Conducting Assessment Sample Clauses

Conducting Assessment. Each Phase II Environmental Assessment shall be conducted: (A) only after advance notice of such assessment has been provided to Seller at least 10 Days prior to the date of the assessment; and (B) in a manner reasonably designed to minimize the interruption of Seller’s operations and use of the Company-Owned Site. Company shall repair any substantial damage to the Company-Owned Site or to the Facility that is directly caused by Company (but not the environmental consultant) during the Phase II Environmental Assessment.
AutoNDA by SimpleDocs

Related to Conducting Assessment

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Environmental Assessment In connection with its surrender of the Premises, Tenant shall submit to Landlord, at least fifteen (15) days prior to the expiration date of this Lease (or in the event of an earlier termination of this Lease, as soon as reasonably possible following such termination), an environmental Assessment of the Premises by a competent and experienced environmental engineer or engineering firm reasonably satisfactory to Landlord (pursuant to a contract approved by Landlord and providing that Landlord can rely on the Environmental Assessment). If such Environmental Assessment reveals that remediation or Clean-up is required under any Environmental Laws that Tenant is responsible for under this Lease, Tenant shall submit a remediation plan prepared by a recognized environmental consultant and shall be responsible for all costs of remediation and Clean-up, as more particularly provided in Section 5.3, above.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Environmental Inspection 10 ARTICLE XI................................................................ 11 11.1 Modifications, Substitutions and Replacements............... 11

  • Environmental Inspections In the event Landlord has a reasonable basis to believe that Tenant is in breach of its obligations under Sections 32.1 through 32.4, Landlord shall have the right, from time to time, during normal business hours and upon not less than five (5) Business Days written notice to Tenant (except in the case of an emergency that constitutes an imminent threat to human health or safety or damage to property, in which event Landlord shall undertake reasonable efforts to notify a representative of Tenant as soon as practicable under the circumstances), to conduct an inspection of the Leased Property or any portion thereof (and Tenant shall be permitted to have Landlord or its representatives accompanied by a representative of Tenant) to determine the existence or presence of Hazardous Substances on or about the Leased Property or any portion thereof. In the event Landlord has a reasonable basis to believe that Tenant is in breach of its obligations under Sections 32.1 through 32.4, Landlord shall have the right to enter and inspect the Leased Property or any portion thereof, conduct any testing, sampling and analyses it reasonably deems necessary and shall have the right to inspect materials brought into the Leased Property or any portion thereof. Landlord may, in its discretion, retain such experts to conduct the inspection, perform the tests referred to herein, and to prepare a written report in connection therewith if Landlord has a reasonable basis to believe that Tenant is in breach of its obligations under Sections 32.1 through 32.4. All costs and expenses incurred by Landlord under this Section 32.6 shall be the responsibility of Landlord, except solely to the extent Tenant has breached its obligations under Sections 32.1 through 32.5, in which event such reasonable costs and expenses shall be paid by Tenant to Landlord as provided in Section 32.4. Failure to conduct an environmental inspection or to detect unfavorable conditions if such inspection is conducted shall in no fashion constitute a release of any liability for environmental conditions subsequently determined to be associated with or to have occurred during Tenant’s tenancy. Tenant shall remain liable for any environmental condition related to or having occurred during its tenancy regardless of when such conditions are discovered and regardless of whether or not Landlord conducts an environmental inspection at the termination of this Lease. The obligations set forth in this Article XXXII shall survive the expiration or earlier termination of this Lease but in no event shall Article XXXII apply to matters first occurring after the later of (x) the end of the Term and (y) the date upon which Tenant shall have vacated the Leased Property and surrendered the same to Landlord, in each case to the extent such matters are not or were not caused by the acts or omissions of Tenant in breach of this Lease.

  • Environmental Studies Promptly conduct and complete, at Borrower’s expense, all such investigations, studies, samplings and testings as may be requested by Lender or any governmental authority relative to any substance, or any waste or by-product of any substance defined as toxic or a hazardous substance under applicable federal, state, or local law, rule, regulation, order or directive, at or affecting any property or any facility owned, leased or used by Borrower.

  • Needs Assessment The determination of whether the Annual Income of a family or individual occupying or seeking to occupy a Qualifying Unit complies with the requirements for Extremely Low-Income Households or Low- to Moderate-Income Households shall be made by the applicable housing authority in the CDBG-DR Program area prior to admission of such family or individual to occupancy of a Qualifying Unit.

  • Environmental Site Assessment Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Safety Inspection During inspection of County facilities conducted by the State Division of Occupational Safety and Health for the purpose of determining compliance with the California OSHA requirements, an OCEA designated employee shall be allowed to accompany the inspector while the inspector is in the employee's agency/department. The employee so designated shall suffer no loss of pay when this function is performed during the employee's regularly scheduled work hours.

  • Environmental Audit Upon reasonable notice, Director shall have the right but not the obligation to conduct or cause to be conducted by a firm acceptable to Director, an environmental audit or any other appropriate investigation of the Premises for possible environmental contamination. Such investigation may include environmental sampling and equipment and facility testing, including the testing of secondary contamination. No such testing or investigation shall limit Tenant’s obligations hereunder or constitute a release of Tenant’s obligations therefor. Tenant shall pay all costs associated with said investigation in the event such investigation shall disclose any Hazardous Materials contamination as to which Tenant is liable hereunder.

Time is Money Join Law Insider Premium to draft better contracts faster.