Conductor. No requirement as this is not defined as a WBE. 5.3 Surface casing: Shall be defined based on load conditions from wellhead equipment and operations. TOC should be inside the conductor shoe, or to surface/seabed if no conductor is installed 5.4 Casing through hydrocarbon bearing formations: Shall be defined based on requirements for zonal isolation. Cement should cover potential cross-flow interval between different reservoir zones. For cemented casing strings which are not drilled out, the height above a point of potential inflow/ leakage point / permeable formation with hydrocarbons, shall be 200 m, or to previous casing shoe, whichever is less. 6. Temperature exposure, cyclic or development over time, shall not lead to reduction in strength or isolation capability.
Appears in 2 contracts
Sources: Grant Agreement, Grant Agreement