Data Management and Documentation Requirements Sample Clauses

Data Management and Documentation Requirements. Describe how analytical data and results will be evaluated, documented and managed, including development of an analytical database. State the criteria that will be used by the project team to review and determine the quality of data. The O&M Plan shall specify that the Respondent collect and maintain the following information: a. Progress Report Information ➢ Work Accomplishments (e.g., performance levels achieved, hours of treatment operation, treated and/or excavated volumes, concentration of contaminants in treated and/or excavated volumes, nature and volume of wastes generated, etc.). ➢ Record of significant activities (e.g., sampling events, inspections, problems encountered, action taken to rectify problems, etc.). b. Monitoring and laboratory data; and c. Personnel, maintenance and inspection records. DTSC may require that the Respondent submit additional reports that evaluate the effectiveness of the interim measure in meeting the stabilization goal.
Data Management and Documentation Requirements. Describe how analytical data and results will be evaluated, documented and managed, including development of an analytical database. State the criteria that will be used by the project team to review and determine the quality of data. The O&M Plan shall specify that the Owner/Operator or Respondent collect and maintain the following information: a. Progress Report Information o Work Accomplishments (e.g., performance levels achieved, hours of treatment operation, treated and/or excavated volumes, concentration of contaminants in treated and/or excavated volumes, nature and volume of wastes generated, etc.). o Record of significant activities (e.g., sampling events, inspections, problems encountered, action taken to rectify problems, etc.). b. Monitoring and laboratory data; c. Records of operating costs; and d. Personnel, maintenance and inspection records. These data and information should be used to prepare Progress Reports and the Corrective Measure Completion Report.
Data Management and Documentation Requirements. Describe how analytical data and results will be evaluated, documented and managed, including development of an analytical database. State the criteria that will be used by the project team to review and determine the quality of data. The Construction Workplan shall specify that the Owner/Operator or Respondent collect and maintain the following information: a. Progress Report Information o Work Accomplishments (e.g., hours of operation, excavated volumes, nature and volume of wastes generated, area of cap completed, length of trench completed, etc.). o Record of significant activities (e.g., sampling events, inspections, problems encountered, action taken to rectify problems, etc.). b. Monitoring and laboratory data; c. Records of construction costs; and d. Personnel, maintenance and inspection records. This data and information should be used to prepare progress reports and the Construction Completion Report.

Related to Data Management and Documentation Requirements

  • Documentation Requirements ODM shall pay the MCP after it receives sufficient documentation, as determined by ODM, detailing the MCP’s Ohio Medicaid-specific liability for the Annual Fee. The MCP shall provide documentation that includes the following: 1. Total premiums reported on IRS Form 8963;

  • Personnel Requirements and Documentation Grantee will; 1. maintain current personnel documentation on each employee. All documents must be factual and accurate. Health-related information must be stored separately with restricted access as appropriate under Tex. Gov. Code §552.102. Training records may be stored separately from the main personnel file but must be easily accessible upon request. Required documentation includes the following, as applicable: i. A copy of the current job description signed by the employee; ii. Application or resume with documentation of required qualifications and verification of required credentials; iii. Verification of work experience; iv. Annual performance evaluations; v. Personnel data that includes date hired, rate of pay, and documentation of all pay increases and bonuses; vi. Documentation of appropriate screening and/or background checks, to include probation or parole documentation; vii. Signed documentation of initial and other required training; and viii. Records of any disciplinary actions. 2. document authentication must include signature, credentials when applicable, and date. If the document relates to past activity, the date of the activity must also be recorded. Documentation must be permanent and legible. When it is necessary to correct a required document, the error must be marked through with a single line, dated, and initialed by the writer.

  • Documentation Required The certificates and endorsements shall be received and approved by the District before Work commences. As an alternative, the Contractor may submit certified copies of any policy that includes the required endorsement language set forth herein.

  • Construction Requirements (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required. (b) Electric panel schedules must be brought up to date identifying all new circuits added. (c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate. (d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present. (e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service. (f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times. (g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor: [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION. (i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid. (ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. (iii) The Building Engineer will inspect the construction on a periodic basis as well. (j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.

  • Installation requirements As may be further described and set forth in the Scope of services, all installation, integration, and other potentially public works construction activities which may be contemplated by Contractor, shall be performed in accordance with all applicable, laws, rules, and regulations of the District.