Cycle control joints at the ends Sample Clauses

Cycle control joints at the ends of the approach slabs shall be located at least 1 m beyond the ends of the wing walls by extending the length of the approach slab. A sleeper slab shall be provided under the approach fill end of the approach slab. Drainage shall be provided beneath the joint between the approach slab and sleeper slab to drain water away from the abutment.
AutoNDA by SimpleDocs

Related to Cycle control joints at the ends

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • DOCUMENTS AND SAMPLES AT THE SITE 4.11.1 The Contractor shall maintain at the site for the State one record copy of all Drawings, Specifications, Addenda, Change Orders and other modifications, in good order and marked currently to record all changes made during construction, and approved Shop Drawings, Product Data and Samples. These shall be available to the Architect and the State for monthly review prior to approval of Contractor’s monthly application for payment. Prior to substantial completion of the Work, the Contractor shall ensure that one record copy of all Drawings, Specifications, Addenda, Change Orders and other Modifications, in good order and marked currently to record all changes made during construction, and approved Shop Drawings, Product Data and Samples are delivered to the Architect for the State and a duplicate copy shall be delivered to the State for the State’s use.

  • AT THE END OF THE TENANCY 2.9 The Landlord/Xxxxxxxx’s Agent must tell the Tenant as soon as possible if there are any proposed deductions from the Deposit.

  • DOCUMENTS AT THE SITE (a) Project Co shall keep one copy of the current digital files of the Contract Documents, Construction Schedule, submittals, reports, Supplementary Instructions, Change Orders, Contemplated Change Notices, Change Directives, Design Issue resolution documents, partnering documents, records of meetings and all other documents necessary for the administration of the Project at the Site, all in good order and available to Owner, Xxxxxx’s Consultant and the Consultant. Project Co shall keep a daily log available to Owner, Xxxxxx’s Consultant and the Consultant at all times.

  • Pest Control A. Whenever a department utilizes a pest control chemical in State owned or managed buildings/grounds, the department will provide at least forty-eight (48) hours notice prior to application of the chemical, unless an infestation occurs which requires immediate action. Notices will be posted in the lobby of the building and will be disseminated to building tenant contacts.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Infection Control Consistent with the Centers for Disease Control and Prevention Guideline for Infection Control in Health Care Personnel, and University Policy 3364-109-EH-603, the parties agree that all bargaining unit employees who come in contact with patients in the hospital or ambulatory care clinics will need to be vaccinated against influenza when flu season begins each fall. The influenza vaccine will be offered to all health care workers, including pregnant women, before the influenza season, unless otherwise medically contraindicated or it compromises sincerely held religious beliefs.

  • Construction Preparation Period 2.1.3 Construction Management Plan

  • C4 Contract Price During Extension of the Initial Contract Period C4.1 Subject to the Pricing Schedule and the provision in clause F6 (Variation), the Contract Price shall apply for the Initial Contract Period and following an extension pursuant to clause F8 (Extension of Initial Contract Period), to the date of expiry of the extended period, or such earlier date of termination or partial termination of the agreement in accordance with the Law or the provisions of the Contract. C5 Euro

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS A. Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

Time is Money Join Law Insider Premium to draft better contracts faster.