Drainage Improvement Facility Sizing and Alignment Sample Clauses

Drainage Improvement Facility Sizing and Alignment. The proposed increased local pipe sizing will be based on the results of XPSWMM or WSPG for the new revised flowrates. Preliminary horizontal and vertical alignments will be developed for the recommended facilities. The lengths and elevation data will be used for detailed hydraulic analysis and cost estimating purposes. Recommended drainage improvements to remove hydraulic deficiencies of the municipal storm drain systems will be analyzed in FlowMaster, or in some cases WSPG, developed in the previous tasks to verify operation. The precise sizing of the modifications to the existing storm drain sizes will be adjusted using the water surface profile model to optimize the performance of the system. For the major systems, the proposed increased sizing will be based on the XPSWMM results. Final drainage solution alternatives will be prepared for City review and acceptance. These alternatives will be identified based on priority. Areas of high susceptibility to flooding and/or priority water quality treatment will be ranked highest. Three levels of storm drain modification priority will be created in conjunction with City. A color coded map will be provided to the City identifying the priority ranked systems to be replaced.
AutoNDA by SimpleDocs

Related to Drainage Improvement Facility Sizing and Alignment

  • Building Access i. Access to Secured buildings: Contractor will work through the GIT Contract administrator for access to the building.

  • School Improvement The conditions which follow shall govern employee participation in any and all plans, programs, or projects included in the terms, site-based decision making, school improvement, effective schools as provided in Act 197, P.A. 1987 (Section 15.1919 (919b) MSA) or other similar plans:

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

Time is Money Join Law Insider Premium to draft better contracts faster.