Project Coordinated Installation. A project coordinated installation permits SBCT to obtain a coordinated installation for Unbundled Loops with or without LNP, where SBCT orders Unbundled DS1 Capable, Unbundled DS3 Capable or twenty five (25) or more DS0 Unbundled Loops. 9.2.2.9.7.1 The date and time for the project coordinated installation requires up-front planning and may need to be negotiated between Qwest and SBCT. All requests will be processed on a first come, first served basis and are subject to Qwest’s ability to meet a reasonable demand. Considerations such as system down time, switch upgrades, switch maintenance, and the possibility of other CLECs requesting the same FDT in the same switch (switch contention) must be reviewed. In the event that any of these situations would occur, Qwest will negotiate with SBCT for an agreed upon FDT, prior to issuing the Firm Order Confirmation (FOC). In special cases where SBCT is ordering Unbundled Loop with LNP, the FDT must be agreed upon, the interval to reach agreement will not exceed two (2) days from receipt of an accurate LSR. In addition, standard intervals will apply. 9.2.2.9.7.2 SBCT shall request a project coordinated installation by submitting a Local Service Request (LSR) and designating this order as a project coordinated installation in the remarks section of the LSR form. 9.2.2.9.7.3 SBCT will incur additional charges for the project coordinated installation dependent upon the coordinated time. The rates are based upon whether the request is within Qwest’s normal business hours or Out Of Hours. Qwest normal business hours for Unbundled Loops are 8:00 a.m. to 5:00 p.m., Monday through Friday. The rates for coordinated installations are set forth in Exhibit A. Where LNP is included, see Section 10.2.5.4 for rate elements. 9.2.2.9.7.4 Qwest will schedule the appropriate number of employees prior to the cut, normally not to exceed four employees, based upon information provided by SBCT. If the Project Coordinated Installation includes LNP, SBCT will also have appropriate personnel scheduled for the negotiated FDT. If SBCT’s information is modified during the installation, and, as a result, non-scheduled employees are required, SBCT shall be charged a three (3) hour minimum callout charge per each additional non-scheduled employee. If the installation is either cancelled, or supplemented (supp) to change the due date, within twenty four (24) hours of the negotiated FDT, SBCT will be charged a one (1) person three (3) hour minimum charge. For Project Coordinated Installations with LNP, if the Coordinated Installation is cancelled due to a Qwest error or a new due date is requested by Qwest, within twenty-four (24) hours of the negotiated FDT, Qwest may be charged by SBCT a one (1) person three (3) hour minimum charge as set forth in Exhibit A.
Appears in 1 contract
Sources: Telecommunications
Project Coordinated Installation. A project coordinated installation Project Coordinated Installation permits SBCT CLEC to obtain a coordinated installation for Unbundled Loops with or without LNP, where SBCT CLEC orders Unbundled DS1 Capable, Unbundled DS3 Capable or twenty twenty-five (25) or more DS0 Unbundled Loops.
9.2.2.9.7.1 The date and time for the project coordinated installation Project Coordinated Installation requires up-front planning and may need to be negotiated between Qwest and SBCTCLEC. All requests will be processed on a first come, first served basis and are subject to Qwest’s ability to meet a reasonable demand. Considerations such as system down time, switch Switch upgrades, switch Switch maintenance, and the possibility of other CLECs requesting the same FDT in the same switch Switch (switch Switch contention) must be reviewed. In the event that any of these situations would occur, Qwest will negotiate with SBCT CLEC for an agreed upon FDT, prior to issuing the Firm Order Confirmation (FOC). In special cases where SBCT CLEC is ordering Unbundled Loop with LNP, the FDT must be agreed upon, the interval to reach agreement will not exceed two (2) days from receipt of an accurate LSR. In addition, standard intervals will apply.
9.2.2.9.7.2 SBCT CLEC shall request a project coordinated installation Project Coordinated Installation by submitting a Local Service Request (LSR) and designating this order as a project coordinated installation Project Coordinated Installation in the remarks section of the LSR form.
