Dolphin Monitoring Equipment Sample Clauses

Dolphin Monitoring Equipment. Equipment Model Commercially licensed motor vessel 15m in length with a 4.5m viewing platform Global Positioning System (GPS) x2 Integrated into T7000 Garmin GPS Map 76C Computers (T7000 Tablet, Intel Atom) Windows 7/MSO 13 Logger Camera Nikon D7100 300m 2.8D fixed focus Nikon D90 80-400mm zoom lens Laser Rangefinder Range Finder Bushnell 1000m Marine Binocular x3 Nexus 7 x 50 marine binocular with compass and reticules Fujinon 7 x 50 marine binocular with compass and reticules
AutoNDA by SimpleDocs

Related to Dolphin Monitoring Equipment

  • Monitoring Equipment 2.2.1 24-hour TSP air quality monitoring was performed using High Volume Sampler (HVS) located at each designated monitoring station. The HVS meets all the requirements of the Project Specific EM&A Manual. Portable direct reading dust meters were used to carry out the 1-hour TSP monitoring. Brand and model of the equipment is given in Table 2.1.

  • Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.

  • MEASURING EQUIPMENT 1. Seller will maintain and operate, at its own, expense and at the point of delivery of gas hereunder, a meter or meters and other necessary equipment by which the volume of gas delivered hereunder shall be measured. Such meters and equipment shall remain the property of the Seller.

  • System Monitoring to ensure safe and continuous operation, the Customer must monitor key services and resource use as recommended by Deswik, and provide Deswik with details of monitoring and any relevant alerts as needed. Services to be monitors include, without limitation, disk space, CPU usage, memory usage, database connectivity, and network utilization.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

  • Supply Chain Monitoring A copy of the supply chain monitoring process, which should include details of the process for monitoring the financial viability of the supply chain (including timing), together with any known risks to supply chain stability and material changes to the supply chain. This should include extracts from Board level meetings, risk registers etc where any of the above items have been discussed. Annex 1 1 Information from Contractors who are not required to submit form AR01 to Companies House

  • Contract Monitoring The criminal background checks required by this rule shall be national in scope, and must be conducted at least once every three (3) years. Contractor shall make the criminal background checks required by Paragraph IV.G.1 available for inspection and copying by DRS personnel upon request of DRS.

  • Call monitoring We may occasionally monitor and record calls made to or by us relating to customer services and telemarketing calls made by us, for the purpose of training and improving customer care services, including complaint handling. We and/or our suppliers may also record 999 and 112 calls.

  • Program Monitoring The Contractor will make all records and documents required under this Agreement as outlined here, in OEC Policies and NHECC Policies available to the SRO or its designee, the SR Fiscal Officer or their designee and the OEC. Scheduled monitoring visits will take place twice a year. The SRO and OEC reserve the right to make unannounced visits.

  • Service Monitoring Customer gives express consent for Vodafone to monitor Customer’s use of the Service (and disclose and otherwise use the information obtained) only to: (a) the extent allowed by Applicable Law; (b) comply with Applicable Law; (c) protect the Network from misuse; (d) protect the integrity of the public internet and/or Vodafone’s systems and Networks; (e) the extent necessary to determine if Customer has breached any conditions or restrictions on use of the Service; (f) provide the Service; and/or (g) take other actions agreed or requested by Customer.

Time is Money Join Law Insider Premium to draft better contracts faster.