Preliminary Cost Estimate Sample Clauses

Preliminary Cost Estimate. Consulting Engineer/Architect shall furnish City an estimate of probable Construction Cost based on the preliminary design. Consulting Engineer/Architect's estimate of probable Construction Cost is to be made on the basis of Consulting Engineer/Architect's experience and qualifications and represent Consulting Engineer/Architect's best judgment as an experienced and qualified design professional, familiar with the construction industry.
AutoNDA by SimpleDocs
Preliminary Cost Estimate. The Engineer shall prepare a preliminary cost estimate for the project, including the costs of construction, required ROW and associated improvements, and eligible utility adjustments. Current State unit bid prices will be used in preparation of the estimate.
Preliminary Cost Estimate. NRCS has completed a technical evaluation of the proposed easement or 30-year contract enrollment area and developed cost estimates for all enrollment agreement related costs including the preliminary restoration plan as certified below. All costs below are estimates unless they are $0, in which case the funds have been or by the end of the current fiscal year will be procured through a federal contract or Agreement, or funds are not required. No practices will be authorized and no payments will be made from this supplement. Annual review of the obligation amount will be conducted via the Review of Open Obligations Tool (ROOT). For States Serviced by the Easement Acquisition Branch (EAB), the EAB will complete section (a) below and the State must complete section (b) below. Section (c) below will auto-populate based on the information entered in sections (a) and (b) below.
Preliminary Cost Estimate. The Engineer shall develop a preliminary cost estimate using the Average Low Bid Unit Price. The Engineer shall estimate the total project cost including preliminary engineering, final engineering, right-of-way (ROW) acquisition, environmental compliance and mitigation, construction, utility relocation, and construction engineering inspection (CEI).
Preliminary Cost Estimate. The Engineer shall prepare a preliminary cost estimate for the project, including the costs of construction, required ROW and associated improvements, and eligible utility adjustments. Current State unit bid prices will be used in preparation of the estimate. DocuSign Envelope ID: 9EFC6FE2-229E-4628-90C6-20E86398200F
Preliminary Cost Estimate. The Engineer shall prepare a preliminary cost estimate for each concept schematic as well as the final project schematic, including the costs of construction and eligible utility adjustments. Current State unit bid prices will be used in preparation of the estimate.
Preliminary Cost Estimate. (a) The Generator has provided to the Counterparty, prior to the date hereof, a preliminary Basis of Estimate Report for the First Unit. Such preliminary Basis of Estimate Report consists of a detailed breakdown of the estimated costs for the Refurbishment Work and the applicable One-Time Costs for the First Unit and describes the basis for the costs for each work breakdown item and the risk associated with that cost. The preliminary Basis of Estimate Report also includes a detailed work plan to develop the Fully-Scoped Refurbishment Cost and the Fully-Scoped Refurbishment Duration by the scheduled Refurbishment Lock-in Date of the First Unit. The Counterparty acknowledges receipt of such preliminary Basis of Estimate Report in form and scope acceptable to it. On or prior to December 31 of each year after the Effective Time and prior to the Refurbishment Lock-in Date of the First Unit, the Generator will update such preliminary Basis of Estimate Report and work plan for such Unit and will deliver to the Counterparty an updated Base Estimate and Contingency determined in accordance with Section 2.6 for the Refurbishment Work for such Unit.
AutoNDA by SimpleDocs
Preliminary Cost Estimate. The term "Preliminary Cost Estimate" ------------------------- shall mean an estimate of Improvement Costs for the Interior Improvements based upon initial or revised preliminary plans and specifications for the Interior Improvements.
Preliminary Cost Estimate. Consultant will furnish City an estimate of probable Construction Cost based on the preliminary design and at subsequent design review submittals as specifically requested by City. Consultant's estimate of probable Construction Cost is to be made based on Consultant's experience and qualifications and represent Consultant's best judgment as an experienced and qualified design professional, familiar with the construction industry.
Preliminary Cost Estimate. The Engineer shall prepare and update the preliminary cost estimate for the 3 concept schematics as well as the final project schematic, including the costs of construction and eligible DocuSign Envelope ID: 1DB60CEF-DAD9-4F47-8AE2-182BB19769B8 utility adjustments. Current State unit bid prices will be used in preparation of the estimate. The cost estimate shall be in two parts with part one corresponding to PS&E Package one from US 90 to Sta. 353+00 and part two PS&E Package two from Sta. 353+00 to Interstate 35. The scheduled letting date for PS&E Package One from US 90 to Sta. 35.+ 00 is June 30, 2019.