9.2.2.9.7.3 SBCT CLEC will incur additional charges for the project coordinated installation Project Coordinated Installation dependent upon the coordinated time. The rates are based upon whether the request is within Qwest’s normal business hours or Out Of Hours. Qwest normal business hours for Unbundled Loops are 8:00 a.m. to 5:00 p.m., Monday through Friday. The rates for coordinated installations are set forth in Exhibit A. Where LNP is included, see Section 10.2.5.4 for rate elements. Une-unbund loops subloop unbun nid udf Amd TCG-NE 17 Amendment to SEA-970131-1608/dhd/
9.2.2.9.7.4 Qwest will schedule the appropriate number of employees prior to the cut, normally not to exceed four employees, based upon information provided by SBCTCLEC. If the Project Coordinated Installation includes LNP, SBCT CLEC will also have appropriate personnel scheduled for the negotiated FDT. If SBCTCLEC’s information is modified during the installation, and, as a result, non-scheduled employees are required, SBCT CLEC shall be charged a three (3) hour minimum callout charge per each additional non-scheduled employee. If the installation ins tallation is either cancelled, or supplemented (supp) to change the due dateDue Date, within twenty twenty-four (24) hours of the negotiated FDT, SBCT CLEC will be charged a one (1) person three (3) hour minimum charge. For Project Coordinated Installations with LNP, if the Coordinated Installation is cancelled due to a Qwest error or a new due date Due Date is requested by Qwest, within twenty-four (24) hours of the negotiated FDT, Qwest may be charged by SBCT a CLEC one (1) person three (3) hour minimum charge as set forth in Exhibit A.
9.2.2.9.7.5 If CLEC orders Project Coordinated Installation with LNP and in the event the LNP conversion is not successful, CLEC and Qwest agree to isolate and fix the problem in a timeframe acceptable to CLEC or the Customer. If the problem cannot be corrected within an acceptable timeframe to CLEC or the Customer, CLEC may request the restoral of Qwest service for the ported Customer. Such restoration shall begin immediately upon request. If CLEC is in error then a supplemental order shall be provided to Qwest. If Qwest is in error, no supplemental order or additional order will be required of CLEC.
9.2.2.9.7.6 If CLEC orders Project Coordinated Installation with LNP, Qwest shall ensure that any LNP order activity requested in conjunction with a Project Coordinated Installation shall be implemented in a manner that avoids interrupting service to the End User.
9.2.2.10 Multiplexing. Multiplexing is offered in DS3 to DS1 and DS1 to DS0 configurations. Except as specifically set forth in Section 9.2, CLEC may order multiplexing, including conversion from special access or private line circuits, for Unbundled Loops under the rates, terms and conditions for multiplexing of Enhanced Extended Loop (EEL), in the UNE Combinations Section. The requirements with respect to providing a significant amount of local exchange traffic under the UNE Combinations Section shall not apply to conversions to Unbundled Loop.
9.2.2.11 In order to properly maintain and modernize the network, Qwest may make necessary modifications and changes to Unbundled Loops, ancillary and Finished Services in its network on an as needed basis. Such changes may result in minor changes to transmission parameters. Changes that affect network Interoperability require advance notice pursuant to the Notices Section of the Une-unbund loops subloop unbun nid udf Amd TCG-NE 18 Amendment to SEA-970131-1608/dhd/ Agreement.
9.2.2.12 If there is a conflict between an End User (or its respective agent) and CLEC regarding the disconnection or Provisioning of Unbundled Loops, Qwest will advise the End User to contact CLEC, and Qwest will initiate contact with CLEC.
9.2.2.13 Facilities and lines Qwest furnishes on the premises of CLEC's End User up to and including the Loop Demarcation Point are the property of Qwest. Qwest shall have reasonable access to all such facilities for network management purposes. Qwest will coordinate entry dates and times with appropriate CLEC personnel to accommodate testing, inspection repair and maintenance of such facilities and lines. CLEC will not inhibit Qwest’s employees and agents from entering said premises to test, inspect, repair and maintain such facilities and lines in connection with such purposes or, upon termination or cancellation of the Unbundled Loop service, to remove such facilities and lines. Such entry is restricted to testing, inspection, repair and maintenance of Qwest’s property in that facility. Entry for any other purpose is subject to audit provisions in the Audit section of the Agreement.
Appears in 1 contract
Sources: Interconnection Agreement
Project Coordinated Installation. A project coordinated installation Project Coordinated Installation permits SBCT CLEC to obtain a coordinated installation for Unbundled Loops with or without LNP, where SBCT CLEC orders Unbundled DS1 Capable, Unbundled DS3 Capable or twenty twenty-five (25) or more DS0 Unbundled Loops.
