GREASE AND GRIT TRAPS REQUIRED Sample Clauses

GREASE AND GRIT TRAPS REQUIRED. (a) Commercial Grease Generators. All commercial grease generators, and others in violation of Sub-Section 2 hereof, shall discharge all wastes from sinks, dishwashers and drains into an approved and properly maintained and functioning grease trap before entering the sanitary sewer drain. Such grease traps shall be inspected, cleaned, and repaired regularly, as needed, by the Generator at his/her expense.
AutoNDA by SimpleDocs

Related to GREASE AND GRIT TRAPS REQUIRED

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Porcupine Site Highway 11

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Quality Assurance Requirements There are no special Quality Assurance requirements under this Agreement.

  • GARBAGE DISPOSAL, RECYCLING, AND BIODEGRADABLE MATERIALS A. Concessionaire shall be responsible for maintaining the cleanliness of the Concession Premises. Concessionaire shall ensure placement of all garbage and trash generated by the Concession Operation in designated containers and that said containers are emptied daily, or as more frequently required by Department, at a location within the Area designated by Department. Disposal costs from this latter location shall be borne by Department. Concessionaire shall provide such additional trash containers as may be required to keep the immediate Concession Premises clean at all times. The type of trash containers provided by Concessionaire shall be approved by Department prior to use.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where EveryCall has requested an Unbundled Loop and BellSouth uses Integrated Digital Loop Carrier (IDLC) systems to provide the local service to the end user and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to EveryCall. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for EveryCall (e.g. hairpinning):

  • Food Service Waste Reduction Requirements Contractor shall comply with the Food Service Waste Reduction Ordinance, as set forth in San Francisco Environment Code Chapter 16, including but not limited to the remedies for noncompliance provided therein.

  • Loop Testing/Trouble Reporting 2.1.6.1 TeleConex will be responsible for testing and isolating troubles on the Loops. TeleConex must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, TeleConex will be required to provide the results of the TeleConex test which indicate a problem on the BellSouth provided Loop.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

Time is Money Join Law Insider Premium to draft better contracts faster.