Pelvis Sample Clauses

Pelvis. The pelvis is constructed from an iliac-sacrum bone part covered with a plastic flesh outer contour simulation. In the bone part removable hip joints are inserted. An accelerometer array can be mounted in the pelvis. Special hip joints are available that allow to position the dummy in a standing position. The Q0 pelvis has a simplified layout with an integral foam part for the complete torso.
Pelvis. 2.9.1. The pelvis is shown as part No. 8 in Figure 1 of this annex. 2.9.2. The pelvis consists of a sacrum block, two iliac wings, two hip joints assemblies and a flesh simulating foam covering. 2.9.3. The sacrum (part No. 8a) consists of a mass tuned metal block and a metal plate mounted on top of this block. In the aft side of the block is a cavity to facilitate the application of instrumentation. 2.9.4. The iliac wings (part No. 8b) are made of polyurethane (PU)-resin. 2.9.5. The hip joints assemblies (part No. 8c) are made of steel parts. They consist of an upper femur bracket and a ball joint connected to an axle passing through the dummy’s H-point. 2.9.6. The flesh system (part No. 8d) is made of a polyvinlychloride (PVC) skin filled with polyurethane (PU)
Pelvis. All pelvic bones excluding the sacrum (the sacrum is the five fused bones at the base of the vertebral body).
Pelvis. 5.12.1. The dummy is seated on a flat, horizontal, rigid surface with no back support. The thorax is positioned vertically while the arms and legs are positioned horizontally. 5.12.2. The impactor is a pendulum with a mass of 23.4 ± 0.2 kg and diameter of 152.4 ± 0.25 mm with an edge radius of 12.7 mm.8 The impactor is suspended from rigid hinges by eight wires with the centre line of the impactor at least 3.5 m below the rigid hinges (see Figure 4). 5.12.3. The impactor is equipped with an accelerometer sensitive in the direction of impact and located on the impactor axis. 5.12.4. The impactor should freely swing onto the pelvis of the dummy with an impact velocity of 4.3 ± 0.1 m/s. 5.12.5. The impact direction is perpendicular to the anterior-posterior axis of the dummy and the axis of the impactor is aligned with the centre of the H-point back plate. 5.12.6. The peak force of the impactor, obtained from the impactor acceleration filtered using ISO 6487:2000 CFC 180 and multiplied by the impactor mass, should be between and including 4.4 and 5.4 kN, and occur between and including 10.3 and 15.5 m/s. 5.12.7. The pubic symphisis force, filtered using ISO 6487:2000 CFC 600, should be between and including 1.04 and 1.64 kN and occur between and including 9.9 and 15.9 m/s. 5.13. Legs 5.13.1. No dynamic certification procedure is defined for the legs 8 Pendulum corresponding with American Code of Federal Regulation 49 CFR Chapter V Part 572.36(a) (10-1-00 Edition) (See also Figure 4). Figure 3 Overview of the side impact dummy certification test set-up
Pelvis. 5.12.1. The dummy is seated on a flat, horizontal, rigid surface with no back support. The thorax is positioned vertically while the arms and legs are positioned horizontally. 5.12.2. The impactor is a pendulum with a mass of 23.4 ± 0.2 kg and diameter of 152.4 ± 0.25 mm with an edge radius of 12.7 mm 8/. The impactor is suspended from rigid hinges by eight wires with the centre line of the impactor at least 3.5 m below the rigid hinges (see Figure 4). 5.12.3. The impactor is equipped with an accelerometer sensitive in the direction of impact and located on the impactor axis. 5.12.4. The impactor should freely swing onto the pelvis of the dummy with an impact velocity of 4.3 ± 0.1 m/s. 5.12.5. The impact direction is perpendicular to the anterior-posterior axis of the dummy and the axis of the impactor is aligned with the centre of the H-point back plate. 5.12.6. The peak force of the impactor, obtained from the impactor acceleration filtered using ISO 6487:2000 CFC 180 and multiplied by the impactor mass, should be between and including 4.4 and 5.4 kN, and occur between and including 10.3 and 15.5 ms. 5.12.7. The pubic symphysis force, filtered using ISO 6487:2000 CFC 600, should be between and including 1.04 and 1.64 kN and occur between and including 9.9 and 15.9 ms.
