Operation Modes and Event Sample Clauses

Operation Modes and Event. B Co-refinement The Event-B development method offers a gradual, refinement-based, model detailing. To refine model M one constructs a new model Mj such that for any valid state of Mj there is a corresponding state in M. In Event-B, this is accomplished by discharging a number of refinement proof obligations formulated for each model event. As refinement in Event-B is monotonic, a model refinement could be constructed by changing only a part of a model and demonstrating the relevant conditions for just that part. Event-B refinement is a combination of data, superposition, behavioural and atomicity refine- ment. Atomicity refinement permits introduction of a finer level of atomic steps needed to realise a given functionality. Event-B behavioural refinement allows a modeller to replace an event guard and event before-after predicate. The rules linking abstract and concrete guards and before-after predicates are as follows. The guard of the concrete version of an event must be stronger than its abstract counterpart: P(s, c) ∧ I(s, c, v) ∧ J(s, c, v, u) ∧ H(s, c, u) ⇒ G(s, c, v) (15) A new before-after predicate must be a stronger version of its abstraction: P(s, c) ∧ I(s, c, v) ∧ J(s, c, v, u) ∧ H(s, c, u)∧ S(s, c, u, uj) ⇒ vj · (R(s, c, v, vj) ∧ J(s, c, xx, uj))
AutoNDA by SimpleDocs

Related to Operation Modes and Event

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Emergency Mode Operation Plan Contractor must establish a documented plan to enable continuation of critical business processes and protection of the security of electronic DHCS PHI or PI in the event of an emergency. Emergency means any circumstance or situation that causes normal computer operations to become unavailable for use in performing the work required under this Agreement for more than 24 hours.

  • DISASTER RECOVERY AND BUSINESS CONTINUITY The Parties shall comply with the provisions of Schedule 5 (Disaster Recovery and Business Continuity).

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • CONTRACTING BODY SATISFACTION MONITORING 18.1 The Authority may from time to time undertake (or procure the undertaking of) a Contracting Body satisfaction survey ("Contracting Body Satisfaction Survey") the purpose of which shall include:

  • Standard Operating Procedures Over approximately the past eight years, the Parties have been supplying select Products to one another for use in the operation of their respective businesses within the United States of America, Canada and Mexico. The Parties developed and been following certain standard operating procedures in connecting with, among other topics, forecasting, production planning, ordering, delivering and resolving claims on the Products supplied to one another (the “Current SOPs”). The Parties will be updating their respective business systems over the next six months, and the updates to these business systems will require the Parties to modify the Current SOPs. Once the Parties have completed the updates to the business systems and agreed on the necessary modifications to the Current SOPs, the Parties will sign a written amendment to this Agreement appending the updated standard operating procedures (the “Updated SOPs”). Until the Parties have signed a written amendment appending the Updated SOPs, the parties will continue to follow the Current SOPs. The Parties will comply with the applicable SOPs in connection with the purchase and sale of products identified in a Purchase Schedule. The Parties may add terms and conditions to, and amend the terms and conditions of, the SOP in a Purchase Schedule, but any additional and amended terms and conditions in a Purchase Schedule supplementing and modifying the SOP will only apply the specific products identified in that Purchase Schedule for its duration.

  • Verizon Operations Support Systems Verizon systems for pre- ordering, ordering, provisioning, maintenance and repair, and billing.

  • PERFORMANCE MANAGEMENT SYSTEM 5.1 The Employee agrees to participate in the performance management system that the Employer adopts or introduces for the Employer, management and municipal staff of the Employer.

  • ACCESS TO OPERATIONS SUPPORT SYSTEMS 2.1 BellSouth shall provide Max-Tel access to operations support systems (“OSS”) functions for pre-ordering, ordering and provisioning, maintenance and repair, and billing. BellSouth shall provide access to the OSS through manual and/or electronic interfaces as described in this Attachment. It is the sole responsibility of Max-Tel to obtain the technical capability to access and utilize BellSouth’s OSS interfaces. Specifications for Max-Tel ’s access and use of BellSouth’s electronic Version R4Q01: 12/01/01 interfaces are set forth at xxx.xxxxxxxxxxxxxxx.xxxxxxxxx.xxx and are incorporated herein by reference.

Time is Money Join Law Insider Premium to draft better contracts faster.