Colours and Finishing Built Green® Tip Sample Clauses

Colours and Finishing Built Green® Tip. Paints or finishes made from recycled content are environmentally friendly because recycling paint reduces the hazardous waste in landfills. Details Colours cannot be repeated within 2 lots on the same side of the street (XOAX) and will not be permitted directly across the street. Contrasting siding and trim colours are mandatory.
AutoNDA by SimpleDocs

Related to Colours and Finishing Built Green® Tip

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • FIXTURES AND FITTINGS 7.13.1 Not to remove any of the Fixtures and Fittings from the Premises to store the same in the loft, basement or garage (if any) without obtaining the Landlord’s prior written consent, such consent not to be unreasonably withheld, and then to ensure that any such items are stored safely and upon vacating the Premises, to leave the same in the places in which they were on the Commencement Date.

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • FABRICATION Making up data or results and recording or reporting them.

  • Particular Methods of Procurement of Goods and Works International Competitive Bidding. Goods and works shall be procured under contracts awarded on the basis of International Competitive Bidding.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Other Methods of Procurement of Goods and Works The following table specifies the methods of procurement, other than International Competitive Bidding, which may be used for goods and works. The Procurement Plan shall specify the circumstances under which such methods may be used: Procurement Method

  • Solicitations for Subcontracts, Including Procurement of Materials and Equipment In all solicitation, either by competitive bidding or negotiation, made by the Contractor for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential Subcontractor or supplier shall be notified by the Contractor of the Contractor’s obligations under this Agreement and the Regulations relative to non-discrimination on the grounds of race, color, or national origin.

  • Accessories, Spare Parts and Tools 1. In determining whether all the non-originating materials used in the production of a good undergo the applicable change in tariff classification or a specific manufacturing or processing operation set out in Annex 2, accessories, spare parts or tools delivered with the good that form part of the good's standard accessories, spare parts or tools, shall be disregarded, provided that:

Time is Money Join Law Insider Premium to draft better contracts faster.