Data Regarding High-Value Construction & Remodel Permits Sample Clauses

Data Regarding High-Value Construction & Remodel Permits. For each High-Value Construction & Remodel Permit, the Satellite shall document, in spreadsheet format, the permits issued during the Fiscal Year, the APN and address associated with the permit, and whether a Compliance Certificate was submitted prior to issuance of the certificate(s) of occupancy, and shall provide this spreadsheet to the District after each Fiscal Year by July 31. The City of Alameda shall note on the spreadsheet any properties located in Alameda Point.
AutoNDA by SimpleDocs
Data Regarding High-Value Construction & Remodel Permits. For each High-Value Construction & Remodel Permit, the Satellite shall document, in spreadsheet format, the permits issued during the Fiscal Year, the APN and address associated with the permit, and whether a Compliance Certificate was submitted prior to issuance of the certificate(s) of occupancy, and shall provide this spreadsheet to the District after each Fiscal Year by July 31.
Data Regarding High-Value Construction & Remodel Permits. For each High-Value Construction & Remodel Permit, the Satellite shall document, in spreadsheet format, the permits issued during the Fiscal Year, the APN and address associated with the permit, and whether a Compliance Certificate was submitted prior to issuance of the certificate(s) of occupancy, and shall provide this spreadsheet to the District after each Fiscal Year by July 31. The City of Oakland shall note on the spreadsheet any properties located in the Port of Oakland.

Related to Data Regarding High-Value Construction & Remodel Permits

  • Suspension of unsafe Construction Works (i) Upon recommendation of the Authority’s Engineer to this effect, the Authority may by notice require the Contractor to suspend forthwith the whole or any part of the Works if, in the reasonable opinion of the Authority’s Engineer, such work threatens the safety of the Users and pedestrians.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Coordination of Design and Construction Contract Documents 5.5.1 Review model(s), Drawings, Specifications and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.

  • BUILDER’S RISK FOR NEW CONSTRUCTION PROJECTS If the project is NEW CONSTRUCTION, then the following provisions apply:

  • Project Construction Budget The project construction cost allowance specifically stated in writing as the ‘revised’ or ‘current’ ‘Project Construction Budget’ by the Trustees at each applicable phase of plan development.

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.

  • BUILDER’S RISK FOR CONSTRUCTION RENOVATION PROJECTS If the project is CONSTRUCTION RENOVATION of an existing structure, and the State has already determined that Contractor will not be obligated to obtain and maintain Builder’s Risk insurance, then the following provisions apply:

Time is Money Join Law Insider Premium to draft better contracts faster.