Climate Forcing Sample Clauses

Climate Forcing. Sulfur Cycle (Production of NSS from DMS).
AutoNDA by SimpleDocs
Climate Forcing. Eight meteorological inputs were used to drive all the three agro-DGVMs and DSSAT-CSM crop model: rainfall (mm.day-1), solar radiation (Wm-2), minimum and maximum temperature (K), wind speed (m.s-1), the surface air pressure (hPa) and the specific humidity (kg.kg-1). All the forcing data was available at a daily time step and at 0.5° resolution. Note that ORCHIDEE needs all these eight variables, DSSAT needs four variables (rain, min and max temperature and solar radiation) whereas LPJ models only needs three variables (rain, surface air temperature and solar radiation).

Related to Climate Forcing

  • Climate Xxxxx Power Station is situated in a summer rainfall area with an average annual precipitation of about 750 mm falling almost entirely during the months of October to April. The average rainfall per month generally exceeds 40 mm during this period, although drought periods do occur which can last for 20 days or longer. Drought periods occur most frequently during the months of October/November and March/April. January is statistically the highest rainfall month with an average monthly rainfall of about 130 mm. June has the lowest rainfall with an average monthly rainfall of about 7 mm. Approximately 85% of the annual rainfall occurs in the summer months and heavy falls of 125 to 150 mm occasionally occur in a single day. The annual average number of thunderstorms is about 75. These storms are often violent with severe lightning and strong (but short-lived) gusty winds and are sometimes accompanied by hail. This region has among the highest hail frequencies in South Africa; about 4 to 7 occurrences (depending mainly on altitude) may be expected annually. January is normally the hottest month with an average daily maximum temperature of 27°C with a mean daily temperature in winter being about 16°C. Winter average daily temperatures vary from 18, 5°C maximum to -1°C minimum. The extreme temperatures recorded range from 34, 7°C to minus 12, 4°C for the period 1920 - 1984. (Source: Weather Bureau, Pretoria) Winds are generally light to moderate except during thunderstorms. Generally the prevailing wind directions are from the North West during the day and from the east at night. During daytime, the prevailing winds are from the north-western direction. During night-time, the prevailing winds are from the north-eastern direction. The highest recorded average wind speed is 17, 6 km/hour. The average wind velocity over the year is 14, 5 km/hour.

  • Uncovering and Correction of Work 12 Uncovering of Work 12.1 Unforeseen Conditions, Concealed or Unknown 3.7.4, 8.3.1, 10.3 Unit Prices 7.3.3.2, 9.1.2

  • Access to the Workplace Union health and safety staff or Union consultants shall be provided access to the workplace and to attend meetings of the committee or Union committee or for inspecting, investigating or monitoring the workplace.

  • Watering C.10.1. The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters. If natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil.

  • Workplace Violence Prevention A. In order to provide a safe and healthy workplace for employees, the State agrees to develop and implement "Workplace Violence Prevention" policies and programs.

  • Information Technology Accessibility Standards Any information technology related products or services purchased, used or maintained through this Grant must be compatible with the principles and goals contained in the Electronic and Information Technology Accessibility Standards adopted by the Architectural and Transportation Barriers Compliance Board under Section 508 of the federal Rehabilitation Act of 1973 (29 U.S.C. §794d), as amended. The federal Electronic and Information Technology Accessibility Standards can be found at: xxxx://xxx.xxxxxx-xxxxx.xxx/508.htm.

  • Access Rights for implementation Access Rights to Results and Background Needed for the performance of the own work of a Party under the Project shall be granted on a royalty-free basis, unless otherwise agreed for Background in Attachment 1.

  • Migration MCK shall provide all requisite assistance as is reasonably requested by NewCo in order to migrate the Services from MCK’s personnel, facilities and environment to NewCo’s (or its designee’s) personnel, facilities and environment, provided, that, other than as expressly set forth in the Service Schedule, NewCo shall be responsible for all third-party costs incurred by MCK and its Affiliates to migrate such Services and, provided further, that, NewCo shall be responsible for all costs associated with operational decisions made by NewCo for its set-up costs and costs to procure items (e.g., selection of Customer Relationship Management software). For the avoidance of doubt, NewCo will be responsible for migration to any new NewCo Data Center, including design, implementation and testing. MCK will provide reasonable support in such efforts. MCK will provide to NewCo an electronic copy in the then-current format of all data that is owned by NewCo (a) a written description of processes and procedures used by MCK in connection with the provision of Services to the Core MTS Business to the extent such descriptions exist, (b) a written description of all system documentation, architecture diagrams and business process diagrams for the systems, processes and controls used in the Core MTS Business to the extent such descriptions exist and (c) written training and onboarding materials used in the Core MTS Business to the extent such materials exist. In addition, MCK will, upon NewCo’s reasonable request, make available knowledgeable MCK personnel for knowledge transfer and discussion at a mutually agreed upon time with respect to the Services and the processes, procedures and systems used in the provision of the Services. The parties will meet in person to establish, within two (2) weeks following the Closing Date, a planning process for the migration of the Services from MCK’s personnel, facilities and environment to NewCo’s (or its designee’s) personnel, facilities and environment. During such meetings, the parties will identify workstreams and workstream leaders, staff project teams for each workstream, identify roles and responsibilities for project team members and create a project charter that will serve collectively as the basis for developing more detailed timelines and specific deliverables for each of the workstreams. At a minimum, there will be a workstream for each functional area that is the subject of Schedules. Each workstream will report to the Project Managers. The parties will meet (in person or by telephone) as often as is reasonably necessary to develop such detailed timelines and specific deliverables for each workstream.

  • Filtering Company may employ various filtering methods to reduce unwanted content, such as SPAM e-mail, from reaching Your Company Account. You acknowledge and agree that such methods may prevent legitimate content from reaching Your Account and that Company will not be liable therefor.

  • Transportation of Students Employees will not be required to transport students.

Time is Money Join Law Insider Premium to draft better contracts faster.