Common use of Conduit Installation Clause in Contracts

Conduit Installation. A. All building wiring shall be installed in rigid steel conduit, IMC, EMT, flexible metallic conduit (greenfield) or PVC, as allowed by NEC. Routing of conduits shall be as required by job conditions. B. Steel conduit, tubing and fittings shall be galvanized or sheradized. Connectors and couplings shall be galvanized steel or compression type; indented type fittings will NOT be acceptable. Couplings used in connections to equipment of rigid conduit shall be with a locknut and bushing or threaded hubs. C. The installations of conduits or pullboxes for electrical feeders shall be adjusted before installation to avoid conflicts between the locations of conduit runs, piping and ductwork. In general, large pipe mains and air duct shall be given priority in available space. Conduit runs shall be installed so as to maintain, wherever practical, a minimum separation of three inches (3") from water and waste piping. D. Pull boxes sized in compliance with code requirements shall be provided where necessary for pulling wires.

Appears in 1 contract

Sources: Single Tenant Lease Agreement (Recovery Engineering Inc)

Conduit Installation. A. All building wiring shall be installed in rigid steel conduit, IMC, EMT, flexible metallic conduit (greenfield) or PVC, as allowed by NEC. Routing of conduits shall be as required by job conditions. B. Steel conduit, tubing and fittings shall be galvanized or sheradized. Connectors and couplings shall be galvanized steel or compression type; indented type fittings will NOT be acceptable. Couplings used in connections to equipment of rigid conduit shall be with a locknut and bushing or threaded hubs. C. The installations of conduits or pullboxes for electrical feeders shall be adjusted before installation to avoid conflicts between the locations of conduit runs, piping and ductwork. In general, large pipe mains and air duct shall be given priority in available space. Conduit runs shall be installed so as to maintain, wherever practical, a minimum separation of three inches (3") from water and waste piping. D. Pull boxes sized in compliance with code requirements shall be provided where necessary for pulling wires. E. Where conduit runs terminate at a motor, transformer, control device or other rotating or vibrating equipment, furnish and install a short piece of flexible sealtite between the motor and the conduit or outlet box.

Appears in 1 contract

Sources: Lease Agreement (Recovery Engineering Inc)