Common use of Preparation and Approval of Working Drawings Clause in Contracts

Preparation and Approval of Working Drawings. Promptly after the Space Plan is finally approved by Landlord, Tenant shall submit to Landlord drawings prepared by the Designer ("Working Drawings") which shall be consistent with the Approved Space Plan, shall be compatible with the design, construction and equipment of the Building, shall comply with all Laws, shall be capable of logical measurement and construction, shall contain all such information as may be required for the construction of Tenant's Work, and the preparation of the Engineering Drawings, and shall contain all partition locations, plumbing locations, air conditioning system and duct work, special air conditioning requirements, reflected ceiling plans, office equipment locations, and special security systems. Subject to Paragraph 14 below, such Working Drawings must incorporate the items required by Landlord for use in the Building, as set forth in Exhibit "B" attached to the Lease. The Working Drawings may be submitted in one or more stages and at one or more times. Landlord's approval of such Working Drawings shall not be unreasonably withheld or delayed by Landlord so long as the same are consistent with the Approved Space Plan, and shall be deemed given unless Landlord shall disapprove the same by written notice to Tenant given within five (5) business days after Landlord's receipt of a complete set of the Working Drawings. Landlord's disapproval shall be based only upon Design Problems(s) disclosed by such Working Drawings. If Landlord disapproves such Working Drawings in the manner and within the time provided in this Paragraph 3(d), Landlord's notice of disapproval shall designate the specific changes reasonably required to be made to the Working Drawings in order to correct any Design Problem. Tenant shall make the changes necessary in order to correct any such Design Problem and shall return the revised Working Drawings to Landlord, which Landlord shall approve or disapprove within five (5) business days after Landlord receives the revised Working Drawings. This procedure shall be repeated until all of the Working Drawings are finally approved by Landlord and written approval has been delivered to and received by Tenant. The Working Drawings as finally approved pursuant to this Paragraph 3(d) are herein referred to as the "Approved Working Drawings."

Appears in 2 contracts

Samples: Lease (Adforce Inc), Lease (Adforce Inc)

AutoNDA by SimpleDocs

Preparation and Approval of Working Drawings. Promptly after After the Space Plan is finally approved by LandlordLessor, Tenant Lessee shall submit to Landlord Lessor drawings prepared by the Designer ("Working Drawings") which shall be consistent with the Approved Space Plan, shall be compatible with the design, construction and equipment of the Building, shall comply with all Laws, shall be capable of logical measurement and construction, shall contain all such information as may be required for the construction of Tenant's Workthe Tenant Improvements, and the preparation of the Engineering DrawingsDrawings (as defined in Paragraph (e) below), and shall contain all partition locations, plumbing locations, air conditioning system and duct work, special air conditioning requirements, reflected ceiling plans, office equipment locations, and special security systems. Subject to Paragraph 14 below, such Such Working Drawings must incorporate the items required by Landlord Lessor for use in the Building, as set forth in Exhibit "B" attached to the LeaseBuilding Requirements. The Working Drawings may be submitted in one or more stages and at one or more times. Landlord's approval of Lessor shall approve the Working Drawings, or such Working Drawings shall not be unreasonably withheld or delayed by Landlord so long portion as the same are consistent with the Approved Space Planhas from time to time been submitted, and shall be deemed given unless Landlord shall disapprove the same by written notice to Tenant given within five three (53) business days after Landlord's receipt of a complete set of the Working Drawings. Landlord's disapproval shall be based only upon Design Problems(s) disclosed same or designate by notice given within such Working Drawings. If Landlord disapproves such Working Drawings in the manner and within the time provided in this Paragraph 3(d), Landlord's notice of disapproval shall designate period to Lessee the specific changes reasonably required to be made to the Working Drawings in order to correct any Design ProblemProblem and shall return the Working Drawings to Lessee. Tenant Lessee shall make the minimum changes necessary in order to correct any such Design Problem and shall return the revised Working Drawings to LandlordLessor, which Landlord Lessor shall approve or disapprove within five two (52) business days after Landlord Lessor receives the revised Working Drawings. This procedure shall be repeated until all of the Working Drawings are finally approved by Landlord Lessor and written approval has been delivered to and received by Tenant. The Working Drawings as finally approved pursuant to this Paragraph 3(d) are herein referred to as the "Approved Working DrawingsLessee."

