IDP Submittals Sample Clauses

IDP Submittals. (a) The Phase Developer will have full responsibility for the implementation of each IDP Submittal included within the Phase Developer's Proposal, including the satisfaction of all conditions (if any) attached to MDOT's acceptance of an IDP Submittal and obtaining the approval or consent of any relevant Governmental Entity or third party (including any necessary modifications to the MDOT-Provided Approvals).
AutoNDA by SimpleDocs

Related to IDP Submittals

  • Submittals Submittals required by the Contract Documents shall be prepared specifically for the Work by the Contractor to illustrate some portion of the Work. Submittals are not Contract Documents.

  • Required Submittals Complete shop drawings and manufacturer’s catalog data shall be submitted to the State and approved by the State prior to start of any construction work. Power and lighting panel configuration shall be complete with schedule of branch panels, separate disconnects, and circuit breakers, based on calculated and estimated motor, resistive and lighting loads. All circuits shall be labeled at the panel and at the outlet/power pole for future reference. Location of all electrical receptacles and telephone outlets (including power drops for the systems furnishings) shall be designated on a block floor plan showing the systems furnishings layout provided by the State. Said block floor plan shall be furnished by the State to the Owner/Lessor no later than 4 weeks after approved construction plans are received by the State.

  • Contractor’s Submittals The Contract shall submit with reasonable promptness consistent with the Work Project Schedule and in orderly sequence all Shop Drawings, Samples, or other information required by the Contract Documents, or subsequently required by Change Order. Prior to submitting, the Contractor shall review each submittal for compliance with the Contract Documents and certify its approval by an approval stamp affixed to each copy. Submittal data presented without the Contractor’s certification will be returned without review or comment, and any delay resulting from such certification is the Contractor's responsibility.

  • Review of Submittals A/E and ODR review is only for conformance with the design concept and the information provided in the Contract Documents. Responses to submittals will be in writing. The approval of a separate item does not indicate approval of an assembly in which the item functions. The approval of a submittal does not relieve the Contractor of responsibility for any deviation from the requirements of the Contract unless the Contractor informs the A/E and ODR of such deviation in a clear, conspicuous, and written manner on the submittal transmittal and at the time of submission, and obtains the A/E’s and Owner’s written specific approval of the particular deviation.

  • Invoice Submittal DEO shall reimburse Subrecipient in accordance with Section 6, above. In accordance with the Funding Requirements of s. 215.971(1), F.S. and Section 21 of this Agreement, Subrecipient and its subcontractors may only expend funding under this Agreement for allowable costs resulting from obligations incurred during this Agreement. To be eligible for reimbursement, costs must be in compliance with laws, rules and regulations applicable to expenditures of State funds, including, but not limited to, the Reference Guide for State Expenditures (xxxxx://xxx.xxxxxxxxxxxx.xxx/Division/AA/Manuals/documents/ReferenceGuideforStateExpenditures.pdf).

  • ELECTRONIC SUBMITTALS 3.1. Submittal Exchange® (xxx.xxxxxxxxxxxxxxxxx.xxx) shall be used to provide an on-line database and repository, which shall be used to transmit and track project-related documents. The intent for using this service is to expedite the construction process by reducing paperwork, improving information flow, and decreasing submittal review turnaround time.

  • Progress Update Information included with the annual Data Access Request (DAR) renewal or Closeout summarizing the analysis of controlled-access datasets obtained through the DAR and any publications and presentations derived from the work.

  • Change Order Formats Formats for Lump Sum Change Orders and for Change Orders based upon either a force account or upon unit pricing with an indeterminate number of units are in Section 7, Forms.

  • Submittal Review 7.10.1 The A/E shall review Submittals such as Shop Drawings, Product Data, and Samples for conformity with design intent and conformity with the Contract Documents within 14 days of receiving Submittals or in accordance with the approved submittal schedule, or other period as mutually agreed by the A/E and Contractor.

  • Submittal Reports, plans, surveys, field notes, original drawings, computer tapes, graphic files, tracings, calculations, analyses, reports, specifications, data, sketches and/or schematics prepared by A/E and supporting documents (collectively referred to hereinabove and hereinafter as the "A/E Work Product(s)"), shall be submitted by A/E on or before the dates specified for completion, as set out in the Production Schedule set forth in Exhibit C.

Time is Money Join Law Insider Premium to draft better contracts faster.