Connectivity and Speeds Sample Clauses

Connectivity and Speeds. Customer may choose from a variety of port speed options based on the below selections. Actual speeds and availability are dependent upon the customers distance between the closest line-of-sight network tower and ground cover interference. Lackawanna County will make every effort to get the customer the bandwidth speeds requested. Prices will be quoted based on customer need, location, line-of-sight, availability, installation, and subscriber unit needed. • Services available; private point-to-point connection, DIA Tier-2 (dedicated internet access), point-to-multipoint • Last Mile; last mile applications, engineering, mobility, hardware solutions may be available as a service • Availability; speeds between 5Mbps and 1Gbps
AutoNDA by SimpleDocs
Connectivity and Speeds. Customer may choose from connectivity and port speed options listed in the table below. Additional options may be available on an individual case basis. Table N.1—Dedicated Internet Connectivity and Speed Options Access/Port Speed DS-1 Ethernet DS-3 Fast Ethernet OC-3 OC-12 Gigabit Ethernet PPP Yes NA Yes NA Yes Yes NA Frame Yes NA Yes NA Yes NA NA ATM Yes NA Yes NA Yes Yes NA SONET NA NA NA NA Yes Yes NA ETHERNET NA Yes NA Yes NA NA Yes

Related to Connectivity and Speeds

  • Connectivity User is solely responsible for providing and maintaining all necessary electronic communications with Exchange, including, wiring, computer hardware, software, communication line access, and networking devices.

  • Construction Services 4,500 thousand SDR for Japan Post in Group A 15,000 thousand SDR for all other entities in Group A 4,500 thousand SDR for entities in Group B Architectural, engineering and other technical services covered by this Agreement: 450 thousand SDR Other services: 130 thousand SDR List of Entities which procure the services, specified in Annex 4:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Registry Interoperability and Continuity Registry Operator shall comply with the Registry Interoperability and Continuity Specifications as set forth in Specification 6 attached hereto (“Specification 6”).

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Speed The relative importance we attach is “high”.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.