OTHER TECHNICAL REQUIREMENT Sample Clauses

OTHER TECHNICAL REQUIREMENT. A) EARTHING : Earthing shall be provided, by having continuous length of 4 mm dia G.I.wire embedded in concrete during manufacture and the ends of G.I. wire left projected from the transverse face of the poles to a length of 100 mm at 250 mm from top and 150 mm below ground level (Planting depth to be 1.5 M) The tolerance of 25 mm shall be allowed in position of earth wire. The earth wire shall not be allowed to entangle with pre stressing wires.
AutoNDA by SimpleDocs

Related to OTHER TECHNICAL REQUIREMENT

  • Minimum Technical Requirements Participant will be responsible for installing (unless Vendor provides), maintaining and hosting the Vendor’s integration package (either “Full Express” or “Express Lite” software) on Participant’s own computer to enable connectivity to the Network for the Patient Look-Up and Delivery Services including installing and maintaining updates and upgrades. Participant’s machine must meet the following requirements for hosting the Vendor’s integration package: • A virtual machine environment running VMware Player (free open source product) that can run the Express VMware disk image (.ova format) • For Vendor’s “Express Lite” software (for Participants that already have an enterprise master patient index (MPI) and a clinical data repository), the minimum system resources that should be allocated to the virtual machine are: o 4 CPU cores o 8GB of RAM o 100GB of available disk space • For Vendor’s “Full Express” software (for Participants that do not already have an MPI or a clinical data repository), the minimum system resources that should be allocated to the virtual machine are: o 8 CPU cores o 16GB of RAM o 500GB of available disk space • Network access between the Vendor’s Express software (either “Express Lite” or “Full Express”) and the Participant’s health information exchange system for the exchange of clinical system data for the Patient Look-Up and Delivery Services. The Participant shall maintain availability of its data for query on a 24 hour/7 day basis with the exception of routine and unexpected maintenance, at greater than 99% uptime monthly. The Participant shall make its data available for a minimum look-back period of 18 months up to and including current available data and update the available data daily.

  • Technical Requirements 2.7.4.1 The NID shall provide an accessible point of interconnection and shall maintain a connection to ground.

  • Technical Requirements for SCPs/Databases 10.5.3.1 BellSouth shall provide physical access to SCPs through the SS7 network and protocols with TCAP as the application layer protocol.

  • Closet/Urinal Requirements 6.1 Employees Closets Urinals 1-5 1 Nil 6-10 1 1 11-20 2 2 21-35 3 4 36-50 4 6 51-75 5 7 76-100 6 8

  • Physical Requirements A. The gradation when tested by means of laboratory sieves conform to the following requirements for particle size without any variation: Sieve Size % Passing by Weight 5/8” 100.0% 7/16” 95.0% - 100.0% No. 4 60.0% No. 8 35.0%

  • General Requirement Any notice, election, demand, request, consent, approval, or other communication required or permitted to be given under this Contract shall be in writing signed by an officer or duly authorized representative of the party making same and shall be delivered personally or shall be sent by certified or statutory mail, postage prepaid, return receipt requested, shall be effective as of the date on which it is received or would have been received but for the refusal of the addressee to accept delivery, and shall be addressed as shown in the Contract. The persons and addresses to which notices should be given may be changed by notice given in accordance with this Article.

  • Applicable Technical Standards The Applicable Technical Requirements and Standards that apply to the Customer Facility and the Interconnection Facilities are identified in Schedule D to this ISA.

  • Functional Requirements Applications must implement controls that protect against known vulnerabilities and threats, including Open Web Application Security Project (OWASP) Top 10 Risks and denial of service (DDOS) attacks.

  • Technical Regulations 1. The rights and obligations of the Parties in respect of technical regulations, standards and conformity assessment shall be governed by the WTO Agreement on Technical Barriers to Trade.

  • General Requirements The Contractor hereby agrees:

Time is Money Join Law Insider Premium to draft better contracts faster.