MINERAL RIGHTS NOT LEASED TO HOMEOWNER Sample Clauses

MINERAL RIGHTS NOT LEASED TO HOMEOWNER. CLT does not lease to Homeowner the right to remove from the Leased Land any minerals lying beneath the Leased Land’s surface. Ownership of such minerals remains with the CLT, but the CLT shall not remove any such minerals from the Leased Land without the Homeowner’s written permission.
AutoNDA by SimpleDocs
MINERAL RIGHTS NOT LEASED TO HOMEOWNER. MHT does not lease to Homeowner the right to remove from the Leased Land any minerals lying beneath the Leased Land’s surface. Ownership of such minerals remains with the MHT, but the MHT shall not remove any such minerals from the Leased Land without the Homeowner’s written permission.

Related to MINERAL RIGHTS NOT LEASED TO HOMEOWNER

  • Mineral Rights It is agreed and understood that all rights under the soil, including but not limited to water, gas, oil, and mineral rights shall be transferred by the Seller to the Buyer at Closing.

  • Right of Way and Real Property The party named in Article 1, Responsible Parties, under AGREEMENT is responsible for the provision and acquisition of any needed right of way or real property. The Local Government shall be responsible for the following:

  • Rights of Way Each of the MarkWest Entities has such consents, easements, rights-of-way, permits or licenses (collectively, “rights-of-way”) from each person as are necessary to conduct its business in the manner described, and subject to the limitations contained, in the Pricing Disclosure Package and the Prospectus, except for (i) qualifications, reservations and encumbrances that would not have a Material Adverse Effect and (ii) such rights-of-way that, if not obtained, would not have, individually or in the aggregate, a Material Adverse Effect; other than as set forth, and subject to the limitations contained, in the Pricing Disclosure Package and the Prospectus, each of the MarkWest Entities has fulfilled and performed all its material obligations with respect to such rights-of-way and no event has occurred that allows, or after notice or lapse of time would allow, revocation or termination thereof or would result in any impairment of the rights of the holder of any such rights-of-way, except for such revocations, terminations and impairments that would not have a Material Adverse Effect; and, except as described in the Pricing Disclosure Package and the Prospectus, none of such rights-of-way contains any restriction that is materially burdensome to the MarkWest Entities, taken as a whole.

  • Water Rights Water rights and/or water shares used in connection with the Property;

  • Real Property; Personal Property (a) On the Disaffiliation Date, Local Church will have full title and ownership of the Real Property and Personal Property. The parties shall ensure all necessary transfers or other transactions relating to the above properties are completed on or prior to the Disaffiliation Date. Any costs resulting from such transfers or other transactions shall be borne by Local Church. Annual Conference shall fully cooperate with Local Church, as needed and applicable, to ensure that such transfers and other transactions convey all of Annual Conference’s interest – both for itself and on behalf of The United Methodist Church – in the Real Property and Personal Property, both tangible and intangible, of Local Church.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Student Data Property of LEA All Student Data transmitted to the Provider pursuant to the Service Agreement is and will continue to be the property of and under the control of the LEA. The Provider further acknowledges and agrees that all copies of such Student Data transmitted to the Provider, including any modifications or additions or any portion thereof from any source, are subject to the provisions of this DPA in the same manner as the original Student Data. The Parties agree that as between them, all rights, including all intellectual property rights in and to Student Data contemplated per the Service Agreement, shall remain the exclusive property of the LEA. For the purposes of FERPA, the Provider shall be considered a School Official, under the control and direction of the LEA as it pertains to the use of Student Data, notwithstanding the above.

  • Personal Property In addition to the real property described in Section II, the Seller shall include the following personal property: _ The real property in Section II and any personal property in Section III shall be collectively known as the “Property”.

  • Area of Concern Cracks in walkways and/or patios within property boundaries and/or driveway. Standard: Cracks that do not exceed an average of ½ inch in width and vertical displacement that does not exceed an average of ½ inch are to be expected. Developer or Initial Purchaser must immediately seal all cracks appearing with a waterproof substance.

  • Obligation to Notify Owner of Existing Hazardous Materials The Contractor shall immediately notify the Owner and the Design Professional, both orally and in writing, of the presence and location of any physical evidence of, or information regarding the presence of Hazardous Materials at the Site of which it becomes aware. If the Contractor encounters Hazardous Materials on the Site the Contractor shall (i) immediately stop performance of Work or that portion of the Work affected by or affecting such Hazardous Materials; (ii) secure the contaminated area against intrusion; (iii) not disturb or remove the Hazardous Materials; (iv) not proceed, or allow any subcontractor or supplier to proceed, with any Work or other activities in the area affected by such Hazardous Materials until such materials have been properly remediated and until directed in writing to do so by the Owner; and, (v) take any other steps necessary to protect life and health and the surrounding environment. The Contractor shall be entitled to adjustment of the Contract Time and the Contract Sum pursuant to Section 5, Part 2 of these General Conditions in order to compensate for the impact of any required demolition, re-work, shutdown, delay, protection of work, disruption, and start-up resulting from the encountering of such Hazardous Materials on the Site for which the Contractor is not responsible.

Time is Money Join Law Insider Premium to draft better contracts faster.