9.2.2.9.7.1 The date and time for the project coordinated installation Project Coordinated Installation requires up-front planning and may need to be negotiated between Qwest and SBCTCLEC. All requests will be processed on a first come, first served basis and are subject to Qwest’s ability to meet a reasonable demand. Considerations such as system down time, switch Switch upgrades, switch Switch maintenance, and the possibility of other CLECs requesting the same FDT in the same switch Switch (switch Switch contention) must be reviewed. In the event that any of these situations would occur, Qwest will negotiate with SBCT CLEC for an agreed upon FDT, prior to issuing the Firm Order Confirmation (FOC). In special cases where SBCT CLEC is ordering Unbundled Loop with LNP, the FDT must be agreed upon, the interval to reach agreement will not exceed two (2) days from receipt of an accurate LSR. In addition, standard intervals will apply.
9.2.2.9.7.2 SBCT CLEC shall request a project coordinated installation Project Coordinated Installation by submitting a Local Service Request (LSR) and designating this order as a project coordinated installation Project Coordinated Installation in the remarks section of the LSR form.
9.2.2.9.7.3 SBCT CLEC will incur additional charges for the project coordinated installation Project Coordinated Installation dependent upon the coordinated time. The rates are based upon whether the request is within Qwest’s normal business hours or Out Of Hours. Qwest normal business hours for Unbundled Loops are 8:00 a.m. to 5:00 p.m., Monday through Friday. The rates for coordinated installations are set forth in Exhibit A. Where LNP is included, see Section 10.2.5.4 for rate elements. A.
9.2.2.9.7.4 Qwest will schedule the appropriate number of employees prior to the cut, normally not to exceed four employees, based upon information provided by SBCTCLEC. If the Project Coordinated Installation includes LNP, SBCT CLEC will also have appropriate personnel scheduled for the negotiated FDT. If SBCTCLEC’s information is modified during the installation, and, as a result, non-scheduled employees are required, SBCT CLEC shall be charged a three (3) hour minimum callout charge per each additional non-scheduled employee. If the installation January 17, 2002/lhd/NewEdge/UnbundledLoopUDIT -NE.doc 11 Amendment to CDS-990927-0225 is either cancelled, or supplemented (supp) to change the due dateDue Date, within twenty twenty-four (24) hours of the negotiated FDT, SBCT CLEC will be charged a one (1) person three (3) hour minimum charge. For Project Coordinated Installations with LNP, if the Coordinated Installation is cancelled due to a Qwest error or a new due date Due Date is requested by Qwest, within twenty-four (24) hours of the negotiated FDT, Qwest may be charged by SBCT a CLEC one (1) person three (3) hour minimum charge as set forth in Exhibit A.
9.2.2.9.7.5 If CLEC orders Project Coordinated Installation with LNP and in the event the LNP conversion is not successful, CLEC and Qwest agree to isolate and fix the problem in a timeframe acceptable to CLEC or the Customer. If the problem cannot be corrected within an acceptable timeframe to CLEC or the Customer, CLEC may request the restoral of Qwest service for the ported Customer. Such restoration shall begin immediately upon request. If CLEC is in error then a supplemental order shall be provided to Qwest. If Qwest is in error, no supplemental order or additional order will be required of CLEC.
9.2.2.9.7.6 If CLEC orders Project Coordinated Installation with LNP, Qwest shall ensure that any LNP order activity requested in conjunction with a Project Coordinated Installation shall be implemented in a manner that avoids interrupting service to the End User.
9.2.2.10 Multiplexing. Multiplexing is offered in DS3 to DS1 and DSI to DS0 configurations. Except as specifically set forth in Section 9.2, CLEC may order multiplexing, including conversion from special access or private line circuits, for Unbundled Loops under the rates, terms and conditions for multiplexing of Enhanced Extended Loop (EEL). The requirements with respect to providing a significant amount of local exchange traffic shall not apply to conversions to Unbundled Loop.
9.2.2.11 In order to properly maintain and modernize the network, Qwest may make necessary modifications and changes to Unbundled Loops, ancillary and Finished Services in its network on an as needed basis. Such changes may result in minor changes to transmission parameters. Changes that affect network Interoperability require advance notice pursuant to the Notices Section of the Agreement.
