Evaporation Retarder Sample Clauses

Evaporation Retarder. Apply evaporation retarder to unformed concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.
AutoNDA by SimpleDocs

Related to Evaporation Retarder

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • Electrical Safety Only UL approved items are permitted in Housing & Residence Life. Extension and multi-use cords must be heavy duty, single plug, and be UL approved. Altering or adapting electrical outlets and equipment and overloading circuits jeopardize safety and thus are not permitted.

  • Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.

  • Health plan specification The Employer will require health plans participating in the Group Insurance Program to develop and implement health promotion and health education programs for State employees and their dependents.

  • Physical Access Control Unauthorized persons are prevented from gaining physical access to premises, buildings or rooms where data processing systems that process and/or use Personal Data are located.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Joint Occupational Health and Safety Committee The Employer and the Union recognize the role of the joint Occupational Health and Safety Committee in promoting a safe and healthful workplace. The parties agree that a Joint Occupational Health and Safety Committee shall be established for each Employer covered by this Collective Agreement. The Committee shall govern itself in accordance with the provisions of the Industrial Health and Safety Regulations made pursuant to the Workers’ Compensation Act. The Committee shall be as between the Employer and the Union, with equal representation, and with each party appointing its own representatives. Representatives of the Union shall be chosen by the Union membership or appointed by the Union. All minutes of the meetings of the Joint Occupational Health & Safety Committee will be recorded in a mutually agreeable format and will be sent to the Union. The Union further agrees to actively pursue with the other Health Care Unions a Joint Union Committee for the purposes of this Article. The Employer agrees to provide or cause to be provided to Employer members of the Joint Occupational Health and Safety Committee adequate training and orientation to the duties and responsibilities of committee members to allow the incumbents to fulfil those duties competently. The Union agrees to provide or cause to be provided to Union members of the Joint Occupational Health and Safety Committee adequate training and orientation to the duties and responsibilities of committee members to allow the incumbents to fulfil those duties competently. Such training and orientation shall take place within six (6) months of taking office.

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

Time is Money Join Law Insider Premium to draft better contracts faster.