Concrete – Structural Sample Clauses

Concrete – Structural a. Sample the fresh concrete for slab-on-grade and grade beams and perform required tests, including slump, air content, concrete temperature, and cast test specimens during placements. b. Perform compressive tests of concrete test cylinders cast in the field. c. Observe reinforcing steel prior to concrete placement. We will observe the rebar size, spacing and configuration.

Related to Concrete – Structural

  • Structural 3.4.1. Layout structural systems with dimensions and floor elevations. Identify structural systems (including pre-cast, structural steel with composite deck, structural steel bar joists); with preliminary sizing identified. 3.4.2. Identify foundation systems (including fill requirements, piles, caissons, spread footings); with preliminary sizing identified.

  • Buildings and Structures 1. Repair or retrofit of buildings less than 45 years old. 2. Removal of water by physical or mechanical means. 3. Installation of exterior security features and early warning devices on existing light poles or other permanent utilities.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;

  • Building Systems “Building Systems” shall mean all structural elements and components, mechanical equipment, plumbing systems, electrical systems and life safety systems and fixtures incorporated in the Improvements, including, without limitation, HVAC, elevator, electrical, plumbing, utility, fire and life safety and swimming pool.