Description of the ROU Project Sample Clauses

Description of the ROU Project. 2.1.1 The “ROU Project” includes:
AutoNDA by SimpleDocs

Related to Description of the ROU Project

  • Description of the Project THIS SHOULD BE NO MORE THAN A TWO PARAGRAPH DESCRIPTION THAT PROVIDES A BACKGROUND OF THE PROBLEM, AS WELL AS HOW THE CONTRACTOR INTENDS TO SOLVE THE PROBLEM. KEEP IN MIND THAT THE CONTRACT SHOULD “STAND ON ITS OWN,” I.E. ANYONE SHOULD BE ABLE TO PICK IT UP AND FIGURE OUT WHAT IS GOING ON.)

  • DESCRIPTION OF THE WORKS Employer’s objectives The scope of the request includes the recommended monthly preventative, quarterly and annual maintenance that needs to be conducted to ensure all areas of the airports are lit and compliant. It will include all the other adhoc request (labor rates) where required upon approval by the maintenance manager. The compliance will be based on the following: • Maintenance as per OEM • Organizational guidelines and codes of practice • OHS act 93 – Occupational Health and Safety • ISO 9001 – Quality management • ISO 14001 – Environmental Management • SANS 10142 – The wiring code • ICAO Annex 14 chapter 5. • ACSA Maintenance Procedure D060 024M This scope entails the maintenance and repair of LV systems and all lighting at Costal airports. In brief, maintenance involves servicing, repairs, and testing of lights and LV systems. This involves carrying out maintenance on electrical equipment such as LV DBs, electrical plant, wiring enclosures and luminaires and associated control systems, portable appliances and other specific electrical equipment, in order to minimize downtime, and ensure that the equipment performs at optimal levels and functions to specification at the specified areas. Servicing - performing routine preventive maintenance as prescribed by the original equipment manufacturer (OEM), ACSA’s planned maintenance routines, and applicable legal and design standards. Repairs – responding to breakdowns, callouts and restoring the equipment to safe working conditions on an as and when basis. Advisory – telephonically guiding airport electricians under emergency situations to ensure systems are safely shutdown or returned to service within stringent times. System Performance Test – Testing equipment performance against the OEM, ACSA, and statutory requirements for compliance and return to service purposes. Extent of the works The Contractor will be fully responsible for meeting all requirements in this document regarding the Works. For each piece of equipment, all work will be carried out to standards as required by the Original Equipment Manufacturer (OEM) as well as any applicable governing law and/or regulations. Where OEM standards differ from those required by this document the more stringent requirement shall apply. The Contractor will be fully responsible for obtaining (and keeping up to date with) said requirements. The proposed minimum scheduled maintenance activities can be found in annex H.

  • DESCRIPTION OF THE PROPERTY 13.1 The Property as referred to in the Proclamation of Sale shall be deemed to have been correctly and sufficiently described.

  • DESCRIPTION OF PROJECT The project for which PSP agrees to provide Professional Services is generally described as [Insert Brief Description of Project] (hereinafter referred to as the “Project”), as further described in Exhibit A, PSP’s Proposal dated [Insert Date and Proposal Number if provided], attached hereto and incorporated herein for all purposes and consisting of [Text] (Insert Number) pages.

  • Description of Projects Services

  • Description of the Transfer The details of the transfer and of the personal data are specified in Annex B. The parties agree that Annex B may contain confidential business information which they will not disclose to third parties, except as required by law or in response to a competent regulatory or government agency, or as required under clause I(e). The parties may execute additional annexes to cover additional transfers, which will be submitted to the authority where required. Annex B may, in the alternative, be drafted to cover multiple transfers. ANNEX A

  • Site Description 2.5.1 If reasonably requested by the A/E as necessary for the Project, the Owner shall furnish a legal description and a certified land survey of the Site, giving, as applicable, grades and lines of streets, alleys, pavements and adjoining property; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the Site; locations, dimensions, and complete data pertaining to existing buildings, other improvements, and trees; and full information concerning available service and utility lines, both public and private, above and below grade, including inverts and depths.

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • PROJECT 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Description of Work (a) that has been omitted or

Time is Money Join Law Insider Premium to draft better contracts faster.