Appears in 1 contract

Samples: Work Letter Agreement (Nexsan Corp)

Preparation and Approval of Working Drawings. Promptly after After the Space -------------------------------------------- Plan is finally approved by LandlordLessor, Tenant Lessee shall submit to Landlord Lessor drawings prepared by the Designer ("Working Drawings") which shall be consistent with the Approved Space Plan, shall be compatible with the design, construction and equipment of the Building, shall comply with all Applicable Laws, shall be capable of logical measurement and construction, shall contain all such information as may be required for the construction of Tenant's Workthe Tenant Improvements, and the preparation of the Engineering DrawingsDrawings (as defined in Paragraph (e) below), and shall contain all partition locations, plumbing locations, air conditioning system and duct work, special air conditioning requirements, reflected ceiling plans, office equipment locations, and special security systems. Subject to Paragraph 14 below, such Working Drawings must incorporate the items required by Landlord for use in the Building, as set forth in Exhibit "B" attached to the Lease. The Working Drawings may be submitted in one or more stages and at one or more times. Landlordtimes and the time periods for Lessor's approval shall apply with respect to each such portion submitted. Lessor and Lessee understand and agree that neither the Working Drawings, Engineering Drawings, or Final Plans will include any changes required of Lessor to the Building Structure or Building Systems to ensure that the Building Structure and Building Systems comply with Applicable Laws. Lessor shall approve the Working Drawings, or such Working Drawings shall not be unreasonably withheld or delayed by Landlord so long portion as the same are consistent with the Approved Space Planhas from time to time been submitted, and shall be deemed given unless Landlord shall disapprove the same by written notice to Tenant given within five (5) business days after Landlord's receipt of a complete set of the Working Drawings. Landlord's disapproval shall be based only upon Design Problems(s) disclosed same, or designate by notice given within such Working Drawings. If Landlord disapproves such Working Drawings in the manner and within the time provided in this Paragraph 3(d), Landlord's notice of disapproval shall designate period to Lessee the specific changes reasonably required to be made to the Working Drawings in order to correct any Design Problemproblems identified by Lessor and shall return the Working Drawings to Lessee. Tenant Lessee shall make the changes necessary in order to correct any such Design Problem problems and shall return the revised Working Drawings to LandlordLessor, which Landlord Lessor shall approve or disapprove within five three (53) business days after Landlord Lessor receives the revised Working Drawings. This procedure shall be repeated until all of the Working Drawings are finally approved by Landlord Lessor and written approval has been delivered to and received by Tenant. The Working Drawings as finally approved pursuant to this Paragraph 3(d) are herein referred to as the "Approved Working DrawingsLessee."

Appears in 1 contract

Samples: Lease (Citadel Holding Corp)

Preparation and Approval of Working Drawings. Promptly after After the Space Plan is finally approved by Landlord, Tenant shall submit to Landlord drawings prepared by the Designer Architect ("Working Drawings") which shall be consistent with the Approved Space Plan, shall be compatible with the design, construction and equipment of the Building, shall include Building standard items, mutually agreeable upgrades, comply with all Lawsapplicable laws, shall be capable of logical measurement and construction, shall contain all such information as may be required for the construction of Tenant's Workthe Tenant Improvements, and the preparation of the Engineering DrawingsDrawings (as defined in Subsection (e) below), and shall contain all demising walls, corridors, entrances, exists, interior partition locations, plumbing locations, air conditioning system and duct work, special air conditioning requirements, reflected ceiling plans, office equipment locations, and special security air handling systems. Subject to Paragraph 14 below, such Working Drawings must incorporate the items required by Landlord for use in the Building, as set forth in Exhibit "B" attached to the Leaseetc. The Working Drawings may shall be submitted in one or more stages and package at one or more timestime, and the time periods for Landlord’s approval shall apply with respect to each resubmittal until finally approved by Landlord. Landlord's approval of such Landlord shall approve the Working Drawings shall not be unreasonably withheld or delayed by Landlord so long as the same are consistent with the Approved Space Plan, and shall be deemed given unless Landlord shall disapprove the same by written notice to Tenant given within five seven (57) business days after Landlord's receipt of a complete set of the Working Drawings. Landlord's disapproval shall be based only upon Design Problems(s) disclosed same or designate by notice given within such Working Drawings. If Landlord disapproves such Working Drawings in the manner and within the time provided in this Paragraph 3(d), Landlord's notice of disapproval shall designate period to Tenant the specific changes reasonably required to be made to the Working Drawings in order to correct any Design Problemproblem and shall return the Working Drawings to Tenant. Tenant shall make the necessary changes necessary in order to correct any such Design Problem problem and shall return the revised Working Drawings to Landlord, which Landlord shall approve or disapprove within five three (53) business days after Landlord receives the revised Working Drawings. This procedure shall be repeated until all of the Working Drawings are finally approved by Landlord and written approval has been delivered to and received by TenantXxxxxx. The Working Drawings Xxxxxxxx’s approval of any drawings shall not in any way relieve the Architect, Engineers or General Contractor of their obligations, responsibilities, or liabilities associated with the design and/or construction of this project. Xxxxxxxx’s approval is limited in scope as finally approved pursuant to set forth in the terms and conditions of this Paragraph 3(d) are herein referred to as the "Approved Working DrawingsAgreement."

Appears in 1 contract

Samples: CardioVascular BioTherapeutics, Inc.

