Common use of Conductor Clause in Contracts

Conductor. all labor, equipment, and materials required to set a conductor casing to begin plugging, if necessary. Contractor shall use new pipe, unless Contractor submits documentation to ODNR and ODNR approves used pipe that has been tested and drifted. SURFACE CASING: the labor, equipment, and materials required to set a surface casing for the plugging of the Well, if necessary. Contractor shall use new pipe, unless Contractor submits documentation to ODNR and ODNR approves used pipe that has been tested and drifted. LOGGING: all labor, equipment, and materials if necessary to log the Well. WELL PREPARATION & PLUG SETTING: the labor, equipment, and materials necessary to prepare the Well for plugging and to complete all required plugs, including drilling, cleanout of the Wellbore to the total depth of the Well, circulating the Wellbore prior to each plug, setting all required plugs, and verification of each plug depth. See Ohio Administrative Code 1501:9-11. If an obstruction is encountered and total depth cannot be achieved, Contractor shall propose a plan to assess the nature of the obstruction and remove the obstruction, if possible, that ODNR may approve. If necessary, Contractor shall rip the casing or tubing at a depth approved by ODNR. If a string of casing that would normally be pulled cannot be removed, Contractor may need to log the well and perforate the casing, in accordance with the approved Plugging Plan, so that cement can be emplaced behind the casing. If caving of the well prevents clean out to depth, the Contractor may be required at the discretion of the Division to run an operational string of casing. Contractor shall set all plugs as described in the approved Plugging Plan in the Scope of Work to the Agreement to the depths set forth with the materials described. Contractor shall allow all plugs to set for the time set forth in the approved Plugging Plan in the Scope of Work to the Agreement. TUBING: all labor, equipment, and materials required to supply and remove tubing at the Well Site for the purposes of placement of cement and spacers. CEMENT: all labor, equipment, and materials necessary to plug the Well as is required under Ohio Revised Code Chapter 1509 and Ohio Administrative Code 1501:9 and the requirements of the Plugging Project. Contractor must plug all ▇▇▇▇▇ with cement.

Appears in 3 contracts

Sources: Landowner Pass Through Agreement, Landowner Pass Through Agreement, Landowner Pass Through Agreement