Overhead Contact System (OCS) Design Sample Clauses

POPULAR SAMPLE Copied 4 times
Overhead Contact System (OCS) Design. Development of design for each type of OCS needed for each section of the route, including bridges and underpasses, open route, and S&MF.  OCS sectionalizing and tension length drawings.  Typical substation to OCS feeder connection details.  Typical OCS pole, foundation, and guy anchor details.  Typical parallel feeder design and duct bank details for single wire areas.  Structural details.  Transition to/from off-wire operation.  OCS poles – it is envisioned that tubular steel poles with architectural coatings and shapes as required for visually sensitive areas will be used. Wide flange poles will be used in the S&MF areas. Streetlight poles will be combined with OCS poles only as agreed to and budgeted for in the preliminary engineering phase of work.  Warning signs.  Disconnect switch and feeder tap arrangements.  Typical side and center OCS poles configuration drawings.  Cantilever arm and headspan support details.  Insulated overlaps at traction power substation feeder location details.  Foundations – bolted base drilled pier concrete OCS foundations in the open route and anchor bolt assemblies in bridge superstructures.

Related to Overhead Contact System (OCS) Design

  • Support Services Rehabilitation, counselling and EAP’s. Support is strictly non- punitive, and can be accessed at anytime (self-identification of the need for help is strongly encouraged).

  • Hosting Services NCR Voyix shall furnish facilities, equipment, computer programs and services, as specified from time to time by NCR Voyix, that NCR Voyix deems necessary for operation and maintenance of the System (collectively, the “Hosting Services”).

  • The Web Services E-Verify Employer Agent agrees to, consistent with applicable laws, regulations, and policies, commit sufficient personnel and resources to meet the requirements of this MOU.

  • Internet Connection Certain Solutions may require an active and stable connection to the Internet in order to function. It is therefore your responsibility to ensure that you have at all times an active and stable Internet connection.

  • Transport Services Upon the conclusion of such multilateral negotiations, the Parties shall conduct a review for the purpose of discussing appropriate amendments to this Agreement so as to incorporate the results of such multilateral negotiations.