AutoNDA by SimpleDocs

Preparation and Approval of Working Drawings. Promptly after After the Space Plan is finally approved by Landlord, Tenant shall submit to Landlord drawings prepared by the Designer Architect ("Working Drawings") which shall be consistent with the Approved Space Planinclude Building standard items, shall be compatible with the designmutually agreeable upgrades or modifications, construction and equipment of the Building, shall comply with all Lawsapplicable laws, shall be capable of logical measurement and construction, shall contain all such information as may be required for the construction of Tenant's Workthe Tenant Improvements, and the preparation of the Engineering DrawingsDrawings (as defined in Subsection (e) below), and shall contain all partition locations, plumbing locations, air conditioning system and duct work, special air conditioning requirements, reflected ceiling plans, office equipment locations, locations and special security systems. Subject to Paragraph 14 below, such Working Drawings must incorporate the items required by Landlord for use in the Building, as set forth in Exhibit "B" attached to the Lease. The Working Drawings may shall be submitted in one or more stages and package at one or more timestime, and the time periods for Landlord’s approval shall apply with respect to each resubmittal until finally approved by Landlord. Landlord's approval of such Landlord shall approve the Working Drawings shall not be unreasonably withheld or delayed by Landlord so long as the same are consistent with the Approved Space Plan, and shall be deemed given unless Landlord shall disapprove the same by written notice to Tenant given within five three (53) business days after Landlord's receipt of a complete set of the Working Drawings. Landlord's disapproval shall be based only upon Design Problems(s) disclosed same or designate by notice given within such Working Drawings. If Landlord disapproves such Working Drawings in the manner and within the time provided in this Paragraph 3(d), Landlord's notice of disapproval shall designate period to Tenant the specific changes reasonably required to be made to the Working Drawings in order to correct any Design Problemproblem and shall return the Working Drawings to Tenant. Tenant shall make the necessary changes necessary in order to correct any such Design Problem problem reasonably identified by Landlord and shall return the revised Working Drawings to Landlord, which Landlord shall approve or disapprove within five three (53) business days after Landlord Xxxxxxxx receives the revised Working Drawings. This procedure shall be repeated until all of the Working Drawings are finally approved by Landlord and written approval has been delivered to and received by TenantXxxxxx. The Landlord shall notify Tenant at the time it approves the Working Drawings of improvements which Landlord requires to be removed upon the expiration of the Term. Xxxxxxxx’s approval of any drawings shall not in any way relieve the Architect, Engineers or General Contractor of their obligations, responsibilities, or liabilities associated with the design and/or construction of this project. Xxxxxxxx’s approval is limited in scope as finally approved pursuant to set forth in the terms and conditions of this Paragraph 3(d) are herein referred to as the "Approved Working DrawingsAgreement."

Appears in 1 contract

Samples: Phenomix CORP

Preparation and Approval of Working Drawings. Promptly after After the Space Plan is finally approved by Landlord, Tenant shall submit to Landlord drawings prepared by the Designer Architect ("Working Drawings") which shall be consistent with the Approved Space Plan, shall be compatible with the design, construction and equipment of the Building, shall comply with all Lawsapplicable statutes, shall laws, codes, ordinances, rules and regulations, be capable of logical measurement and construction, shall contain all such information as may be required for the construction of Tenant's Workthe Tenant Improvements, and the preparation of the Engineering DrawingsDrawings (as defined in Subsection c. below), and shall contain all partition locations, plumbing locations, air conditioning system and duct work, special air conditioning requirements, reflected ceiling plans, office equipment locations, and special security systems. Subject to Paragraph 14 below, such Such Working Drawings must incorporate the such items required as have been specified by Landlord as required for use in the Building, as set forth in Exhibit "B" Schedule 1 attached to the Leasethis Agreement. The Working Drawings may be submitted in one or more stages and at one or more times. Landlord's approval of such Working Drawings shall not be unreasonably withheld or delayed by Landlord so long as the same are consistent with the Approved Space Plan, and the time periods for Landlord’s approval shall be deemed given unless apply with respect to each such portion submitted. Landlord shall disapprove the same by written notice to Tenant given within five (5) business days after Landlord's receipt of a complete set of approve the Working Drawings. Landlord's disapproval shall be based only upon Design Problems(s, or such portion as has from time to time been submitted, within ten (10) disclosed Business Days after receipt of same or designate by notice given within such Working Drawings. If Landlord disapproves such Working Drawings in the manner and within the time provided in this Paragraph 3(d), Landlord's notice of disapproval shall designate period to Tenant the specific changes reasonably required to be made to the Working Drawings in order to correct any Design Problemproblems and shall return the Working Drawings to Tenant. Tenant shall make the minimum changes necessary in order to correct any such Design Problem problems and shall return the revised Working Drawings to Landlord, which Landlord shall approve or disapprove within five (5) business days Business Days after Landlord receives the revised Working Drawings. This procedure shall be repeated until all of the Working Drawings are finally approved by Landlord and written approval has been delivered to and received by Tenant. The Working Drawings as finally approved pursuant to this Paragraph 3(d) are herein referred to as the "Approved Working Drawings."

Appears in 1 contract

Samples: Lease (Cara Therapeutics, Inc.)

Time is Money Join Law Insider Premium to draft better contracts faster.