be furnished to the Association not later than 45 sixty (60) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphacceptable to the Association. Each Project Report shall cover the period of one six calendar semestermonths, and shall be furnished to the Association not later than 45 forty five days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphacceptable to the Association. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of referred to under Schedule 5 to this paragraphAgreement. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such reportperiod.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraph. Each Project Report shall cover the period of one calendar semestersix months, and shall be furnished to the Association not later than 45 forty five days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) -paragraph 2 of this paragraph. Part A. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty five days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphSchedule 6 to the Original Financing Agreement. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare or cause to be prepared Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (the Annex to this Schedule 2) of this paragraph. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraph2 below. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators acceptable to the Association and set forth below in sub-paragraph (2) of this paragraphthe Project Implementation Manual. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphacceptable to the Association. Each Project Report shall cover the period of one calendar semester(1) fiscal year, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators satisfactory to the Association set forth below in sub-paragraph (2) of this paragraphthe PIM. Each Project Report shall cover the period of one calendar semestersix months, and shall be furnished to the Association not later than 45 days one month after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall establish and thereafter maintain a system, satisfactory to the Association, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of the Annex to this paragraphSchedule. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 days one month after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2b) of this paragraph. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Ta Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor ensure the monitoring and evaluate evaluation of the progress of the Project and prepare Project Reports Reports, all in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraph. Each Project Report shall cover the period of one calendar semestersix months, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall cause the Project Implementing Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each The first Project Report shall cover the period of one calendar semesterbetween the Effective Date and the first June or December following that date, and shall be furnished to the Association not later than 45 days one month after the end of that period. Thereafter, each Project Report shall cover the period of six months (being January through June or July through December), and shall be furnished to the Association not later than one month after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Grant Number

Project Reports. 1. (a) The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2b) of this paragraph. Each Project Report shall cover the period of one calendar semestersix months, and shall be furnished to the Association not later than 45 sixty (60) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. (a) The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2b) of this paragraph. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period calendar semester covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphSchedule 6 to the Loan Agreement. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period first or last six (6) months of one the calendar semesteryear, and shall be furnished to the Association not later than 45 days one month after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators acceptable to the Association set forth below in sub-paragraph (2) of this paragraphthe Project Implementation Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semestersix months, and shall be furnished to the Association not later than 45 days one month after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Et Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set agreed with the Association and sent forth below in sub-paragraph (2) of this paragraphthe PIM. Each Project Report shall cover the period of one (1) calendar semestertrimester, and shall be furnished to the Association not later than 45 forty- five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphacceptable to the Association. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 thirty days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semester, six months and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of Annex 1 to this paragraphSchedule. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

AutoNDA by SimpleDocs

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of the Appendix to this paragraphSchedule. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association and set forth below in sub-paragraph (2) the Side Letter Agreement between the Recipient and the Association, of this paragrapheven date herewith. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 days one month after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of Part E and Part F of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators for the Original Project and this Project set forth below in sub-paragraph (2) of this paragraphthe PIM. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators satisfactory to the Association set forth below in sub-paragraph (2) of this paragraphthe Project Implementation Manual. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall, and shall cause EDD to, monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2b) of this paragraph. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators acceptable to the Association and set forth below in sub-paragraph (2) of this paragraphthe Project Implementation Manual. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. (a) The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2b) of this paragraph. Each Project Report shall cover the period of one a calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphacceptable to the Association. Each Project Report shall cover the period of one six calendar semestermonths, and shall be furnished to the Association not later than 45 days one month after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 days one (1) month after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphacceptable to the Association. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall shall, together with the Project Implementing Entity, monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraph2 below. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 30 days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. (a) The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the XXX General Conditions and on the basis of indicators set forth below in sub-paragraph (2b) of this paragraph. Each Project Report shall cover the period of one (1) calendar semesteryear, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the revised indicators as set forth below in sub-paragraph (2) of this paragraphthe amended Operational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and cause the Project Implementing Entity to prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphthe Operations Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty five days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. (a) The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) Schedule 5 of this paragraphthe Original Agreement. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished by the Recipient to the Association not later than 45 forty five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semester, quarter and shall be furnished to the Association not later than 45 days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphSchedule 5 to the Original Development Credit Agreement as amended by the Amendment Agreement. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphacceptable to the Association. Each Project Report shall cover the period of one (1) calendar semesteryear, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphthe Regional Monitoring and Evaluation Indicators. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Association not later than 45 thirty (30) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate evaluate, and cause to be monitored and evaluated, the progress of the Project and prepare shall cause to be prepared Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall establish and thereafter maintain arrangements, satisfactory to the Association, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of the annex to this paragraphSchedule. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 days one month after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphacceptable to the Association. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall cause the Project Implementing Entities to monitor and evaluate the progress of the Project and prepare Project Reports in accordance inter alia with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphConditions. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not no later than 45 days after the end of the period covered by such report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 4.08(b) of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 1 contract

Samples: Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one (1) calendar semester, semester and shall be furnished to the Association not later than 45 days after the end of the period covered submitted by such reportSeptember 30 and March 31 respectively, starting March 31, 2007.

Appears in 1 contract

Samples: Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphthe Performance Indicators. Each Project Report shall cover the period of one calendar semestersix months, and shall be furnished to the Association not later than 45 days two months after the end of the period covered by such report.

Appears in 1 contract

Samples: Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate evaluate, or cause to be monitored or evaluated, the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphacceptable to the Association. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 thirty (30) days after the end of the period covered by such report.

Appears in 1 contract

Samples: Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare quarterly Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each quarterly Project Report shall cover the period of one calendar semesterthree (3) month, and shall be furnished to the Association not later than 45 days one (1) month after the end of the period covered by such report.

Appears in 1 contract

Samples: Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2b) of this paragraph. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 1 contract

Samples: Financing Agreement

Project Reports. 1. The Recipient Recipient, through the Project Implementing Entity, shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one a calendar semester, quarter and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 1 contract

Samples: Financing Agreement

Project Reports. 1. (a) The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association and set forth below in sub-paragraph (2) a letter of this paragrapheven date herewith. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Association not later than 45 forty- five (45) days after the end of the period covered by such report.

Appears in 1 contract

Samples: Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one (1) calendar semester, commencing with the first semester of 2008, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 1 contract

Samples: Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphthe Project Indicators acceptable to the Association. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 1 contract

Samples: Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in sub-paragraph (2) of this paragraph2 acceptable to the Association. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Association not later than 45 forty-five (45) days after the end of the period covered by such report.

Appears in 1 contract

Samples: Financing Agreement

Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators set forth below in sub-paragraph (2) of this paragraphagreed with the Association. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Association not later than 45 (45) forty five days after the end of the period covered by such report.

Appears in 1 contract