Demurrage and Excess Boil‐off at Loading Port Sample Clauses

Demurrage and Excess Boil‐off at Loading Port. 5.1 Laytime used in loading an LNG Ship (“Used Laytime”) shall begin to count upon the earlier of (i) the LNG Ship being all fast in the berth, (ii) six (6) hours after the tendering of a valid NOR (provided the LNG Ship tenders NOR within the applicable Arrival Window) or (iii) 0600 hours Local Time on the first day of the applicable Arrival Window (provided the LNG Ship tendered a valid NOR prior to the Arrival Window) and shall end when the last loading arm is disconnected and the LNG Ship is cleared for departure and able to depart. If the LNG Ship tenders a valid NOR outside the applicable Arrival Window, while Seller shall exercise reasonable endeavours to berth the LNG Ship as soon as possible, Used Laytime shall only commence once the LNG Ship is all fast at the berth.
AutoNDA by SimpleDocs

Related to Demurrage and Excess Boil‐off at Loading Port

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • DELIVERY, STORAGE, AND HANDLING The Contractor shall be responsible to inspect all components on delivery to ensure that no damage occurred during shipping or handling for furnish and installation projects. For equipment only purchases, the ordering entity shall be responsible to inspect all components on delivery. Materials must be stored in original undamaged packaging in such a manner to ensure proper ventilation and drainage, and to protect against damage, weather, vandalism, and theft until ready for installation.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • DELIVERY: FOB DESTINATION, INSIDE DELIVERY, FREIGHT PAID Whenever possible, contractors should give the ordering entities 3 working days prior notice of any deliveries and/or installations. Furniture contractors will not be responsible for the removal/moving of existing furnishings unless requested by the ordering entity. Contractors should verify site readiness prior to delivery. All deliveries will be made during normal working hours unless otherwise arranged with the ordering entity. Contractor will communicate any scheduling delays and/or changes immediately. Agencies will not be responsible for any freight damage, concealed or otherwise.

  • Originating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • Transit Traffic The following rates will apply:

  • Tandem Transit Traffic 12.1 As used in this Section, Tandem Transit Traffic is Telephone Exchange Service traffic that originates on CBB's network, and is transported through Verizon’s Tandem to the subtending End Office or its equivalent of another carrier (CLEC, ILEC other than Verizon, Commercial Mobile Radio Service (CMRS) carrier, or other LEC (“Other Carrier”). Neither the originating nor terminating customer is a Customer of Verizon. Subtending End Offices shall be determined in accordance with and as identified in the Local Exchange Routing Guide (LERG). Switched Exchange Access Service traffic is not Tandem Transit Traffic.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from CBB to Verizon, CBB, at CBB’s own expense, shall:

  • Dark Fiber Transport Dark Fiber Transport is defined as Dedicated Transport that consists of unactivated optical interoffice transmission facilities without attached signal regeneration, multiplexing, aggregation or other electronics. Except as set forth in Section 6.9.1 below, BellSouth shall not be required to provide access to Dark Fiber Transport Entrance Facilities pursuant to this Agreement.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and ICG, ICG shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks, and the Entrance Facility on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

Time is Money Join Law Insider Premium to draft better contracts faster.