Project Coordinated Installation Clause Samples

Project Coordinated Installation. A Project Coordinated Installation permits CLEC to obtain a coordinated installation for Unbundled Loops with or without LNP, where CLEC orders Unbundled DS1-capable, Unbundled DS3-capable or twenty-five (25) or more DS0 Unbundled Loops. 9.2.2.9.7.1 The date and time for the Project Coordinated Installation requires up-front planning and may need to be negotiated between CenturyLink and CLEC. All requests will be processed on a first come, first served basis and are subject to CenturyLink's ability to meet a reasonable demand. Considerations such as system down time, Switch upgrades, Switch maintenance, and the possibility of other CLECs requesting the same Frame Due Time (FDT) in the same Switch (Switch contention) must be reviewed. In the event that any of these situations would occur, CenturyLink will negotiate with CLEC for an agreed upon FDT, prior to issuing the Firm Order Confirmation (FOC). In special cases where CLEC is ordering Unbundled Loop with LNP, the FDT must be agreed upon, the interval to reach agreement will not exceed two (2) days from receipt of an accurate LSR. In addition, standard intervals will apply. 9.2.2.9.7.2 CLEC shall request a Project Coordinated Installation by submitting a Local Service Request (LSR) and designating this order as a Project Coordinated Installation in the remarks section of the LSR form. 9.2.2.9.7.3 CLEC will incur additional charges for the Project Coordinated Installation dependent upon the coordinated time. The rates are based upon whether the request is within CenturyLink's standard installation hours or out of hours. CenturyLink standard installation hours for Unbundled Loops are 8:00 a.m. to 5:00 p.m. (local time), Monday through Friday, excluding holidays. Where LNP is included, see Section 10.2.5.4 for rate elements.
Project Coordinated Installation. A project coordinated installation permits SBCT to obtain a coordinated installation for Unbundled Loops with or without LNP, where SBCT orders Unbundled DS1 Capable, Unbundled DS3 Capable or twenty five (25) or more DS0 Unbundled Loops. 9.2.2.9.7.1 The date and time for the project coordinated installation requires up-front planning and may need to be negotiated between Qwest and SBCT. All requests will be processed on a first come, first served basis and are subject to Qwest’s ability to meet a reasonable demand. Considerations such as system down time, switch upgrades, switch maintenance, and the possibility of other CLECs requesting the same FDT in the same switch (switch contention) must be reviewed. In the event that any of these situations would occur, Qwest will negotiate with SBCT for an agreed upon FDT, prior to issuing the Firm Order Confirmation (FOC). In special cases where SBCT is ordering Unbundled Loop with LNP, the FDT must be agreed upon, the interval to reach agreement will not exceed two (2) days from receipt of an accurate LSR. In addition, standard intervals will apply. 9.2.2.9.7.2 SBCT shall request a project coordinated installation by submitting a Local Service Request (LSR) and designating this order as a project coordinated installation in the remarks section of the LSR form. 9.2.2.9.7.3 SBCT will incur additional charges for the project coordinated installation dependent upon the coordinated time. The rates are based upon whether the request is within Qwest’s normal business hours or Out Of Hours. Qwest normal business hours for Unbundled Loops are 8:00 a.m. to 5:00 p.m., Monday through Friday. The rates for coordinated installations are set forth in Exhibit A. Where LNP is included, see Section 10.2.5.4 for rate elements. 9.2.2.9.7.4 Qwest will schedule the appropriate number of employees prior to the cut, normally not to exceed four employees, based upon information provided by SBCT. If the Project Coordinated Installation includes LNP, SBCT will also have appropriate personnel scheduled for the negotiated FDT. If SBCT’s information is modified during the installation, and, as a result, non-scheduled employees are required, SBCT shall be charged a three (3) hour minimum callout charge per each additional non-scheduled employee. If the installation is either cancelled, or supplemented (supp) to change the due date, within twenty four (24) hours of the negotiated FDT, SBCT will be charged a one (1) person three (3) hour minimum ...

Related to Project Coordinated Installation

  • Project Coordination The Engineer shall coordinate all subconsultant activity to include quality and consistency of deliverables and administration of the invoices and monthly progress reports. The Engineer shall coordinate with necessary local entities.

  • Software Installation The AGENCY shall request approval in writing from the COUNTY prior to installation of any software on COUNTY computer equipment. All software installations must be supervised by COUNTY technical support staff and proof of licensing is required. Upon completion, the AGENCY is responsible for reconfiguring the computers back to the original state.

  • Project Coordinator The Project Coordinator coordinates and manages the Project and represents the Participants before Stichting LSH-TKI. Participants appoint [Participant] as Project Coordinator and authorize Mr/Mrs ……….. to carry out the tasks set forth under this Section 6.7 and Section 6.8. In particular, the Project Coordinator shall be responsible for: preparing the meetings, proposing decisions and preparing the agenda of Project Committee chairing the meetings, preparing the minutes of the meetings and monitoring the implementation of decisions taken at meetings; monitoring compliance by the Participants with their obligations; keeping the address list of Members and other contact persons updated and available; collecting and reviewing information on the progress of the Project and submitting outline scientific reports and other deliverables (including financial statements and related certification), if required, to Stichting LSH-TKI and other Participants; transmitting promptly documents and information connected with the Project; administration of the Budget and fulfilling the financial tasks, all as described in Article 7; providing, upon request, the Participants with official copies or originals of documents which are in the sole possession of the Project Coordinator when such copies or originals are necessary for the Participants to present claims. The Project Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Participant.

  • Utility Coordination Identify all potential utility conflicts and provide preliminary office check plans showing the problem locations, posted to the City’s FTP site. Plans will clearly identify specific utility company facilities by color and by name (i.e. not just “gas” or “fiber optic”). ENGINEER shall include a conflict list for each utility, also posted to the FTP site. ENGINEER shall meet with utility company representatives to review plans and utility verification forms (Attachment No. 3 to Exhibit “A”) at each milestone date and as directed by the CITY and as determined necessary by the ENGINEER. This in- formation will be compiled into a summary report (Attachment No. 4 to Exhibit “A” also available on the City’s FTP site) maintained and updated by ENGINEER as necessary to present a cohesive and reflective status of utilities, and provided to the City as necessary. ENGINEER shall maintain involvement with utility companies until all conflicts have been resolved (not just identified). When appropriate, the City Engineer will approve the identification on plans of conflicts to be resolved during construction. ENGINEER shall meet with involved utility company/ies and project contractor to resolve any conflicts with utilities that occur during construction.

  • Installation Services The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1