Pelvis. 2.9.1. The pelvis is shown as part No. 8 in Figure 1 of this annex. 2.9.2. The pelvis consists of a sacrum block, two iliac wings, two hip joints assemblies and a flesh simulating foam covering. 2.9.3. The sacrum (part No. 8a) consists of a mass tuned metal block and a metal plate mounted on top of this block. In the aft side of the block is a cavity to facilitate the application of instrumentation. 2.9.4. The iliac wings (part No. 8b) are made of polyurethane (PU)-resin. 2.9.5. The hip joints assemblies (part No. 8c) are made of steel parts. They consist of an upper femur bracket and a ball joint connected to an axle passing through the dummy's H-point. The upper femur bracket abduction and adduction capability is buffered by rubber stops at the ends of the range of motion. 2.9.6. The flesh system (part No. 8d) is made of a polyvinlychloride (PVC) skin filled with polyurethane (PU)
Pelvis. 2.5.1. The pelvis is made of glass reinforced polyester also coated with polyurethane. 2.5.2. The shape of the upper side of the pelvis, which is important for determining sensitivity to abdominal loading, is simulated as far as possible from the shape of a child's pelvis. 2.5.3. The hip joints are situated just below the pelvis.
Pelvis. 2.9.1. The pelvis is shown as part No. 9 in figure 1 of this annex. 2.9.2. The pelvis consists of a sacrum block, two iliac wings, two hip joints and a foam covering. 2.9.3. The sacrum (part No. 9a) consists of a lead-filled aluminium block and an aluminium plate mounted on top of this block. 2.9.4. The iliac wings (part No. 9b) are made of polyurethane. 2.9.5. The hip joints (part No. 9c) are made of steel. They consist of an upper femur part and a ball joint connected to an axle passing through the dummy’s H-point. 2.9.6. The flesh system (part No. 9d) is made of a PVC skin filled with polyurethane foam. At the H-point location the skin is replaced by a large open-cell polyurethane foam cylinder (part No. 9e), attached to a steel plate fixed on the iliac wing by an axle going through the ball joint. 2.9.7. The iliac wings are linked together at the pubic symphysis by a force transducer (part No. 9f) or a "dummy" transducer.
Pelvis. 5.12.1. The dummy is seated on a flat, horizontal, rigid surface with no back support. The thorax is positioned vertically while the arms and legs are positioned horizontally. 5.12.2. The impactor is a pendulum with a mass of 23.4 ± 0.2 kg and diameter of 152.4 ± 0.25 mm with an edge radius of 12.7

Related to Pelvis

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • meminta nasihat daripada Pihak ▇▇▇▇▇▇ dalam semua perkara berkenaan dengan jualan lelongan, termasuk Syarat-syarat Jualan (iii) membuat carian Hakmilik ▇▇▇▇▇ ▇▇▇▇▇▇ rasmi di Pejabat Tanah ▇▇▇/atau ▇▇▇▇-▇▇▇▇ Pihak-pihak Berkuasa yang berkenaan ▇▇▇ (iv) membuat pertanyaan dengan Pihak Berkuasa yang berkenaan samada jualan ini terbuka kepada semua bangsa atau kaum Bumiputra Warganegara Malaysia sahaja atau melayu sahaja ▇▇▇ juga mengenai persetujuan untuk jualan ini sebelum jualan lelong.Penawar yang berjaya ("Pembeli") dikehendaki dengan segera memohon ▇▇▇ mendapatkan kebenaran pindahmilik (jika ada) daripada Pihak Pemaju ▇▇▇/atau Pihak Tuanpunya ▇▇▇/atau Pihak Berkuasa Negeri atau badan-badan