Emergency Water Supply Charge Sample Clauses

Emergency Water Supply Charge. Potable Water supplied under Emergency Water Conditions by either party per this Agreement and distributed through the Point(s) of Delivery shall be charged at the then current approved bulk rate of COUNTY.
AutoNDA by SimpleDocs

Related to Emergency Water Supply Charge

  • Water Supply The system may or may not meet state and local requirements. It is the right and responsibility of Buyer to determine the compliance of the system with state and local requirements. [For additional information on this subject, request the “Water Supply and Waste Disposal Notification” form.]

  • Emergency Operator Access Registry Operator shall provide bulk access to the zone files for the TLD to the Emergency Operators designated by ICANN on a continuous basis in the manner ICANN may reasonably specify from time to time.

  • Monitoring Services IDT staff shall, using methods that include face-to-face and other contacts with the member, monitor the services a member receives. This monitoring shall ensure that:

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Disaster Services In the event of a local, state, or federal emergency, including natural, man- made, criminal, terrorist, and/or bioterrorism events, declared as a state disaster by the Governor, or a federal disaster by the appropriate federal official, Grantee may be called upon to assist the System Agency in providing the following services:

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

  • Outpatient emergency and urgicenter services within the service area The emergency room copay applies to all outpatient emergency visits that do not result in hospital admission within twenty-four (24) hours. The urgicenter copay is the same as the primary care clinic office visit copay.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Emergency Services The parties recognize that in the event of a strike or lockout, situations may arise of an emergency nature. To this end, the Employer and the Union will agree to provide services of an emergency nature.

Time is Money Join Law Insider Premium to draft better contracts faster.