Port Enumeration Sample Clauses

Port Enumeration. Port and protocol scans must be conducted with reference to the network design, proving that management protocols are only accessible via management interfaces, and control plane protocols are only accessible via control plane interfaces. All interfaces where the network element can be identified (where it would be possible to respond to a PING request or appear in a route trace) must be tested. If the interface switches/routes traffic transparently or is not IP based then that interface need not be scanned. Scans should be performed with all Access Control Lists (ACLs) first disabled, so as to give a clearer view of which ports/services are active, and then enabled, to demonstrate what is normally visible. Tests should detail: • Which addresses were scanned (management, interface). • All open, open|filtered and closed|filtered ports • Detail why ports which are open are required. Port scan may be performed using latest version of nmap or any other open source software tool. For the purpose of illustration command used in the available version of nmap at present (July 2010) are given in annexure II.
AutoNDA by SimpleDocs

Related to Port Enumeration

  • Exclusion de garanties A. Si vous êtes un client qui est un consommateur (quelqu’un qui utilise le Logiciel Apple en dehors de son commerce, son entreprise ou sa profession), il se peut que vous bénéficiez, dans votre pays de résidence, de droits selon lesquels les limitations suivantes ne s’appliqueraient pas à vous.Dans les pays où ces limitations sont interdites, elles ne s’appliquent pas. Pour en savoir plus sur vos droits, prenez contact avec un organisme local de conseil aux consommateurs.

  • Allocation and use of scarce resources Any procedures for the allocation and use of scarce resources, including frequencies, numbers and rights of way, will be carried out in an objective, timely, transparent and non-discriminatory manner. The current state of allocated frequency bands will be made publicly available, but detailed identification of frequencies allocated for specific government uses is not required.

  • Meter and Cabling Be obliged to draw electricity lines/wires, television cables, broadband data cables and telephone cables to the said Apartment only through the ducts and pipes provided therefor, ensuring that no inconvenience is caused to the Promoter or to other apartment owners. The main electricity meter shall be installed only at the space designated for common meters. The Allottee shall under no circumstances be entitled to affix, draw or string wires, cables, dish antennae or pipes from, to or through any part or portion of and outside walls of the building in which the Apartment is located save in the manner indicated by the Promoter/Association (upon formation).

  • Mechanical Rights The Licensor hereby grants to Licensee a non-exclusive License to use Master Recording in the reproduction, duplication, manufacture, and distribution of phonograph records, cassette tapes, compact disks, internet downloads, other and miscellaneous audio and digital recordings, and any lifts and versions thereof (collectively ,”Recordings”) worldwide for up to the pressing or selling a total of 10000 copies of such Recordings or any combination of such Recordings. Additionally, Licensor shall be permitted to distribute unlimited internet downloads for non-profit and non-commercial use.

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

  • Exclusions and Limitations for Third Party Software SUBJECT TO THE EXCLUSION OF DAMAGES STATED IN SECTION 9.2 AND WITH RESPECT TO THIRD PARTY SOFTWARE, UNDER NO CIRCUMSTANCES AND REGARDLESS OF THE NATURE OF ANY CLAIM SHALL SAP OR ITS LICENSORS’ BE LIABLE FOR AN AMOUNT IN EXCESS OF THE PAID LICENSE FEES FOR THE THIRD PARTY SOFTWARE DIRECTLY CAUSING THE DAMAGES.

  • Cost Responsibility for Network Upgrades 9 5.1 Applicability 9 5.2 Network Upgrades 9

  • Collocation Transfer of Responsibility Without Working Circuits The Collocation is not serving any End User Customers and does not have active service terminations (e.g., Interconnection trunks or UNE Loops) or 2) Collocation Transfer of Responsibility With Working Circuits – The Collocation has active service terminations, such as Interconnection trunks or is serving End User Customers.

  • Description of the service 9.1.1 Internet banking service implies an ability for the client to manage and receive remotely the following services from the bank by means of using the special Internet-site of the bank xxxxx://xxx.xxxxxxxxxxxxxxx.xx:

  • DESCRIPTION OF THE WORKS Employer’s objectives The scope of the request includes the recommended monthly preventative, quarterly and annual maintenance that needs to be conducted to ensure all areas of the airports are lit and compliant. It will include all the other adhoc request (labor rates) where required upon approval by the maintenance manager. The compliance will be based on the following: • Maintenance as per OEM • Organizational guidelines and codes of practice • OHS act 93 – Occupational Health and Safety • ISO 9001 – Quality management • ISO 14001 – Environmental Management • SANS 10142 – The wiring code • ICAO Annex 14 chapter 5. • ACSA Maintenance Procedure D060 024M This scope entails the maintenance and repair of LV systems and all lighting at Costal airports. In brief, maintenance involves servicing, repairs, and testing of lights and LV systems. This involves carrying out maintenance on electrical equipment such as LV DBs, electrical plant, wiring enclosures and luminaires and associated control systems, portable appliances and other specific electrical equipment, in order to minimize downtime, and ensure that the equipment performs at optimal levels and functions to specification at the specified areas. Servicing - performing routine preventive maintenance as prescribed by the original equipment manufacturer (OEM), ACSA’s planned maintenance routines, and applicable legal and design standards. Repairs – responding to breakdowns, callouts and restoring the equipment to safe working conditions on an as and when basis. Advisory – telephonically guiding airport electricians under emergency situations to ensure systems are safely shutdown or returned to service within stringent times. System Performance Test – Testing equipment performance against the OEM, ACSA, and statutory requirements for compliance and return to service purposes. Extent of the works The Contractor will be fully responsible for meeting all requirements in this document regarding the Works. For each piece of equipment, all work will be carried out to standards as required by the Original Equipment Manufacturer (OEM) as well as any applicable governing law and/or regulations. Where OEM standards differ from those required by this document the more stringent requirement shall apply. The Contractor will be fully responsible for obtaining (and keeping up to date with) said requirements. The proposed minimum scheduled maintenance activities can be found in annex H.

Time is Money Join Law Insider Premium to draft better contracts faster.