O verview of Design Consultant's Scope Sample Clauses

O verview of Design Consultant's Scope. The Design Consultant's fee includes the complete design of a new facility including all architectural, sitework, extensions of utilities, off-site roadway improvements, traffic impact study, civil, structural, mechanical, plumbing, electrical, landscape, fire suppression, food service, technology infrastructure (including all required cabling, but excluding servers, smartboards, laptops, phones, cameras and other devices), and any other work required for a complete set of design documents. The Design Consultant’s fee shall also include structured cabling and raceways for phone system, paging system, data systems, intrusion detection system, video surveillance system, audio systems and video distribution system.
AutoNDA by SimpleDocs

Related to O verview of Design Consultant's Scope

  • Release of Design Plan The Engineer (1) will not release any roadway design plan created or collected under this contract except to its subproviders as necessary to complete the contract; (2) shall include a provision in all subcontracts which acknowledges the State’s ownership of the design plan and prohibits its use for any use other than the project identified in this contract; and (3) is responsible for any improper use of the design plan by its employees, officers, or subproviders, including costs, damages, or other liability resulting from improper use. Neither the Engineer nor any subprovider may charge a fee for the portion of the design plan created by the State.

  • Coordination of Design and Construction Contract Documents 5.5.1 Review model(s), Drawings, Specifications and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • If Designated If the HSP is Designated it will:

  • 253 Design Change (a) “Design Change” is a change in work and/or materials shown in the Schedule of Items and described in Plans or specifications that has been mutually agreed to in writing or ordered by Contracting Officer. Changes of a minor nature (such as adjustment in horizontal and vertical alignment, that do not exceed specified tolerance, necessary to maintain or balance earthwork quantities substantially as designed) and variation in quantities, as described in B5.251, shall not be considered Design Changes.

  • HOOSIER HEALTHWISE SCOPE OF WORK  Requirements for Reinsurance Companies  The Contractor shall submit documentation that the reinsurer follows the National Association of Insurance Commissioners' (NAIC) Reinsurance Accounting Standards.  The Contractor shall be required to obtain reinsurance from insurance organizations that have Standard and Poor's claims- paying ability ratings of "AA" or higher and a Xxxxx’x bond rating of “A1” or higher, unless otherwise approved by OMPP.  Subcontractors  Subcontractors’ reinsurance coverage requirements must be clearly defined in the reinsurance agreement.  Subcontractors should be encouraged to obtain their own stop-loss coverage with the above-mentioned terms.  If subcontractors do not obtain reinsurance on their own, the Contractor is required to forward appropriate recoveries from stop- loss coverage to applicable subcontractors.

  • Design Professional to Design Work The Design Professional Contract requires the Design Professional to design and to prepare the Contract Documents, a copy of which shall be furnished to the Contractor upon request. The Design Professional Contract requires the Design Professional to designate a readily accessible representative (either on Site or by computer, phone or fax or otherwise) who shall have authority promptly to render decisions and to furnish information required of the Design Professional.

  • Termination of Designation of Convalescent Care Beds (a) Notwithstanding section 6.3, the provisions in this section 6.5 apply to the termination of a designation of convalescent care Beds.

  • Note to Design Professional Please insert the number of additional Days allowed and the new Material Completion and Occupancy Date, or, if no additional time is allowed, insert “0” for the Days and “No Change” for the date.

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.