Common use of Developer Operating Requirements Clause in Contracts

Developer Operating Requirements. Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Developer must comply with Connecting Transmission Owner’s operating instructions and requirements which are set forth below. • This document describes the operating requirements between Con Edison’s System Operation Department and Xxxxxx Xxxxx Generation Plant (the “Plant”) connected to the Con Edison electrical system at Goethals 345KV Substation as illustrated on Goethals 60 cycles operating diagram 70. • Operating one-line diagram 9C shows the operating jurisdictional boundaries of Con Edison’s System Operation Department. • The Con Edison District Operator (“District Operator”) or Con Edison System Operator (“System Operator”) shall direct all operations on equipment within Con Edison’s jurisdictional boundaries in accordance with System Operation’s Department Procedures/Con Edison specifications and the Con Edison General Instructions Governing Work on System Electrical Equipment (the “Rulebook”). • Con Edison’s District Operator and System Operator each shall have a dedicated direct line (two direct lines in total from the ECC) to the Control Room Operator and if such direct line is not available for any reason, the Control Room Operator can be reached via outside telephone line at 000-000-0000 or 000-000-0000 or such other telephone line as the Plant shall provide. The Plant shall notify the District Operator of any change in their control room outside telephone number. • Additional System Operation procedures and policies govern the operating relationship between Con Edison and Xxxxxx Xxxxx includes, but is not limited to Rulebook, and System Operation Department’s Procedures. • In order to not exceed the nominal designed capacity of the Goethals Substation equipment in the case of a trip out of Con Edison feeders exiting Goethals Substation, the Plant shall reduce its MW output upon notification from the Con Edison District Operator or Con Edison System Operator. • Xxxxxx Xxxxx will operate the Plant and provide advance notification to the Con Edison Chief District Operator in the event that the Plant changes ownership or will be operated by a different entity. • The Plant shall respond to emergencies as directed by the Con Edison System Operator, and/or Con Edison District Operator. • The Plant shall provide to the Con Edison Chief System Operator, the generator’s MVAR capability curves and the Generator Step Up transformer’s No Load Tap Changer ranges and settings after each update. • The Plant shall maintain an updated list of personnel authorized by Xxxxxx Xxxxx to perform switching within the Plant. Updated lists shall be transmitted to the Con Edison Chief District Operator after each update, and as requested by Con Edison System Operations, and will be utilized when issuing operating orders The Plant shall ensure that a qualified control room operator will always be available at the Plant control room. • The Con Edison District Operator, when directed by the Con Edison System Operator, shall issue all orders to an authorized Plant Operator who will prepare an operating order and dispatch qualified operators to carry out the order in accordance with Section 5 of the Rulebook. • All changes in the operating status of equipment within the Con Edison jurisdictional boundaries shall be under the sole authority of the Con Edison System Operator, as stated in Section 2 of the Rulebook and in System Operation’s Department

Appears in 2 contracts

Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement

AutoNDA by SimpleDocs

Developer Operating Requirements. Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Developer must comply with Connecting Transmission Owner’s operating instructions and requirements which are set forth below. • This document describes the operating requirements between Con Edison’s System Operation Department and Xxxxxx Xxxxx Generation Plant (the “Plant”) connected to the Con Edison electrical system at Goethals 345KV Substation as illustrated on Goethals 60 cycles operating diagram 70. • Operating one-line diagram 9C shows the operating jurisdictional boundaries of Con Edison’s System Operation Department. • The Con Edison District Operator (“District Operator”) or Con Edison System Operator (“System Operator”) shall direct all operations on equipment within Con Edison’s jurisdictional boundaries in accordance with System Operation’s Department Procedures/Con Edison specifications and the Con Edison General Instructions Governing Work on System Electrical Equipment (the “Rulebook”). • Con EdisonXxxxxx’s District Operator and System Operator each shall have a dedicated direct line (two direct lines in total from the ECC) to the Control Room Operator and if such direct line is not available for any reason, the Control Room Operator can be reached via outside telephone line at 000-000-0000 or 000-000-0000 or such other telephone line as the Plant shall provide. The Plant shall notify the District Operator of any change in their control room outside telephone number. • Additional System Operation procedures and policies govern the operating relationship between Con Edison and Xxxxxx Xxxxx includes, but is not limited to Rulebook, and System Operation Department’s Procedures. • In order to not exceed the nominal designed capacity of the Goethals Substation equipment in the case of a trip out of Con Edison feeders exiting Goethals Substation, the Plant shall reduce its MW output upon notification from the Con Edison District Operator or Con Edison System Operator. • Xxxxxx Xxxxx will operate the Plant and provide advance notification to the Con Edison Chief District Operator in the event that the Plant changes ownership or will be operated by a different entity. • The Plant shall respond to emergencies as directed by the Con Edison System Operator, and/or Con Edison District Operator. • The Plant shall provide to the Con Edison Chief System Operator, the generator’s MVAR capability curves and the Generator Step Up transformer’s No Load Tap Changer ranges and settings after each update. • The Plant shall maintain an updated list of personnel authorized by Xxxxxx Xxxxx to perform switching within the Plant. Updated lists shall be transmitted to the Con Edison Chief District Operator after each update, and as requested by Con Edison System Operations, and will be utilized when issuing operating orders The Plant shall ensure that a qualified control room operator will always be available at the Plant control room. • The Con Edison District Operator, when directed by the Con Edison System Operator, shall issue all orders to an authorized Plant Operator who will prepare an operating order and dispatch qualified operators to carry out the order in accordance with Section 5 of the Rulebook. • All changes in the operating status of equipment within the Con Edison jurisdictional boundaries shall be under the sole authority of the Con Edison System Operator, as stated in Section 2 of the Rulebook and in System Operation’s Department