9.2.2.12 If there is a conflict between an End User (or its respective agent) and CLEC regarding the disconnection or Provisioning of Unbundled Loops, Qwest will advise the End User to contact CLEC, and Qwest will initiate contact with CLEC.
(a) Reserved for Future Use.
(b) Reserved for Future Use.
9.2.2.13 Facilities and lines Qwest furnishes on the premises of CLEC's End User up to and including the Loop Demarcation Point are the property of Qwest. Qwest shall have reasonable access to all such facilities for network management purposes. Qwest will coordinate entry dates and times with appropriate CLEC personnel to January 17, 2002/lhd/NewEdge/UnbundledLoopUDIT -NE.doc 12 Amendment to CDS-990927-0225 accommodate testing, inspection repair and maintenance of such facilities and lines. CLEC will not inhibit Qwest’s employees and agents from entering said premises to test, inspect, repair and maintain such facilities and lines in connection with such purposes or, upon termination or cancellation of the Unbundled Loop service, to remove such facilities and lines. Such entry is restricted to testing, inspection, repair and maintenance of Qwest’s property in that facility. Entry for any other purpose is subject to audit provisions in the Audit section of the Agreement.
Appears in 1 contract
Sources: Interconnection Agreement Amendment
Project Coordinated Installation. A project coordinated installation Project Coordinated Installation permits SBCT CLEC to obtain a coordinated installation for Unbundled Loops with or without LNP, where SBCT CLEC orders Unbundled DS1 Capable, Unbundled DS3 Capable or twenty twenty-five (25) or more DS0 Unbundled Loops.
9.2.2.9.7.1 The date and time for the project coordinated installation Project Coordinated Installation requires up-front planning and may need to be negotiated between Qwest and SBCTCLEC. All requests will be processed on a first come, first served basis and are subject to Qwest’s 's ability to meet a reasonable demand. Considerations such as system down time, switch Switch upgrades, switch Switch maintenance, and the possibility of other CLECs requesting the same FDT Frame Due Time (FDT) in the same switch Switch (switch Switch contention) must be reviewed. In the event that any of these situations would occur, Qwest will negotiate with SBCT CLEC for an agreed upon FDT, prior to issuing the Firm Order Confirmation (FOC). In special cases where SBCT CLEC is ordering Unbundled Loop with LNP, the FDT must be agreed upon, the interval to reach agreement will not exceed two (2) days from receipt of an accurate LSR. In addition, standard intervals will apply.
9.2.2.9.7.2 SBCT CLEC shall request a project coordinated installation Project Coordinated Installation by submitting a Local Service Request (LSR) and designating this order as a project coordinated installation Project Coordinated Installation in the remarks section of the LSR form.
9.2.2.9.7.3 SBCT CLEC will incur additional charges for the project coordinated installation Project Coordinated Installation dependent upon the coordinated time. The rates are based upon whether the request is within Qwest’s 's normal business hours or Out Of Hours. Qwest normal business hours for Unbundled Loops are 8:00 a.m. to 5:00 p.m., Monday through Friday. The rates for coordinated installations are set forth in Exhibit A. Where LNP is included, see Section 10.2.5.4 for rate elements. 9.2.2.9.7.4 Qwest will schedule the appropriate number of employees prior to the cut, normally not to exceed four (4) employees, based upon information provided by SBCTCLEC. If the Project Coordinated Installation includes LNP, SBCT CLEC will also have appropriate personnel scheduled for the negotiated FDT. If SBCT’s CLEC's information is modified during the installation, and, as a result, non-scheduled employees are required, SBCT CLEC shall be charged a three (3) hour minimum callout charge per each additional non-scheduled employee. If the installation is either cancelled, or supplemented (supp) to change the due dateDue Date, within twenty twenty-four (24) hours of the negotiated FDT, SBCT CLEC will be charged a one (1) person Person three (3) hour minimum charge. For Project Coordinated Installations with LNP, if the Coordinated Installation is cancelled due to a Qwest error or a new due date Due Date is requested by Qwest, within twenty-four (24) hours of the negotiated FDT, Qwest may be charged by SBCT a CLEC one (1) person Person three (3) hour minimum charge as set forth in Exhibit A.
