Project Record Drawings Sample Clauses
Project Record Drawings. Project record drawings are the property of the OWNER and approval/acceptance of final as-built drawings will be completed before final payment is made.
1. The ARCHITECT/ENGINEER will deliver to the OWNER one (1) complete reproducible set of the project record drawings, including all applicable disciplines, showing all work developed in the ARCHITECT/ENGINEER'S office, plus all change orders, revisions, details, etc., recorded on the Project site by the CONTRACTOR and/or the OWNER'S REPRESENTATIVE made during the period of construction. The CONTRACTOR will be required to deliver to the ARCHITECT/ENGINEER one compete set of project drawings marked up with all changes that occurred during construction at the site, and reflecting exactly how the project was constructed. The ARCHITECT/ENGINEER will be responsible for the accuracy of drawings developed in the ARCHITECT/ENGINEER'S office. The ARCHITECT/ENGINEER will not be responsible for the changes at the site that are not provided by the CONTRACTOR.
2. The OWNER will review the as-built record drawings for completion, accuracy and other requirements. The drawings will be returned to the ARCHITECT/ENGINEER for corrections as necessary. The ARCHITECT/ENGINEER will make any corrections and deliver revised as-built drawings to the OWNER.
3. Upon OWNER'S final approval, the ARCHITECT/ENGINEER will provide one (1) complete set of appropriately labeled as-built drawings on mylar and:
a. an electronic copy of all project record drawings on CD or DVD. The files will be in both PDF and CAD (AutoCAD 2006 or higher) format. CAD files will include all support files required to display and plot the files in the same manner as their submittals. Include all drawings contained in the hard copy submittal necessary for replicating a complete document set. These files will include, but are not limited to, Linetypes, plot configuration/style table files, font files, raster images, other graphic files, etc. The requirement for electronic form projects record drawings will consist of all information produced for the Construction Documents, including site and floor plans, major building elevations, cross-sections, minor cross-sections, mechanical & electrical systems, detail drawings, etc.
b. A Computer Aided Design and Drafting (CADD) copy of the project record drawings in electronic form on CD, which consists of the format, organization, and type of drawings, as directed by the OWNER, and as described in the current version of the...
Project Record Drawings. The Drawings and Project Specifications as prepared under Construction Documents that have been revised to incorporate changes to the project subsequent to the issue of the bidding documents for the project. Changes to be incorporated shall be based on information provided by the Contractor (“As‐Built Drawings”) and include, but not be limited to, addenda, change orders, Requests for Information, construction alterations, and all other changes to the physical components of the project. Changes shall be incorporated into the appropriate location within the original contract documents. Simple attachments to the original DSA approved document set are not acceptable. Project Space Program: The Project Space Program that defines size and number of the educational spaces and support facilities for the Project. Sustainability: Sustainability is the physical development and institutional operations practices that meet the needs of the present users without compromising the ability of future generations to meet their own needs, particularly with the regard to use and waste of natural resources. Sustainable practices support ecological, human, and economic health and vitality. Sustainability presumes that resources are finite, and should be used conservatively and wisely with a view to long term priorities and consequences of the ways in which resources are used. Work: The construction and services required by the Contract Documents, whether completed or partially completed, and including, all other labor, materials, equipment and services provided by the Contractor to fulfill the Contractor’s obligations. The Work may constitute the whole or a part of the Project
Project Record Drawings. The DB team will maintain a set of construction documents (field as-built drawings) to record actual construction changes during the construction process as required by the RFP specifications. The project record drawings will be available for review by the VA Project Engineer at all times.
Project Record Drawings. The Contractor shall maintain a Project record set of drawings at the Project site with all changes or deviations from the original drawings neatly marked thereon in a contrasting color. The Contractor shall also maintain a Project record set of specifications at the Project site, noting therein by appropriate section the names, models, and other distinguishing characteristics of the materials actually incorporated into the Work. This Project record set of drawings and specifications shall be updated daily as the Project progresses and shall be made available to the Owner and Architect for inspection at all times. Upon final completion of the Work and before final payment, this Project record set of drawings and specifications shall be delivered to the Architect for the Owner.
Project Record Drawings. .1 Refer to requirements of Div 01.
.2 Nothing herein contained can be construed to relieve the trade from making good and perfect work in all usual details of construction and in accordance with best standard practice and in strict compliance with the provisions of any and all laws and ordinances, and the rules and regulations of any duly constituted public body having jurisdiction over this work.
.3 One (1) set of white prints, and an electronic disk will be provided for record drawing purposes. Maintain project "as-built" record drawings and accurately record significant deviations from the Contract Documents, caused by site condition or Contract change. ▇▇▇▇ changes on white prints in "Red". At the completion of the project, and prior to final inspection, transfer "as-built" information and notations to reproducible transparencies and submit both sets to the Architect for review.
Project Record Drawings. The Program Manager shall cause its Construction Manager, to prepare “Record Drawings” for the Project showing all technical elements of the Project as actually constructed and installed, following completion of the Project. The Program Manager shall deliver these “Record Drawings” to the County, on the Final Payment Date. The “Record Drawings” shall be the sole and exclusive property of the County, upon Final Payment, and neither the Program Manager nor its architect or engineer or any other person claiming by or through the Program Manager shall have any rights or interest in such Record Drawings.
Project Record Drawings. LAN will coordinate with the contract to receive redlines and prepare one (1) PDF set of record drawings.
Project Record Drawings. A. Submit as-built documents.
B. Include location of end-of-line devices.