Preliminary Design Guidelines for the Site Sample Clauses

Preliminary Design Guidelines for the Site. The SOM team will develop and present design guidelines for the refined scheme to inform appropriate scale, setbacks, materiality, and other elements that will inform the overall look and feel that proposed developments will adhere to for the site.
AutoNDA by SimpleDocs

Related to Preliminary Design Guidelines for the Site

  • Preliminary Design § 4.3.1 Upon the Owner’s issuance of a written consent to proceed under Section 4.2.3, the Design-Builder shall prepare and submit a Preliminary Design to the Owner. The Preliminary Design shall include a report identifying any deviations from the Owner’s Criteria, and shall include the following:

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Design Guidelines The Owner’s “Design Guidelines” are as published on the Owner’s website (xxxx://xxxxx.xxxxx.xxx/for-vendors/design-guidelines/). In addition to providing a guide to be used in the preparation of design documents for the Owner’s construction projects, the Design Guidelines also contain regulatory code compliance and other Owner requirements. The “Effective Date” (as noted in Section 2.7 of the Design Guidelines), determining which edition will be used for a given project, is set at the beginning of Design Development and will govern the preparation of construction documents for the project unless noted otherwise. Compliance with the Design Guidelines does not relieve the Design Professional from any of its responsibility.

  • B1 The Specification B1.1 In consideration of the Contractor supplying the Services during the Contract Period in accordance with the Authority’s requirements as set out in the Specification and the provisions of the Contract the Contractor shall be paid the Contract Price.

  • HIV/AIDS Model Workplace Guidelines Grantee will:

  • Drug-Free Workplace Certification As required by Executive Order No. 90-5 dated April 12, 1990, issued by the Governor of Indiana, the Contractor hereby covenants and agrees to make a good faith effort to provide and maintain a drug-free workplace. The Contractor will give written notice to the State within ten (10) days after receiving actual notice that the Contractor, or an employee of the Contractor in the State of Indiana, has been convicted of a criminal drug violation occurring in the workplace. False certification or violation of this certification may result in sanctions including, but not limited to, suspension of contract payments, termination of this Contract and/or debarment of contracting opportunities with the State for up to three (3) years. In addition to the provisions of the above paragraph, if the total amount set forth in this Contract is in excess of $25,000.00, the Contractor certifies and agrees that it will provide a drug-free workplace by:

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • Project Manual A bound manual prepared by the Design Professional. It includes the Invitation to Bid, Instructions to Bidders, the Bid Form, the Specifications, the General Conditions and Supplementary General Conditions.

  • Specification and Service Levels The Specification sets out the Services that the Contractor has undertaken to provide. The Specification includes Service Levels setting out particular levels of service that the Contractor has undertaken to meet.

Time is Money Join Law Insider Premium to draft better contracts faster.