berkenaan (v) memeriksa ▇▇▇ memastikan samada jualan ini dikenakan cukai. HAKMILIK : Hakmilik strata bagi hartanah ini masih belum dikeluarkan HAKMILIK INDUK / NO. LOT : Pajakan Negeri 35263, Lot No.29096 MUKIM/DAERAH/NEGERI : Setapak / Kuala Lumpur / Wilayah Persekutuan Kuala Lumpur PEGANGAN : Pajakan selama 82-tahun berakhir pada 08/08/2085 KELUASAN LANTAI : 81.104 meter persegi ( 873 kaki persegi ) PEMAJU/PENJUAL : Mega Planner Jaya Sdn Bhd (326287-W)(Dalam Likuidasi) TUANPUNYA : Datuk Bandar Kuala Lumpur PEMBELI : ▇▇▇▇▇▇▇▇ Bin ▇▇▇▇▇ @ ▇▇▇▇ BEBANAN : Diserahhak kepada RHB Bank Berhad [196501000373 (6171-M)] Hartanah tersebut terletak di tingkat 9 pada bangunan apartment 14-tingkat terletak di Melati Impian Apartment, Setapak Fasa 1, Kuala Lumpur. Hartanah tersebut adalah sebuah unit apartment 3 ▇▇▇▇▇ dikenali sebaga ▇▇▇▇▇ Pemaju No. 9, Tingkat No.9, Pembangunan dikenali sebagai Melati Impian Apartment Setapak Fasa 1, Kuala Lumpur ▇▇▇ mempunyai alamat surat-▇▇▇▇▇▇▇▇ ▇▇ ▇▇▇▇ ▇▇. ▇-▇, ▇▇▇▇▇▇ Impian Apartment, ▇▇▇▇▇ ▇/▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇. Harta ini dijual “keadaan seperti mana sediada” dengan harga rizab sebanyak RM 300,000.00 (RINGGIT MALAYSIA: TIGA RATUS RIBU SAHAJA) ▇▇▇ tertakluk kepada syarat-syarat Jualan ▇▇▇ melalui penyerahan hakkan dari Pemegang Serahak, tertakluk kepada kelulusan di perolehi oleh pihak Pembeli daripada pihak berkuasa, jika ada, termasuk semua terma, syarat ▇▇▇ perjanjian yang dikenakan ▇▇▇ mungkin dikenakan oleh Pihak Berkuasa yang berkenaan. Pembeli bertanggungjawab sepenuhnya untuk memperolehi ▇▇▇ mematuhi syarat-syarat berkenaan daripada Pihak Berkuasa yang berkenaan, jika ada ▇▇▇ semua ▇▇▇ ▇▇▇ perbelanjaan ditanggung ▇▇▇ dibayar oleh ▇▇▇▇▇ ▇▇▇▇▇▇▇.Pembeli atas talian (online) juga tertakluk kepada terma-terma ▇▇▇ syarat-syarat terkandung dalam ▇▇▇.▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Pembeli yang berminat adalah dikehendaki mendeposit kepada Pelelong 10% daripada harga rizab dalam bentuk Bank Draf atau Cashier’s Order di atas nama RHB Bank Berhad sebelum lelongan awam ▇▇▇ ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇ hendaklah dibayar dalam tempoh sembilan puluh (90) hari dari tarikh lelongan kepada RHB Bank Berhad melalui Bank Draf / ▇▇▇▇▇▇. Butir-butir pembayaran melalui ▇▇▇▇▇▇, ▇▇▇▇ berhubung dengan Tetuan Zahrin Emrad & Sujaihah. Untuk maklumat lanjut, ▇▇▇▇ berhubung dengan TETUAN ZAHRIN EMRAD & SUJIAHAH, yang beralamat di Suite 10.3, 10th Floor, ▇▇▇ ▇▇▇▇ Building, ▇▇.▇▇, ▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇. Tel: ▇▇-▇▇▇▇ ▇▇▇▇ / Fax: ▇▇-▇▇▇▇ ▇▇▇▇. [ Ruj: ZES/ZHR/RHB-FC/16250-17/0614-pae ], peguamcara bagi pihak pemegang ▇▇▇▇▇ ▇▇▇ atau pelelong yang tersebut dibawah.

  • Vlastnictví Zdravotnické zařízení si ponechá a bude uchovávat Zdravotní záznamy. Zdravotnické zařízení a Zkoušející převedou na Zadavatele veškerá svá práva, nároky a tituly, včetně práv duševního vlastnictví k Důvěrným informacím (ve smyslu níže uvedeném) a k jakýmkoli jiným Studijním datům a údajům.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Games The Private Party shall not be entitled to introduce any arcade type amusement or gaming machines into the Restaurant Facility without the prior written approval of SANParks.