Appears in 1 contract

Samples: Large Generator Interconnection Agreement

AutoNDA by SimpleDocs

Developer Operating Requirements. Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Developer must comply with Connecting Transmission Owner’s operating instructions and requirements which are set forth below. • This document describes the operating requirements between Con Edison’s System Operation Department and Xxxxxx Xxxxx Generation Plant (the “Plant”) connected to the Con Edison electrical system at Goethals 345KV Substation as illustrated on Goethals 60 cycles operating diagram 70. • Operating one-line diagram 9C shows the operating jurisdictional boundaries of Con Edison’s System Operation Department. • The Con Edison District Operator (“District Operator”) or Con Edison System Operator (“System Operator”) shall direct all operations on equipment within Con Edison’s jurisdictional boundaries in accordance with System Operation’s Department Procedures/Con Edison specifications and the Con Edison General Instructions Governing Work on System Electrical Equipment (the “Rulebook”). • Con Edison’s District Operator and System Operator each shall have a dedicated direct line (two direct lines in total from the ECC) to the Control Room Operator and if such direct line is not available for any reason, the Control Room Operator can be reached via outside telephone line at 000-000-0000 or 000-000-0000 or such other telephone line as the Plant shall provide. The Plant shall notify the District Operator of any change in their control room outside telephone number. • Additional System Operation procedures and policies govern the operating relationship between Con Edison and Xxxxxx Xxxxx includes, but is not limited to Rulebook, and System Operation Department’s Procedures. • In order to not exceed the nominal designed capacity of the Goethals Substation equipment in the case of a trip out of Con Edison feeders exiting Goethals Substation, the Plant shall reduce its MW output upon notification from the Con Edison District Operator or Con Edison System Operator. • Xxxxxx Xxxxx will operate the Plant and provide advance notification to the Con Edison Chief District Operator in the event that the Plant changes ownership or will be operated by a different entity. • The Plant shall respond to emergencies as directed by the Con Edison System Operator, and/or Con Edison District Operator. • The Plant shall provide to the Con Edison Chief System Operator, the generator’s MVAR capability curves and the Generator Step Up transformer’s No Load Tap Changer ranges and settings after each update. • The Plant shall maintain an updated list of personnel authorized by Xxxxxx Xxxxx to perform switching within the Plant. Updated lists shall be transmitted to the Con Edison Chief District Operator after each update, and as requested by Con Edison System Operations, and will be utilized when issuing operating orders The Plant shall ensure that a qualified control room operator will always be available at the Plant control room. • The Con Edison District Operator, when directed by the Con Edison System Operator, shall issue all orders to an authorized Plant Operator who will prepare an operating order and dispatch qualified operators to carry out the order in accordance with Section 5 of the Rulebook. • All changes in the operating status of equipment within the Con Edison jurisdictional boundaries shall be under the sole authority of the Con Edison System Operator, as stated in Section 2 of the Rulebook and in System Operation’s Department.

Appears in 1 contract

Samples: Service Agreement

Time is Money Join Law Insider Premium to draft better contracts faster.