Appears in 1 contract
Sources: Interconnection Agreement
Project Coordinated Installation. A project coordinated installation Project Coordinated Installation permits SBCT NT&T to obtain a coordinated installation for Unbundled Loops with or without LNP, where SBCT NT&T orders Unbundled DS1 CapableDS1-capable, Unbundled DS3 Capable DS3-capable or twenty twenty-five (25) or more DS0 Unbundled Loops.
9.2.2.9.7.1 2.2.9.7.1 The date and time for the project coordinated installation Project Coordinated Installation requires up-front planning and may need to be negotiated between Qwest Windstream and SBCT. NT&T. All requests will be processed on a first come, first served basis and are subject to QwestWindstream’s ability to meet a reasonable demand. Considerations such as system down time, switch Switch upgrades, switch Switch maintenance, and the possibility of other CLECs requesting the same FDT Frame Due Time (FDT) in the same switch Switch (switch Switch contention) must be reviewed. In the event that any of these situations would occur, Qwest Windstream will negotiate with SBCT NT&T for an agreed upon FDT, prior to issuing the Firm Order Confirmation (FOC). In special cases where SBCT NT&T is ordering Unbundled Loop with LNP, the FDT must be agreed upon, the interval to reach agreement will not exceed two (2) days from receipt of an accurate LSR. In addition, standard intervals will apply.
9.2.2.9.7.2 SBCT 2.2.9.7.2 NT&T shall request a project coordinated installation Project Coordinated Installation by submitting a Local Service Request (LSR) and designating this order as a project coordinated installation Project Coordinated Installation in the remarks section of the LSR form.
9.2.2.9.7.3 SBCT 2.2.9.7.3 NT&T will incur additional charges for the project coordinated installation Project Coordinated Installation dependent upon the coordinated time. The rates are based upon whether the request is within QwestWindstream’s normal business standard installation hours or Out Of Hoursout of hours. Qwest normal business Windstream standard installation hours for Unbundled Loops are 8:00 a.m. to 5:00 p.m.p.m. (local time), Monday through Friday, excluding holidays. The rates for coordinated installations are set forth in Exhibit A. Where LNP is included, see Section 10.2.5.4 Exhibit AP: UNE Price List for rate elements. 9.2.2.9.7.4 Qwest .
2.2.9.7.4 Windstream will schedule the appropriate number of employees prior to the cut, normally not to exceed four (4) employees, based upon information provided by SBCT. NT&T. If the Project Coordinated Installation includes LNP, SBCT NT&T will also have appropriate personnel scheduled for the negotiated FDT. If SBCTNT&T’s information is modified during the installation, and, as a result, non-scheduled employees are required, SBCT NT&T shall be charged a three (3) hour minimum callout charge per each additional non-scheduled employee. If the installation is either cancelled, or supplemented (supp) to change the due dateDue Date, within twenty twenty-four (24) hours of the negotiated FDT, SBCT NT&T will be charged a one (1) person Person three (3) hour minimum charge. For Project Coordinated Installations with LNP, if the Coordinated Installation is cancelled due to a Qwest Windstream error or a new due date Due Date is requested by QwestWindstream, within twenty-four (24) hours of the negotiated FDT, Qwest Windstream may be charged by SBCT a NT&T one (1) person Person three (3) hour minimum charge as set forth charge.
2.2.9.7.5 If NT&T orders Project Coordinated Installation with LNP and in Exhibit A.the event the LNP conversion is not successful, NT&T and Windstream agree to isolate and fix the problem in a timeframe acceptable to NT&T or the End User Customer. If the problem cannot be corrected within an acceptable timeframe to NT&T or the End User Customer, NT&T may request the restoral of Windstream service for the ported End User Customer. Such restoration shall begin immediately upon request. If NT&T is in error then a supplemental order shall be provided to Windstream. If Windstream is in error, no supplemental order or additional order will be required of NT&T.
2.2.9.7.6 If NT&T orders Project Coordinated Installation with LNP, Windstream shall ensure that any LNP order activity requested in conjunction with a Project Coordinated Installation shall be implemented in a manner that avoids interrupting service to the End User Customer.
Appears in 1 contract
Sources: Interconnection Agreement